X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24412"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24412
 
| Well ID: 34-111-24412
 +
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.81822479, -81.30405807 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2013-11-02
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
| Violations:
+
| Violations: 0
 
|-
 
|-
| Latitude:
+
| Latitude: 39.81822479
 
|-
 
|-
| Longitude:
+
| Longitude: -81.30405807
 
|-
 
|-
 
|}
 
|}
Line 42: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 1044868.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 90.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 471937.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 194.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 353548.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 54.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -107011558
 
| -107011558
 
| 2014-02-03
 
| 2014-02-03
|
+
|  
 
| Status check inspection on the current drilling progress found the current drilling depth to be 7,996' and the company beginning the horizontal well bore curve section with a current azimuth of 38.18 degrees and inclination of 65.48 degrees. The company is operating on a 21 day blow out preventer test cycle time period.
 
| Status check inspection on the current drilling progress found the current drilling depth to be 7,996' and the company beginning the horizontal well bore curve section with a current azimuth of 38.18 degrees and inclination of 65.48 degrees. The company is operating on a 21 day blow out preventer test cycle time period.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1649848330
 
| 2013-11-12
 
|
 
| Status check inspection on the current drilling of the surface borehole found the well bore total drilling depth has been reached at 413' using a 26'' diameter drill bit. The rig Kelly bushing is 11'.
 
|
 
|
 
|
 
|-
 
|-
 
| -1769440351
 
| 2013-12-12
 
|
 
| Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral.
 
|
 
|
 
|
 
|-
 
|-
 
| -1973906257
 
| 2014-06-09
 
|
 
|  Status check inspection on the workover process found Key Completion Service workover rig on the hole with Cudd services providing well head control, the company is currently running in the hole to drill out the completion plugs. The company completion supervisor Don Meador was on site and we discussed the drill out balanced drilling and well head control procedure along with the work over blow out preventer test in which I received the charted tests for.
 
|
 
|
 
|
 
|-
 
|-
 
| -60339106
 
| 2014-01-27
 
|
 
| Status check inspection on the drilling progress found the current drilling depth to be 6,042' in the 12.250'' 2nd intermediate well bore section with a proposed total depth to be drilled of 7,149'. The company is misting 3% KCL.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1383439976
 
| 1383439976
 
| 2013-11-02
 
| 2013-11-02
|
+
|  
 
| The said well was spudded on 11/02.2013 with 100' of 26'' conductor to be set inside a 32'' well bore. Fresh water was hit at 4' while setting the cellar.
 
| The said well was spudded on 11/02.2013 with 100' of 26'' conductor to be set inside a 32'' well bore. Fresh water was hit at 4' while setting the cellar.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1384560714
 
| 1384560714
 
| 2013-11-15
 
| 2013-11-15
|
+
|  
 
| Inspection found the current drilling depth to be 1164' using a 17.5'' bit with the next casing point to be 2000', Gyro Deviation borehole surveys are being taken every 250' with the last survey at 1033' showing a inclination of .31 degrees.
 
| Inspection found the current drilling depth to be 1164' using a 17.5'' bit with the next casing point to be 2000', Gyro Deviation borehole surveys are being taken every 250' with the last survey at 1033' showing a inclination of .31 degrees.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1384799877
 
| 1384799877
 
| 2013-11-18
 
| 2013-11-18
|
+
|  
 
| Status check inspection found the drilling company Falcon rig # 20 has completed the drilling and running of the 13.375'' 1st intermediate casing string with 2070' of 17.5'' hole drilled and 2070' of 13.375'' casing set inside of a 17.5'' borehole with 73 barrels of cement returns to surface, inspector did not witness the surface cement job due to being in a mandatory training meeting on 11/17/2013.
 
| Status check inspection found the drilling company Falcon rig # 20 has completed the drilling and running of the 13.375'' 1st intermediate casing string with 2070' of 17.5'' hole drilled and 2070' of 13.375'' casing set inside of a 17.5'' borehole with 73 barrels of cement returns to surface, inspector did not witness the surface cement job due to being in a mandatory training meeting on 11/17/2013.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1386943834
 
| 1386943834
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
| On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon.
 
| On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1391997681
 
| 1391997681
 
| 2014-02-09
 
| 2014-02-09
|
+
|  
| Notification was received by the company man on site by phone that the total drilling depth has been reached at 14,882' and the were conditioning the hole in anticipation of pulling out of the hole with the drill string to begin running the production casing.
+
| Notification was received by the company man on site by phone that the total drilling depth has been reached at 14,882' and the were conditioning the hole in anticipation of pulling out of the hole with the drill string to begin running the production casing.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1649848330
 +
| 2013-11-12
 +
|
 +
| Status check inspection on the current drilling of the surface borehole found the well bore total drilling depth has been reached at 413' using a 26'' diameter drill bit. The rig Kelly bushing is 11'.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1769440351
 +
| 2013-12-12
 +
|
 +
| Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1973906257
 +
| 2014-06-09
 +
|
 +
| Status check inspection on the workover process found Key Completion Service workover rig on the hole with Cudd services providing well head control, the company is currently running in the hole to drill out the completion plugs. The company completion supervisor Don Meador was on site and we discussed the drill out balanced drilling and well head control procedure along with the work over blow out preventer test in which I received the charted tests for.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 427339870
 
| 427339870
 
| 2014-01-22
 
| 2014-01-22
|
+
|  
 
| Status check inspection found the current drilling depth to be 3,349' in the 12.250''2nd intermediate well bore section with the company using directional drilling tools with a inclination of 4.76 and azimuth of 86.26 degrees. The company has completed the required deviating for this section and is preparing to pull out of the hole with the directional tolls and pick up a 12.250'' hammer bit and run back in the hole and complete this well bore section with the next casing string to be set being 9.625''. On this day I also addressed several issues with the ground of rig support equipment.
 
| Status check inspection found the current drilling depth to be 3,349' in the 12.250''2nd intermediate well bore section with the company using directional drilling tools with a inclination of 4.76 and azimuth of 86.26 degrees. The company has completed the required deviating for this section and is preparing to pull out of the hole with the directional tolls and pick up a 12.250'' hammer bit and run back in the hole and complete this well bore section with the next casing string to be set being 9.625''. On this day I also addressed several issues with the ground of rig support equipment.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 540574392
 
| 540574392
 
| 2014-05-01
 
| 2014-05-01
|
+
|  
| Status check inspection found the stimulation process complete with 32 stages stimulated by Go-Frac well services and the company rigging down and moving over to begin the stimulation on the Gary # 1-H well API # 3411124375-0000.
+
| Status check inspection found the stimulation process complete with 32 stages stimulated by Go-Frac well services and the company rigging down and moving over to begin the stimulation on the Gary # 1-H well API # 3411124375-0000.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -60339106
 +
| 2014-01-27
 +
|
 +
| Status check inspection on the drilling progress found the current drilling depth to be 6,042' in the 12.250'' 2nd intermediate well bore section with a proposed total depth to be drilled of 7,149'. The company is misting 3% KCL.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 817697556
 
| 817697556
 
| 2014-07-30
 
| 2014-07-30
|
+
|  
| Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
+
| Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 09:29, 14 July 2015

Well Details

Well ID: 34-111-24412
Loading map...
County: Monroe
Municipality:
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-11-02
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.81822479
Longitude: -81.30405807

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 1044868.0 90.0 0.0 90.0
2014-4 471937.0 92.0 194.0 92.0
2015-1 353548.0 90.0 54.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-107011558 2014-02-03 Status check inspection on the current drilling progress found the current drilling depth to be 7,996' and the company beginning the horizontal well bore curve section with a current azimuth of 38.18 degrees and inclination of 65.48 degrees. The company is operating on a 21 day blow out preventer test cycle time period.
1383439976 2013-11-02 The said well was spudded on 11/02.2013 with 100' of 26 conductor to be set inside a 32 well bore. Fresh water was hit at 4' while setting the cellar.
1384560714 2013-11-15 Inspection found the current drilling depth to be 1164' using a 17.5 bit with the next casing point to be 2000', Gyro Deviation borehole surveys are being taken every 250' with the last survey at 1033' showing a inclination of .31 degrees.
1384799877 2013-11-18 Status check inspection found the drilling company Falcon rig # 20 has completed the drilling and running of the 13.375 1st intermediate casing string with 2070' of 17.5 hole drilled and 2070' of 13.375 casing set inside of a 17.5 borehole with 73 barrels of cement returns to surface, inspector did not witness the surface cement job due to being in a mandatory training meeting on 11/17/2013.
1386943834 2013-12-12 On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon.
1391997681 2014-02-09 Notification was received by the company man on site by phone that the total drilling depth has been reached at 14,882' and the were conditioning the hole in anticipation of pulling out of the hole with the drill string to begin running the production casing.
-1649848330 2013-11-12 Status check inspection on the current drilling of the surface borehole found the well bore total drilling depth has been reached at 413' using a 26 diameter drill bit. The rig Kelly bushing is 11'.
-1769440351 2013-12-12 Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral.
-1973906257 2014-06-09 Status check inspection on the workover process found Key Completion Service workover rig on the hole with Cudd services providing well head control, the company is currently running in the hole to drill out the completion plugs. The company completion supervisor Don Meador was on site and we discussed the drill out balanced drilling and well head control procedure along with the work over blow out preventer test in which I received the charted tests for.
427339870 2014-01-22 Status check inspection found the current drilling depth to be 3,349' in the 12.2502nd intermediate well bore section with the company using directional drilling tools with a inclination of 4.76 and azimuth of 86.26 degrees. The company has completed the required deviating for this section and is preparing to pull out of the hole with the directional tolls and pick up a 12.250 hammer bit and run back in the hole and complete this well bore section with the next casing string to be set being 9.625. On this day I also addressed several issues with the ground of rig support equipment.
540574392 2014-05-01 Status check inspection found the stimulation process complete with 32 stages stimulated by Go-Frac well services and the company rigging down and moving over to begin the stimulation on the Gary # 1-H well API # 3411124375-0000.
-60339106 2014-01-27 Status check inspection on the drilling progress found the current drilling depth to be 6,042' in the 12.250 2nd intermediate well bore section with a proposed total depth to be drilled of 7,149'. The company is misting 3% KCL.
817697556 2014-07-30 Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.