If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-019-22412 | | Well ID: 34-019-22412 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.62862845, -80.9895351 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Carroll County, Ohio|Carroll]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[R E GAS DEVELOPMENT LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-07-19 | | Spud Date: 2013-07-19 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.62862845 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.9895351 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 36794.0 | ||
+ | | style="text-align:right;" | 11.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 963.0 | ||
+ | | style="text-align:right;" | 11.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 232794.0 | ||
+ | | style="text-align:right;" | 91.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 2991.0 | ||
+ | | style="text-align:right;" | 91.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 152033.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 779.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 119288.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 818.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 113571.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 583.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 103: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| 1380091804 | | 1380091804 | ||
| 2013-09-25 | | 2013-09-25 | ||
− | | | + | | |
| Kyle Tharp and I were on site to witness the cementing of the 9 5/8 inch intermediate casing. Upon arrival to the site we witnessed Sidewinder Rig # 63 was still running the intermediate casing. They had approximately 15 joints of casing left to run into the well bore. They installed 13 centralizers on the casing string; on joints 1,3,7,11,15,19,23,27,31,35,39,43,46. Universal cemented the casing with 615 sacks of Gas Block cement 2% CaCl and 0.3 CR-3. The cement had a density of 15.7 pounds per gallon, a yield of 1.29 cubic feet per sack, and they used 5.54 gallons of mix water per sack. Universal pumped 141 barrels of cement slurry, 148 barrels of freshwater displacement, and they had 20 barrels of cement returns to surface. Universal bumped the plug at 06:04 am with 991 PSI and then conducted the casing test at 1533 PSI for 5 minutes. The casing test was approved at this time. Released the pressure and got 1 barrel of water flowback and the floats held. Our inspection revealed no violations at this time. | | Kyle Tharp and I were on site to witness the cementing of the 9 5/8 inch intermediate casing. Upon arrival to the site we witnessed Sidewinder Rig # 63 was still running the intermediate casing. They had approximately 15 joints of casing left to run into the well bore. They installed 13 centralizers on the casing string; on joints 1,3,7,11,15,19,23,27,31,35,39,43,46. Universal cemented the casing with 615 sacks of Gas Block cement 2% CaCl and 0.3 CR-3. The cement had a density of 15.7 pounds per gallon, a yield of 1.29 cubic feet per sack, and they used 5.54 gallons of mix water per sack. Universal pumped 141 barrels of cement slurry, 148 barrels of freshwater displacement, and they had 20 barrels of cement returns to surface. Universal bumped the plug at 06:04 am with 991 PSI and then conducted the casing test at 1533 PSI for 5 minutes. The casing test was approved at this time. Released the pressure and got 1 barrel of water flowback and the floats held. Our inspection revealed no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-019-22412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.62862845,"lon":-80.9895351,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: R E GAS DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-07-19 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.62862845 | |
Longitude: -80.9895351 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-1 | 36794.0 | 11.0 | 963.0 | 11.0 | ||
2014-2 | 232794.0 | 91.0 | 2991.0 | 91.0 | ||
2014-3 | 152033.0 | 92.0 | 779.0 | 92.0 | ||
2014-4 | 119288.0 | 92.0 | 818.0 | 92.0 | ||
2015-1 | 113571.0 | 90.0 | 583.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1380091804 | 2013-09-25 | Kyle Tharp and I were on site to witness the cementing of the 9 5/8 inch intermediate casing. Upon arrival to the site we witnessed Sidewinder Rig # 63 was still running the intermediate casing. They had approximately 15 joints of casing left to run into the well bore. They installed 13 centralizers on the casing string; on joints 1,3,7,11,15,19,23,27,31,35,39,43,46. Universal cemented the casing with 615 sacks of Gas Block cement 2% CaCl and 0.3 CR-3. The cement had a density of 15.7 pounds per gallon, a yield of 1.29 cubic feet per sack, and they used 5.54 gallons of mix water per sack. Universal pumped 141 barrels of cement slurry, 148 barrels of freshwater displacement, and they had 20 barrels of cement returns to surface. Universal bumped the plug at 06:04 am with 991 PSI and then conducted the casing test at 1533 PSI for 5 minutes. The casing test was approved at this time. Released the pressure and got 1 barrel of water flowback and the floats held. Our inspection revealed no violations at this time. |
For data sources see[2]