If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-121-24488 | | Well ID: 34-121-24488 | ||
| − | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.93596685, -81.31610474 | width=100% | height=100% }} |
|- | |- | ||
| − | | County: | + | | County: [[Noble County, Ohio|Noble]] |
|- | |- | ||
| − | | Municipality: | + | | Municipality: |
|- | |- | ||
| − | | Operator Name: | + | | Operator Name: [[ANTERO RESOURCES CORPORATION]] |
|- | |- | ||
| − | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
| − | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
| − | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
| − | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-04-17 | | Spud Date: 2014-04-17 | ||
|- | |- | ||
| − | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
| − | | | + | | Configuration: Vertical |
|- | |- | ||
| − | | | + | | Well Status: Well Drilled |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
| − | | Latitude: 39. | + | | Latitude: 39.93596685 |
|- | |- | ||
| − | | Longitude: -81. | + | | Longitude: -81.31610474 |
|- | |- | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
| Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
| − | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -2023847995 | | -2023847995 | ||
| 2014-06-23 | | 2014-06-23 | ||
| − | | | + | | |
| − | | I am onsite to witness the cement operations for the surface casing. Dallas Morris Drilling ran 359' of 18.625 | + | | I am onsite to witness the cement operations for the surface casing. Dallas Morris Drilling ran 359' of 18.625 casing. Allied cemented the casing in place with class A cement. I witnessed good returns to surface. |
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|- | |- | ||
| -209412986 | | -209412986 | ||
| 2014-07-01 | | 2014-07-01 | ||
| − | | | + | | |
| − | | I am on site to witness the cementing operations on the second intermediate casing string. Halliburton is preparing to cement 7021' of 9.625 | + | | I am on site to witness the cementing operations on the second intermediate casing string. Halliburton is preparing to cement 7021' of 9.625 casing in place with 940 sacks of Extendacem |
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
| + | |- | ||
| + | |- | ||
| + | | -333773534 | ||
| + | | 2014-09-24 | ||
| + | | | ||
| + | | My inspection today finds the drilling rig Patterson 332 is drilling 8.75 hole at a depth of 7050'. | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | 442190961 | ||
| + | | 2015-05-13 | ||
| + | | | ||
| + | | My inspection today finds the well site meets the preliminary restoration requirements of 1509.072(A). | ||
| + | | | ||
| + | | | ||
| + | | | ||
| + | |- | ||
| + | |- | ||
| + | | -797645058 | ||
| + | | 2014-10-01 | ||
| + | | | ||
| + | | My inspection today finds the drilling rig is drilling 8.75 hole at 18401'. The anticipated total depth is 19256'. | ||
| + | | | ||
| + | | | ||
| + | | | ||
|- | |- | ||
|- | |- | ||
| 900891772 | | 900891772 | ||
| 2014-06-23 | | 2014-06-23 | ||
| − | | | + | | |
| − | | My inspection finds the rig is drilling around a broken 17.5 | + | | My inspection finds the rig is drilling around a broken 17.5 hammer that was lost in the hole. Dallas Morris rig 24 is drilling at a depth of 1323' with directional tools. |
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Ohio Department of Natural Resources RBDMS | ||
| + | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
| + | | date = 2015-06-19 | ||
| + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
| + | | accessdate = 2015-06-20 }}</ref> | ||
| + | == References == | ||
| + | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] | ||
| Well ID: 34-121-24488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.93596685,"lon":-81.31610474,"icon":""}]} |
| County: Noble | |
| Municipality: | |
| Operator Name: ANTERO RESOURCES CORPORATION | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-04-17 | |
| Unconventional: No | |
| Configuration: Vertical | |
| Well Status: Well Drilled | |
| Violations: 0 | |
| Latitude: 39.93596685 | |
| Longitude: -81.31610474 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| -2023847995 | 2014-06-23 | I am onsite to witness the cement operations for the surface casing. Dallas Morris Drilling ran 359' of 18.625 casing. Allied cemented the casing in place with class A cement. I witnessed good returns to surface. | ||||
| -209412986 | 2014-07-01 | I am on site to witness the cementing operations on the second intermediate casing string. Halliburton is preparing to cement 7021' of 9.625 casing in place with 940 sacks of Extendacem | ||||
| -333773534 | 2014-09-24 | My inspection today finds the drilling rig Patterson 332 is drilling 8.75 hole at a depth of 7050'. | ||||
| 442190961 | 2015-05-13 | My inspection today finds the well site meets the preliminary restoration requirements of 1509.072(A). | ||||
| -797645058 | 2014-10-01 | My inspection today finds the drilling rig is drilling 8.75 hole at 18401'. The anticipated total depth is 19256'. | ||||
| 900891772 | 2014-06-23 | My inspection finds the rig is drilling around a broken 17.5 hammer that was lost in the hole. Dallas Morris rig 24 is drilling at a depth of 1323' with directional tools. |
For data sources see[1]