X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-157-21471"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-157-21471
 
| Well ID: 34-157-21471
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3720277425, -81.3009682674 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.37202774, -81.30096827 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Tuscarawas County, Ohio|Tuscarawas]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[COTTRELL AARON]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1971-10-04
 
| Spud Date: 1971-10-04
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Final Restoration
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.3720277425
+
| Latitude: 40.37202774
 
|-
 
|-
| Longitude: -81.3009682674
+
| Longitude: -81.30096827
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1984-0
 +
| style="text-align:right;" | 2482.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1985-0
 +
| style="text-align:right;" | 1317.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1986-0
 +
| style="text-align:right;" | 1367.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1987-0
 +
| style="text-align:right;" | 611.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1988-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 10.0
 +
|
 +
|-
 +
|-
 +
| 1991-0
 +
| style="text-align:right;" | 192.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 66.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -2038663627
 
| 2012-08-29
 
|
 
| I&O well leaking h2s gas . Complaint from Columbus ( Terracina Maxwell ) concerning a well which is leaking h2s. After checking well I found that thus well has been in the I&O file in Columbus for five years. Waiting for Columbus to plug this well.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1194451610
 
| 1194451610
 
| 2007-04-27
 
| 2007-04-27
|
+
|  
 
| Arrived on location and found well idle wellhead has fallen off, I cannot get in touch with complainant, Mr Todd rents this property and I told the renter to have mr todd get in touch with me.
 
| Arrived on location and found well idle wellhead has fallen off, I cannot get in touch with complainant, Mr Todd rents this property and I told the renter to have mr todd get in touch with me.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1200320344
 +
| 2014-04-03
 +
|
 +
| A follow up Inspection was conducted on 04-03 for contract compliance.
 +
    Moore
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1296110128
 +
| 2014-03-19
 +
|
 +
| A follow up Inspection was conducted on 03/19/2014 for contract compliance.
 +
I walked the perimeter of the location with my Sperian gas meter to check for H2S and natural gas - none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1320009765
 +
| 2014-04-18
 +
|
 +
| A follow up Inspection was conducted on 04/18/2014 for contract compliance.
 +
Checked well for leakage but was unable to check inside well bore because of the cementing head on the 7 diameter casing.
 +
Checked the annulus of 8.625 and 7 diameter casings with my gas meter - no Ch4, LEL, CO or H2S detected.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1332550364
 +
| 2014-03-25
 +
|
 +
| A follow up Inspection was conducted on 03/25/2014 for contract compliance.
 +
I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1345926622
 
| 1345926622
 
| 2014-03-19
 
| 2014-03-19
|
+
|  
 
| Accompanies Inspector Norburt Lowder while witnessing plugging operations on this well.  We witnessed the bottom hole plug being pumped.  After it was pumped, the tubing got hung in the hole and the wire line company came out and shot the tubing.  I also participated with Inspectors Justin Smith, LJ Parkins and Josh Garland in taking an H2S awareness class put on by O'Brian Safety Services.  They were also there monitoring the site for H2S gas coming out of the well bore.
 
| Accompanies Inspector Norburt Lowder while witnessing plugging operations on this well.  We witnessed the bottom hole plug being pumped.  After it was pumped, the tubing got hung in the hole and the wire line company came out and shot the tubing.  I also participated with Inspectors Justin Smith, LJ Parkins and Josh Garland in taking an H2S awareness class put on by O'Brian Safety Services.  They were also there monitoring the site for H2S gas coming out of the well bore.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1395259000
 
| 1395259000
 
| 2014-03-19
 
| 2014-03-19
|
+
|  
| Accompanied Inspectors Josh Garland, Andy Thomas, and Justin Smith to this idle/orphan well site to attend an H2S safety training meeting with O'Brien Safety Services. After the training, we witnessed the attempted removal of the 2.5" tubing, which had become hung up inside the 4.5" casing. The tubing had been shot by Appalachian Well Surveys in an attempt to free it, but the attempt was not successful.
+
| Accompanied Inspectors Josh Garland, Andy Thomas, and Justin Smith to this idle/orphan well site to attend an H2S safety training meeting with O'Brien Safety Services. After the training, we witnessed the attempted removal of the 2.5 tubing, which had become hung up inside the 4.5 casing. The tubing had been shot by Appalachian Well Surveys in an attempt to free it, but the attempt was not successful.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1395263914
 
| 1395263914
 
| 2014-03-19
 
| 2014-03-19
|
+
|  
 
| Witnessed portion of plugging operations. Tubing was hung in hole after bottom hole plug was set. A casing cutter was used in an attempt to free tubing at 4560 feet. Service rig still unable to pull tubing when I left.
 
| Witnessed portion of plugging operations. Tubing was hung in hole after bottom hole plug was set. A casing cutter was used in an attempt to free tubing at 4560 feet. Service rig still unable to pull tubing when I left.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1416102631
 +
| 2014-03-13
 +
|
 +
| Inspection on 03/13/2014 was conducted for contract compliance.
 +
Gene Chini, Orphan Well Manager, advised me that he had a phone conference with Mr. Rennicker (land owner) as to the access the contractors will be using.  He suggested using the driveway for address 7318, which is located directly off of State Route 800, between Bison Water and Mr. Rennicker
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1416147055
 +
| 2014-03-17
 +
|
 +
| This follow up Inspection was conducted on 03/17/2014 for contract compliance.
 +
 
 +
I walked the location perimeter with my Sperian gas meter to check levels of H2S and natural gas - none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 141843849
 +
| 2014-04-07
 +
|
 +
|
 +
This follow up inspection was conducted on 04-07 for contract compliance.
 +
Moore
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1491380923
 
| 1491380923
 
| 2014-03-18
 
| 2014-03-18
|
+
|  
 
| I attended H2S training with O'Brien Safety Service. The well is being plugged by Moore well service. Inspector Norbert Lowder was the lead inspector.
 
| I attended H2S training with O'Brien Safety Service. The well is being plugged by Moore well service. Inspector Norbert Lowder was the lead inspector.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1496886673
 +
| 2014-03-20
 +
|
 +
| This follow up Inspection was conducted on 03/20/2014 for contract compliance.
 +
 
 +
I walked area with my Sperian gas meter to check for H2S and natural gas - none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1733255341
 +
| 2014-03-26
 +
|
 +
| This follow up Inspection was conducted on 03/26/2014 for contract compliance.
 +
I walked area with my Sperian gas meter to check for H2S and natural gas none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1937857332
 +
| 2014-04-17
 +
|
 +
| A follow up Inspection was conducted on 04/17/2014 for contract compliance.
 +
 
 +
The Contractor installed new 7 casing, with the collars removed and each joint welded together, to a depth of approximately 102
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2002895509
 +
| 2014-03-18
 +
|
 +
| A follow up Inspection was conducted on 03/18/2014 for contract compliance.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2038663627
 +
| 2012-08-29
 +
|
 +
| I&O well leaking h2s gas . Complaint from Columbus ( Terracina Maxwell ) concerning a well which is leaking h2s. After checking well I found that thus well has been in the I&O file in Columbus for five years. Waiting for Columbus to plug this well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2088193093
 
| 2088193093
 
| 2014-03-19
 
| 2014-03-19
|
+
|  
 
| I went out to this plug job for H2S training. The well was an idle orphan well that is being plugged by the state. O'Brien's Safety Services was on site for the H2S. They were giving the training while the well was being plugged.
 
| I went out to this plug job for H2S training. The well was an idle orphan well that is being plugged by the state. O'Brien's Safety Services was on site for the H2S. They were giving the training while the well was being plugged.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 2109572886
 +
| 2014-04-08
 +
|
 +
| This follow up inspection was conducted on 04-08 for contract compliance.
 +
 
 +
The Contactor ran the 7.875 diameter mill claw bit on 2.375 diameter tubing and drilled to approximately 120
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 34718564
 
| 34718564
 
| 2014-05-27
 
| 2014-05-27
|
+
|  
 
| A follow-up inspection was conducted on 03/26/2014 for contract compliance.
 
| A follow-up inspection was conducted on 03/26/2014 for contract compliance.
  
 
The gravel driveway used to access the site has been finish graded.  The access from the gravel drive to the well and the wellsite has also been finish graded and seeded and vegetative growth established. The visible piping, downgradient of the well has been removed.
 
The gravel driveway used to access the site has been finish graded.  The access from the gravel drive to the well and the wellsite has also been finish graded and seeded and vegetative growth established. The visible piping, downgradient of the well has been removed.
Final Restoration completed and approved.
+
  Final Restoration completed and approved.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -366557058
 +
| 2014-03-21
 +
|
 +
| This follow up Inspection was conducted on 03/21/2014 for contract compliance.
 +
I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 38266933
 +
| 2014-03-14
 +
|
 +
| This follow up Inspection was conducted on 03/14/2014  for contract compliance.
 +
I obtained a signed Right-of-Entry (ROE) from the landowner (Michael and Sarah Cady) at address 7318. It will be their driveway which the contactor will be using to access the well.
 +
I walked the perimeter of the location with my Sperian gas meter to check levels of H2S and natural gas - none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 446515875
 +
| 2014-03-31
 +
|
 +
|
 +
A follow up  Inspection was conducted on 03/31/2014 for contract compliance.
 +
No work done on well, just site cleanup and fluid removal from the half tank, to get ready for the drillout of the surface plug.
 +
Checked well and found gas bubbling through the fluid in the well bore.  Gas readings are as follows: CH4 - .01 PPM, 1% LEL, 4% CO and H2S - 0 PPM.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 68119658
 +
| 2014-03-27
 +
|
 +
| No site inspection was conducted on 03-27 due to a meeting held in the New Philadelphia office with Gene Chini (Orphan Program Manager), Keith and Jeff Moore and I to discuss what remedial action that will be taken to correct the top cement plug, which is leaking. The decision was made to drill out the top plug to a depth of approximately 100' and re-plug. Moore will submit a cost estimate for this remedial action.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 712143399
 +
| 2014-03-24
 +
|
 +
| This follow up Inspection was conducted on 03/24/2014 for contract compliance.
 +
 
 +
I walked area with my Sperian gas meter to check for H2S and natural gas - none detected.
 +
O
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 959349471
 +
| 2014-04-09
 +
|
 +
|
 +
This follow up inspection was conducted on 04-09 for contract compliance.
 +
The rig bailed the fluid in the hole down to a depth of 120
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -9698174
 +
| 2014-04-21
 +
|
 +
| A follow up Inspection was conducted on 04/21/2014 for contract compliance.
 +
The Contractor was on site and removed the cementing head, tagged the top of the cement at a depth of 60
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -981242030
 +
| 2014-03-17
 +
|
 +
| A follow up Inspection was conducted on 03/17/2014 for contract compliance.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 00:41, 16 July 2015

Well Details

Well ID: 34-157-21471
Loading map...
County: Tuscarawas
Municipality:
Operator Name: COTTRELL AARON
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1971-10-04
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 40.37202774
Longitude: -81.30096827

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1984-0 2482.0 0.0
1985-0 1317.0 0.0
1986-0 1367.0 0.0
1987-0 611.0 0.0
1988-0 0.0 10.0
1991-0 192.0 66.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1194451610 2007-04-27 Arrived on location and found well idle wellhead has fallen off, I cannot get in touch with complainant, Mr Todd rents this property and I told the renter to have mr todd get in touch with me.
-1200320344 2014-04-03 A follow up Inspection was conducted on 04-03 for contract compliance.
   Moore
-1296110128 2014-03-19 A follow up Inspection was conducted on 03/19/2014 for contract compliance.
I walked the perimeter of the location with my Sperian gas meter to check for H2S and natural gas - none detected.
O
1320009765 2014-04-18 A follow up Inspection was conducted on 04/18/2014 for contract compliance.

Checked well for leakage but was unable to check inside well bore because of the cementing head on the 7 diameter casing. Checked the annulus of 8.625 and 7 diameter casings with my gas meter - no Ch4, LEL, CO or H2S detected.

1332550364 2014-03-25 A follow up Inspection was conducted on 03/25/2014 for contract compliance.

I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O

1345926622 2014-03-19 Accompanies Inspector Norburt Lowder while witnessing plugging operations on this well. We witnessed the bottom hole plug being pumped. After it was pumped, the tubing got hung in the hole and the wire line company came out and shot the tubing. I also participated with Inspectors Justin Smith, LJ Parkins and Josh Garland in taking an H2S awareness class put on by O'Brian Safety Services. They were also there monitoring the site for H2S gas coming out of the well bore.
1395259000 2014-03-19 Accompanied Inspectors Josh Garland, Andy Thomas, and Justin Smith to this idle/orphan well site to attend an H2S safety training meeting with O'Brien Safety Services. After the training, we witnessed the attempted removal of the 2.5 tubing, which had become hung up inside the 4.5 casing. The tubing had been shot by Appalachian Well Surveys in an attempt to free it, but the attempt was not successful.
1395263914 2014-03-19 Witnessed portion of plugging operations. Tubing was hung in hole after bottom hole plug was set. A casing cutter was used in an attempt to free tubing at 4560 feet. Service rig still unable to pull tubing when I left.
1416102631 2014-03-13 Inspection on 03/13/2014 was conducted for contract compliance.

Gene Chini, Orphan Well Manager, advised me that he had a phone conference with Mr. Rennicker (land owner) as to the access the contractors will be using. He suggested using the driveway for address 7318, which is located directly off of State Route 800, between Bison Water and Mr. Rennicker

1416147055 2014-03-17 This follow up Inspection was conducted on 03/17/2014 for contract compliance.

I walked the location perimeter with my Sperian gas meter to check levels of H2S and natural gas - none detected.

O
141843849 2014-04-07

This follow up inspection was conducted on 04-07 for contract compliance. Moore

1491380923 2014-03-18 I attended H2S training with O'Brien Safety Service. The well is being plugged by Moore well service. Inspector Norbert Lowder was the lead inspector.
1496886673 2014-03-20 This follow up Inspection was conducted on 03/20/2014 for contract compliance.

I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O

1733255341 2014-03-26 This follow up Inspection was conducted on 03/26/2014 for contract compliance.

I walked area with my Sperian gas meter to check for H2S and natural gas none detected. O

1937857332 2014-04-17 A follow up Inspection was conducted on 04/17/2014 for contract compliance.

The Contractor installed new 7 casing, with the collars removed and each joint welded together, to a depth of approximately 102

-2002895509 2014-03-18 A follow up Inspection was conducted on 03/18/2014 for contract compliance.
-2038663627 2012-08-29 I&O well leaking h2s gas . Complaint from Columbus ( Terracina Maxwell ) concerning a well which is leaking h2s. After checking well I found that thus well has been in the I&O file in Columbus for five years. Waiting for Columbus to plug this well.
2088193093 2014-03-19 I went out to this plug job for H2S training. The well was an idle orphan well that is being plugged by the state. O'Brien's Safety Services was on site for the H2S. They were giving the training while the well was being plugged.
2109572886 2014-04-08 This follow up inspection was conducted on 04-08 for contract compliance.

The Contactor ran the 7.875 diameter mill claw bit on 2.375 diameter tubing and drilled to approximately 120

34718564 2014-05-27 A follow-up inspection was conducted on 03/26/2014 for contract compliance.

The gravel driveway used to access the site has been finish graded. The access from the gravel drive to the well and the wellsite has also been finish graded and seeded and vegetative growth established. The visible piping, downgradient of the well has been removed.

 Final Restoration completed and approved.
-366557058 2014-03-21 This follow up Inspection was conducted on 03/21/2014 for contract compliance.

I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O

38266933 2014-03-14 This follow up Inspection was conducted on 03/14/2014 for contract compliance.
I obtained a signed Right-of-Entry (ROE) from the landowner (Michael and Sarah Cady) at address 7318. It will be their driveway which the contactor will be using to access the well.
I walked the perimeter of the location with my Sperian gas meter to check levels of H2S and natural gas - none detected.
O
446515875 2014-03-31

A follow up Inspection was conducted on 03/31/2014 for contract compliance. No work done on well, just site cleanup and fluid removal from the half tank, to get ready for the drillout of the surface plug. Checked well and found gas bubbling through the fluid in the well bore. Gas readings are as follows: CH4 - .01 PPM, 1% LEL, 4% CO and H2S - 0 PPM.

68119658 2014-03-27 No site inspection was conducted on 03-27 due to a meeting held in the New Philadelphia office with Gene Chini (Orphan Program Manager), Keith and Jeff Moore and I to discuss what remedial action that will be taken to correct the top cement plug, which is leaking. The decision was made to drill out the top plug to a depth of approximately 100' and re-plug. Moore will submit a cost estimate for this remedial action.
712143399 2014-03-24 This follow up Inspection was conducted on 03/24/2014 for contract compliance.

I walked area with my Sperian gas meter to check for H2S and natural gas - none detected. O

959349471 2014-04-09

This follow up inspection was conducted on 04-09 for contract compliance. The rig bailed the fluid in the hole down to a depth of 120

-9698174 2014-04-21 A follow up Inspection was conducted on 04/21/2014 for contract compliance.

The Contractor was on site and removed the cementing head, tagged the top of the cement at a depth of 60

-981242030 2014-03-17 A follow up Inspection was conducted on 03/17/2014 for contract compliance.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.