Difference between revisions of "34-139-20763"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-139-20763
 
| Well ID: 34-139-20763
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.57981108, -82.4517442184 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.57981108, -82.45174422 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Richland County, Ohio|Richland]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BI JOE DEVELOPMENT INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-09-05
 
| Spud Date: 2013-09-05
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
Line 31: Line 31:
 
| Latitude: 40.57981108
 
| Latitude: 40.57981108
 
|-
 
|-
| Longitude: -82.4517442184
+
| Longitude: -82.45174422
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 73.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 31.0
 +
|
 +
|
 +
| style="text-align:right;" | 152.0
 +
| style="text-align:right;" | 31.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1150149623
 
| -1150149623
 
| 2013-09-09
 
| 2013-09-09
|
+
|  
 
| Drilling on fluid at 2177 feet.  Drillers estimate drilling into the Clinton sand tomorrow.  Columbia Gas representative arrived on the rig during inspection.
 
| Drilling on fluid at 2177 feet.  Drillers estimate drilling into the Clinton sand tomorrow.  Columbia Gas representative arrived on the rig during inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1268679971
 +
| 2013-09-11
 +
|
 +
| The driller requested ODNR to witness the intermediate casing cement.  See the casing report for details.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1379442431
 +
| 2013-09-16
 +
|
 +
| The rig reached total depth of 4550 feet.  The drillers were mixing mud to condition the hole.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1379509517
 +
| 2013-09-18
 +
|
 +
| The operator is breaking down the site and moving equipment to the next location.  47 joints of the 7 inch casing were recovered above the cement.  Range 3 pipe was used.  Top of cemented 7 inch 2105ft.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1468861652
 +
| 2013-09-16
 +
|
 +
| Requested by the operator to witness cementing the production casing.  See the cement ticket.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1875191512
 
| -1875191512
 
| 2013-09-10
 
| 2013-09-10
|
+
|  
 
| Drilling is at 2570 on fluid.  There was no show of gas from the Clinton Sand.
 
| Drilling is at 2570 on fluid.  There was no show of gas from the Clinton Sand.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1989475498
 
| -1989475498
 
| 2013-09-25
 
| 2013-09-25
|
+
|  
 
| R&B Oilfield Service was on site to solidify and close pits.  Met Joe Cross and Roger Baker on site.
 
| R&B Oilfield Service was on site to solidify and close pits.  Met Joe Cross and Roger Baker on site.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 2070472533
 +
| 2013-10-18
 +
|
 +
| R&B Enterprises was on site grading the location.  The well is being pumped to a portable tank.  Preliminary restoration will be approved when grading is completed.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 226427798
 +
| 2013-09-06
 +
|
 +
| The driller requested ODNR to witness the surface casing cement job.  The surface hole was drilled on fluid.  No conductor was set.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -61795973
 
| -61795973
 
| 2013-09-30
 
| 2013-09-30
|
+
|  
 
| The pits have been closed.  The well is equipped with tubing, rods and a well head.  The site needs to be graded and vegetated to complete preliminary restoration.
 
| The pits have been closed.  The well is equipped with tubing, rods and a well head.  The site needs to be graded and vegetated to complete preliminary restoration.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -843633876
 
| -843633876
 
| 2014-07-02
 
| 2014-07-02
|
+
|  
 
| The operator has posted ID at the tank battery.  The well is in production.  The site is vegetated and stable.  The preliminary restoration is approved.
 
| The operator has posted ID at the tank battery.  The well is in production.  The site is vegetated and stable.  The preliminary restoration is approved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -891479498
 
| -891479498
 
| 2013-08-26
 
| 2013-08-26
|
+
|  
 
| The driller contacted ODNR via phone over the weekend and advised they were cutting location in preparation for bringing the rig in.  The site has been cleared and grubbed but the pits have not been dug yet.  No personnel on site during inspection.  The well location is marked by a stake.
 
| The driller contacted ODNR via phone over the weekend and advised they were cutting location in preparation for bringing the rig in.  The site has been cleared and grubbed but the pits have not been dug yet.  No personnel on site during inspection.  The well location is marked by a stake.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -916039197
 
| -916039197
 
| 2014-05-13
 
| 2014-05-13
|
+
|  
 
| The well is equipped with a pump jack and is in production.  The well was pumping during inspection.  An ID needs to be posted at the tanks.  The pits have been closed, an access road is established for the pumper, and the site is vegetated.  Vegetation is sparse but stable.  The operator was contacted regarding an ID and stated he would get one posted ASAP.  Preliminary restoration is approved.
 
| The well is equipped with a pump jack and is in production.  The well was pumping during inspection.  An ID needs to be posted at the tanks.  The pits have been closed, an access road is established for the pumper, and the site is vegetated.  Vegetation is sparse but stable.  The operator was contacted regarding an ID and stated he would get one posted ASAP.  Preliminary restoration is approved.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1268679971
 
| 2013-09-11
 
|
 
| The driller requested ODNR to witness the intermediate casing cement.  See the casing report for details.
 
|
 
|
 
|
 
|-
 
|-
 
| 1379442431
 
| 2013-09-16
 
|
 
| The rig reached total depth of 4550 feet.  The drillers were mixing mud to condition the hole.
 
|
 
|
 
|
 
|-
 
|-
 
| 1379509517
 
| 2013-09-18
 
|
 
| The operator is breaking down the site and moving equipment to the next location.  47 joints of the 7 inch casing were recovered above the cement.  Range 3 pipe was used.  Top of cemented 7 inch 2105ft.
 
|
 
|
 
|
 
|-
 
|-
 
| 1468861652
 
| 2013-09-16
 
|
 
| Requested by the operator to witness cementing the production casing.  See the cement ticket.
 
|
 
|
 
|
 
|-
 
|-
 
| 2070472533
 
| 2013-10-18
 
|
 
| R&B Enterprises was on site grading the location.  The well is being pumped to a portable tank.  Preliminary restoration will be approved when grading is completed.
 
|
 
|
 
|
 
|-
 
|-
 
| 226427798
 
| 2013-09-06
 
|
 
| The driller requested ODNR to witness the surface casing cement job.  The surface hole was drilled on fluid.  No conductor was set.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 02:14, 16 July 2015

Well Details

Well ID: 34-139-20763
Loading map...
County: Richland
Municipality:
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-05
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.57981108
Longitude: -82.45174422

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 73.0
2014-0 0.0 31.0 152.0 31.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1150149623 2013-09-09 Drilling on fluid at 2177 feet. Drillers estimate drilling into the Clinton sand tomorrow. Columbia Gas representative arrived on the rig during inspection.
1268679971 2013-09-11 The driller requested ODNR to witness the intermediate casing cement. See the casing report for details.
1379442431 2013-09-16 The rig reached total depth of 4550 feet. The drillers were mixing mud to condition the hole.
1379509517 2013-09-18 The operator is breaking down the site and moving equipment to the next location. 47 joints of the 7 inch casing were recovered above the cement. Range 3 pipe was used. Top of cemented 7 inch 2105ft.
1468861652 2013-09-16 Requested by the operator to witness cementing the production casing. See the cement ticket.
-1875191512 2013-09-10 Drilling is at 2570 on fluid. There was no show of gas from the Clinton Sand.
-1989475498 2013-09-25 R&B Oilfield Service was on site to solidify and close pits. Met Joe Cross and Roger Baker on site.
2070472533 2013-10-18 R&B Enterprises was on site grading the location. The well is being pumped to a portable tank. Preliminary restoration will be approved when grading is completed.
226427798 2013-09-06 The driller requested ODNR to witness the surface casing cement job. The surface hole was drilled on fluid. No conductor was set.
-61795973 2013-09-30 The pits have been closed. The well is equipped with tubing, rods and a well head. The site needs to be graded and vegetated to complete preliminary restoration.
-843633876 2014-07-02 The operator has posted ID at the tank battery. The well is in production. The site is vegetated and stable. The preliminary restoration is approved.
-891479498 2013-08-26 The driller contacted ODNR via phone over the weekend and advised they were cutting location in preparation for bringing the rig in. The site has been cleared and grubbed but the pits have not been dug yet. No personnel on site during inspection. The well location is marked by a stake.
-916039197 2014-05-13 The well is equipped with a pump jack and is in production. The well was pumping during inspection. An ID needs to be posted at the tanks. The pits have been closed, an access road is established for the pumper, and the site is vegetated. Vegetation is sparse but stable. The operator was contacted regarding an ID and stated he would get one posted ASAP. Preliminary restoration is approved.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.