| Well ID: 34-031-27178
 
| Well ID: 34-031-27178
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.3025373195, -81.8461900167 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.30253732, -81.84619002 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Coshocton County, Ohio|Coshocton]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BUCKEYE BRINE LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-10-12
 
| Spud Date: 2013-10-12
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.3025373195
+
| Latitude: 40.30253732
 
|-
 
|-
| Longitude: -81.8461900167
+
| Longitude: -81.84619002
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1652717491
 
| 2013-11-04
 
|
 
| Inspection revealed that Wildcat Drilling presently drilling on fluid@6450' should be at total depth later this week.
 
|
 
|
 
|
 
|-
 
|-
 
| -1740583739
 
| 2014-06-02
 
|
 
| Inspection revealed that restoration work at site has been completed and vegetation has been established.
 
|
 
|
 
|
 
|-
 
|-
 
| -2012450470
 
| 2014-06-25
 
|
 
| Injection pump not in operation today.
 
|
 
|
 
|
 
|-
 
|-
 
| -2032990822
 
| 2013-09-23
 
|
 
| Inspection revealed that lease road to new well site has been made and they are currently working on clearing  area to build drill site for SWIW well.
 
|
 
|
 
|
 
|-
 
|-
 
| -285455196
 
| 2013-11-07
 
|
 
| Inspection revealed that drilling contractor was rigging down and they reached a total depth of 7016' and planned total depth was 7320' they encountered suspected parted casing@5610' they will regroup and plans are to run liner string into well @6200-5200' and cement it in place.
 
|
 
|
 
|
 
|-
 
|-
 
| -36642610
 
| 2014-07-11
 
|
 
| Inspection revealed that injection pump was just started prior too our inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -440930857
 
| 2013-11-25
 
|
 
| Baker Wire line Services were on site logging well.
 
|
 
|
 
|
 
|-
 
|-
 
| -50575651
 
| 2014-02-11
 
|
 
| Inspection revealed that service rig was drilling on cement retainer and once it is drilled they will start drilling on bridge plug and once that is achieved they will start drilling on cement below the liner string.
 
|
 
|
 
|
 
|-
 
|-
 
| -539407053
 
| 2014-05-22
 
|
 
| Injection pump was in operation during my inspection.
 
Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.
 
|
 
|
 
|
 
|-
 
|-
 
| -560877534
 
| 2014-04-29
 
|
 
| Inspection revealed that well is not being used at this time and it was noted that owner has placed a new set of steps at wellhead so inspector has better access to testing ports on wellhead.
 
|
 
|
 
|
 
|-
 
|-
 
| -563770336
 
| 2014-05-07
 
|
 
| On site along with Producers Services to perform 2000 gallon acid treatment on said well.
 
Note:This well is not used much it is used for back up well.
 
|
 
|
 
|
 
|-
 
|-
 
| -692456961
 
| 2014-08-26
 
|
 
| Producers Well Service on site to perform 2000 gallon acid treatment job on said well.
 
Pressure charts forwarded to central office.
 
|
 
|
 
|
 
|-
 
|-
 
| -806803884
 
| 2014-02-19
 
|
 
| Inspection revealed that service rig was pulling tubing from well it was plugged with sand.
 
|
 
|
 
|
 
|-
 
|-
 
| -814964348
 
| 2014-08-15
 
|
 
| I am accompanied by Inspector David Ball and Regional Supervisor Rocky King.  The well is not in use.
 
|
 
|
 
|
 
|-
 
|-
 
| -82236385
 
| 2014-01-17
 
|
 
| On site with company rep Rex Baker to discuss upcoming casing job and cementing of said casing.
 
|
 
|
 
|
 
|-
 
|-
 
| -911100335
 
| 2014-04-14
 
|
 
| Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.
 
Note: Well not being used today they are currently using the number one well.
 
|
 
|
 
|
 
|-
 
|-
 
| -939580406
 
| 2014-02-24
 
|
 
| Great White coil tubing unit rigging  on well to wash sand from bottom of hole once sand fill up is removed they will be ready to run tubing and packer into well.
 
|
 
|
 
|
 
|-
 
|-
 
| -967443891
 
| 2014-02-07
 
|
 
| On site along with Andrew Adgate to witness bond logging of well be Archer Wire line and log indicated that cement top was noted at 5203' just below casing hanger which was set at 5193'.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1006260148
 
| 1006260148
 
| 2014-03-14
 
| 2014-03-14
|
+
|  
 
| On site to pressure test flow line going to wellhead. They filled flow line with fresh water and we pressure tested it at 1525 psi and monitored  it for 15 minutes with no decline in pressure.
 
| On site to pressure test flow line going to wellhead. They filled flow line with fresh water and we pressure tested it at 1525 psi and monitored  it for 15 minutes with no decline in pressure.
Note:Flow line is 1100' long and it is 4.5" and 11.6# per foot and is encased within 8.625" which is 24# casing and we also pressure tested annulus of flow line at 1525 psi also.
+
Note:Flow line is 1100' long and it is 4.5 and 11.6# per foot and is encased within 8.625 which is 24# casing and we also pressure tested annulus of flow line at 1525 psi also.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1057849257
 
| 1057849257
 
| 2014-03-27
 
| 2014-03-27
|
+
|  
 
| Inspection revealed that injection pumps were not in operation during my inspection.
 
| Inspection revealed that injection pumps were not in operation during my inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1072093696
 +
| 2014-09-11
 +
|
 +
| Inspection revealed that injection pump to this well was not in operation during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1122604924
 
| 1122604924
 
| 2014-03-06
 
| 2014-03-06
|
+
|  
 
+
| On site to witness operator place positive pressure on annulus of injection string, they had to replace valve on wellhead that
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1145634747
 +
| 2015-03-05
 +
|
 +
| Inspection revealed that injection pump was not in operation during my inspection and it was noted that nine Oilfield Solutions vacuum trucks were waiting to unload at the facility during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1160407714
 
| 1160407714
 
| 2014-02-27
 
| 2014-02-27
|
+
|  
 
| On site to witness tubing and packer run into well and flush annulus with fresh water and inhibitor and pressure test annulus.
 
| On site to witness tubing and packer run into well and flush annulus with fresh water and inhibitor and pressure test annulus.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1200790268
 
| 1200790268
 
| 2014-08-11
 
| 2014-08-11
|
+
|  
 
| Inspection revealed that injection pump too this well was not in service during my inspection.
 
| Inspection revealed that injection pump too this well was not in service during my inspection.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1203275818
 +
| 2014-10-17
 +
|
 +
| Inspection revealed that injection pump too this well was in operation during my inspection and it was noted that all of the storage tanks at the facility are in the process of being repainted.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -126439358
 +
| 2014-11-06
 +
|
 +
| Inspection revealed that injection pump too this well was in operation today and as noted on previous report all storage tanks have been repainted.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1351050865
 +
| 2015-03-12
 +
|
 +
| Inspection on this day revealed that injection pump was in operation and it was noted that several vacuum trucks/tankers were waiting to unload at the facility.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 135389985
 
| 135389985
 
| 2013-12-12
 
| 2013-12-12
|
+
|  
 
| Waiting on service rig to arrive on site to complete remedial work on casing and then they will bond log casing again and if it is confirmed that they have good bond they will run new packer and tubing into well and test.
 
| Waiting on service rig to arrive on site to complete remedial work on casing and then they will bond log casing again and if it is confirmed that they have good bond they will run new packer and tubing into well and test.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1381956781
 
| 1381956781
 
| 2013-10-16
 
| 2013-10-16
|
+
|  
 
| On site to witness testing of BOP rig personnel closed BOP and we pressured up to 500# and monitored pressure for 15 minutes with no decline in pressure.
 
| On site to witness testing of BOP rig personnel closed BOP and we pressured up to 500# and monitored pressure for 15 minutes with no decline in pressure.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382042070
 
| 1382042070
 
| 2013-10-17
 
| 2013-10-17
|
+
|  
 
| Drilling on fluid@1958' converted to fluid type drilling@1768'due to fact that they were not able to keep up with cleaning cuttings that were coming from well.
 
| Drilling on fluid@1958' converted to fluid type drilling@1768'due to fact that they were not able to keep up with cleaning cuttings that were coming from well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1383063780
 
| 1383063780
 
| 2013-10-25
 
| 2013-10-25
|
+
|  
| Inspection revealed that drilling rig was drilling@4100' and while on site I inspected 8.625" casing that is to be run in well at a later date.
+
| Inspection revealed that drilling rig was drilling@4100' and while on site I inspected 8.625 casing that is to be run in well at a later date.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1383150287
 
| 1383150287
 
| 2013-10-30
 
| 2013-10-30
|
+
|  
| On site to witness running and cementing of 5905"of 8.625"casing Universal Cemented with  1163 sacks,plug did not land and decision was made to run bond log in well and confirm cement top and check for pipe separation.
+
| On site to witness running and cementing of 5905of 8.625casing Universal Cemented with  1163 sacks,plug did not land and decision was made to run bond log in well and confirm cement top and check for pipe separation.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1383150553
 
| 1383150553
 
| 2013-10-30
 
| 2013-10-30
|
+
|  
| On the day of my inspection I witnessed the first stage of a two stage cement job. Wildcat Drilling had drilled an 11.625" hole on fluid to 5933'. They ran 8.625" casing equipped with a DV tool. Universal broke circulation and pumped 600 sacks of cement. Good circulation was maintained throughout the job.
+
| On the day of my inspection I witnessed the first stage of a two stage cement job. Wildcat Drilling had drilled an 11.625 hole on fluid to 5933'. They ran 8.625 casing equipped with a DV tool. Universal broke circulation and pumped 600 sacks of cement. Good circulation was maintained throughout the job.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1383324727
 
| 1383324727
 
| 2013-11-01
 
| 2013-11-01
|
+
|  
 
| On site to attempt to pressure casing, arrived on site and rig crew loaded casing with 15 bbl fresh water and then DB Energy Management used there solvent truck to apply pressure and he pumped additional 7 bbl of water with a pressure reading of 180 psi maximum so at that point decision was made to trip in hole and drill out stage tool and run bit to bottom and then set bridge plug in bottom of casing and load hole again and then pressure test casing.
 
| On site to attempt to pressure casing, arrived on site and rig crew loaded casing with 15 bbl fresh water and then DB Energy Management used there solvent truck to apply pressure and he pumped additional 7 bbl of water with a pressure reading of 180 psi maximum so at that point decision was made to trip in hole and drill out stage tool and run bit to bottom and then set bridge plug in bottom of casing and load hole again and then pressure test casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1383525462
 
| 1383525462
 
| 2013-11-01
 
| 2013-11-01
|
+
|  
| On site to witness Appalachian Well Surveys run 8" retrievable bridge plug inside of casing and set it at 5875' and then rig crew loaded casing and we pressured tested casing@1500# and pressure dropped to 1485# during the 15 minute test which was a 1% decline.
+
| On site to witness Appalachian Well Surveys run 8 retrievable bridge plug inside of casing and set it at 5875' and then rig crew loaded casing and we pressured tested casing@1500# and pressure dropped to 1485# during the 15 minute test which was a 1% decline.
 
Note: Appalachian had to make two runs with collar locator log due to faulty equipment.
 
Note: Appalachian had to make two runs with collar locator log due to faulty equipment.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1385066962
 
| 1385066962
 
| 2013-11-21
 
| 2013-11-21
|
+
|  
 
| Inspection revealed that stone haulers are placing stone across entire location preparing site for down hole E-Logging of well on 11/24/13.
 
| Inspection revealed that stone haulers are placing stone across entire location preparing site for down hole E-Logging of well on 11/24/13.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1387406683
 
| 1387406683
 
| 2013-12-18
 
| 2013-12-18
|
+
|  
 
| On site to witness tracer testing of potential injection zones in well bore, Coastal Wireline Company and Producers Services performed testing and it was determined that injection zone was identified@6550'-6640' according to tracer logs.
 
| On site to witness tracer testing of potential injection zones in well bore, Coastal Wireline Company and Producers Services performed testing and it was determined that injection zone was identified@6550'-6640' according to tracer logs.
 
Producers pumped 7.5 bpm@800 psi and once pump truck shut down it took six minutes for pressure to drop to 0 pressure.
 
Producers pumped 7.5 bpm@800 psi and once pump truck shut down it took six minutes for pressure to drop to 0 pressure.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1390338649
 
| 1390338649
 
| 2014-01-21
 
| 2014-01-21
|
+
|  
 
| On site to witness Bakerwell Service company try and release casing hanger from tubing they were unable to do so this morning due to well flowing after circulating bottoms up with 8.7#brine so they had to call for heavy brine to load hole with and once circulated again flow stopped and we released casing hanger and they started out of hole with working string and the will start cementing packer into well in the morning.
 
| On site to witness Bakerwell Service company try and release casing hanger from tubing they were unable to do so this morning due to well flowing after circulating bottoms up with 8.7#brine so they had to call for heavy brine to load hole with and once circulated again flow stopped and we released casing hanger and they started out of hole with working string and the will start cementing packer into well in the morning.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1390516128
 
| 1390516128
 
| 2014-01-22
 
| 2014-01-22
|
+
|  
| On site to witness cementing of liner string in SWIW well they ran 1010' of 5.5" and cemented it in place with 200 sacks of Type 1 cement and once cemented they released cementing packer and reversed circulation with 200 bbl of brine water and they will remove remaining tubing tomorrow.
+
| On site to witness cementing of liner string in SWIW well they ran 1010' of 5.5 and cemented it in place with 200 sacks of Type 1 cement and once cemented they released cementing packer and reversed circulation with 200 bbl of brine water and they will remove remaining tubing tomorrow.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1391809746
 
| 1391809746
 
| 2014-02-05
 
| 2014-02-05
|
+
|  
 
| On site to cement liner string in place again, Universal Well Services mixed 150 sacks of Type 1 cement and they pumped it through tubing and they will bond log well again on 2/7/14 to confirm cement top.
 
| On site to cement liner string in place again, Universal Well Services mixed 150 sacks of Type 1 cement and they pumped it through tubing and they will bond log well again on 2/7/14 to confirm cement top.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1397748319
 
| 1397748319
 
| 2014-04-17
 
| 2014-04-17
|
+
|  
 
| This report correlates with complaint #4667. I received a call from Ginger Maple with concerns that the new injection well in Coshocton was causing fluid to bubble out of her yard. The injection well in question is approximately 8.8 miles from Mrs. Maple's home. I met her at her home to conduct my inspection. I found that there was a steady flow of water from the yard. I also observed periodic bubbling from the ground where the water was pooled. They had dug a small hole at the source of the water and a small ditch to divert the water away from the yard. I conducted a field test of the water with a Quantab and I sampled the air from the bubbles with a hand held gas detector. The results were negative for chlorides and negative for CH4 or H2S. I also tasted the water and found it to be fresh. I concluded that the flow of water from the yard was not related to this injection well.
 
| This report correlates with complaint #4667. I received a call from Ginger Maple with concerns that the new injection well in Coshocton was causing fluid to bubble out of her yard. The injection well in question is approximately 8.8 miles from Mrs. Maple's home. I met her at her home to conduct my inspection. I found that there was a steady flow of water from the yard. I also observed periodic bubbling from the ground where the water was pooled. They had dug a small hole at the source of the water and a small ditch to divert the water away from the yard. I conducted a field test of the water with a Quantab and I sampled the air from the bubbles with a hand held gas detector. The results were negative for chlorides and negative for CH4 or H2S. I also tasted the water and found it to be fresh. I concluded that the flow of water from the yard was not related to this injection well.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1434237038
 +
| 2015-06-09
 +
|
 +
| Inspection revealed that injection pump to this well was in operation on the day of my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1652717491
 +
| 2013-11-04
 +
|
 +
| Inspection revealed that Wildcat Drilling presently drilling on fluid@6450' should be at total depth later this week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1699471152
 +
| 2015-02-25
 +
|
 +
| Inspection revealed that well is not in operation at this time,operator stated they plan on starting pump for this well later this afternoon.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1740583739
 +
| 2014-06-02
 +
|
 +
| Inspection revealed that restoration work at site has been completed and vegetation has been established.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 177146171
 +
| 2015-01-02
 +
|
 +
| Inspection revealed that injection pump was in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the facility on this day.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1780194173
 +
| 2015-01-15
 +
|
 +
| Inspection revealed that injection pump was in operation during my inspection and it was noted that several Elite Oilfield Services vacuum trucks were waiting to unload at the facility during my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1868362510
 
| 1868362510
 
| 2014-01-24
 
| 2014-01-24
|
+
|  
| Bakerwell Service company along with Blue-Dot Services on site going in hole with4.750" bit to drill out cement within 5.5" casing once cement &cement shoe is drilled they will come out of hole to bond log casing and if log looks good they will go back in hole and clean it out to bottom and once that is achieved we will run new packer and injection string into well.
+
| Bakerwell Service company along with Blue-Dot Services on site going in hole with4.750 bit to drill out cement within 5.5 casing once cement &cement shoe is drilled they will come out of hole to bond log casing and if log looks good they will go back in hole and clean it out to bottom and once that is achieved we will run new packer and injection string into well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1871522882
 
| 1871522882
 
| 2013-10-21
 
| 2013-10-21
|
+
|  
 
| Wild Cat drilling was at 3255' drilling on fluid during my inspection.
 
| Wild Cat drilling was at 3255' drilling on fluid during my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1951334660
 
| 1951334660
 
| 2014-01-14
 
| 2014-01-14
|
+
|  
| Bakerwell's service rig moving in on site to run 5.5" liner string into well and cement it in place.
+
| Bakerwell's service rig moving in on site to run 5.5 liner string into well and cement it in place.
 
Note: Informed owner that once casing has been cemented in place and cement drilled out that they would need to run another bond log to verify that they have good integrity with casing.
 
Note: Informed owner that once casing has been cemented in place and cement drilled out that they would need to run another bond log to verify that they have good integrity with casing.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2012450470
 +
| 2014-06-25
 +
|
 +
| Injection pump not in operation today.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2032990822
 +
| 2013-09-23
 +
|
 +
| Inspection revealed that lease road to new well site has been made and they are currently working on clearing  area to build drill site for SWIW well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2045727413
 
| 2045727413
 
| 2014-06-11
 
| 2014-06-11
|
+
|  
 
| Inspection revealed that injection pump was in operation today and it was noted that several Oilfield Services vacuum trucks were waiting to unload at facility while I was performing my inspection.
 
| Inspection revealed that injection pump was in operation today and it was noted that several Oilfield Services vacuum trucks were waiting to unload at facility while I was performing my inspection.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2055506203
 
| 2055506203
 
| 2014-06-18
 
| 2014-06-18
|
+
|  
 
| Inspection revealed that injection pump too this well was not in operation today due to low volume of trucks today.
 
| Inspection revealed that injection pump too this well was not in operation today due to low volume of trucks today.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 27762493
 
| 27762493
 
| 2014-01-31
 
| 2014-01-31
|
+
|  
 
| Stopped by service rig for update on possibly bond logging operation of liner string we placed into well last week operator stated that they would possibly be ready to log well tomorrow afternoon.
 
| Stopped by service rig for update on possibly bond logging operation of liner string we placed into well last week operator stated that they would possibly be ready to log well tomorrow afternoon.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -285455196
 +
| 2013-11-07
 +
|
 +
| Inspection revealed that drilling contractor was rigging down and they reached a total depth of 7016' and planned total depth was 7320' they encountered suspected parted casing@5610' they will regroup and plans are to run liner string into well @6200-5200' and cement it in place.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 292013975
 +
| 2015-03-27
 +
|
 +
| Inspection revealed that injection pump was not in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the time of my inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 329557931
 
| 329557931
 
| 2013-10-31
 
| 2013-10-31
|
+
|  
 
| On site to witness running of temperature log and collar locator and bond log of well casing it was determined that cement top on backside of casing was at 1750' and fluid level inside of casing was noted at 250' down from ground level according to temperature log.
 
| On site to witness running of temperature log and collar locator and bond log of well casing it was determined that cement top on backside of casing was at 1750' and fluid level inside of casing was noted at 250' down from ground level according to temperature log.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -348688084
 +
| 2015-02-13
 +
|
 +
| Inspection revealed that well is shut in at this time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -36642610
 +
| 2014-07-11
 +
|
 +
| Inspection revealed that injection pump was just started prior too our inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -440930857
 +
| 2013-11-25
 +
|
 +
| Baker Wire line Services were on site logging well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -50575651
 +
| 2014-02-11
 +
|
 +
| Inspection revealed that service rig was drilling on cement retainer and once it is drilled they will start drilling on bridge plug and once that is achieved they will start drilling on cement below the liner string.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -539407053
 +
| 2014-05-22
 +
|
 +
| Injection pump was in operation during my inspection.
 +
Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -549250741
 +
| 2015-04-07
 +
|
 +
| Inspection revealed that owner had just started injection pump prior to my arrival at the site and it was noted that nine Elite Oilfield  Services vacuum trucks were waiting to unload at the facility on this day of my inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -560877534
 +
| 2014-04-29
 +
|
 +
| Inspection revealed that well is not being used at this time and it was noted that owner has placed a new set of steps at wellhead so inspector has better access to testing ports on wellhead.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -563770336
 +
| 2014-05-07
 +
|
 +
| On site along with Producers Services to perform 2000 gallon acid treatment on said well.
 +
Note:This well is not used much it is used for back up well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 594539023
 
| 594539023
 
| 2014-07-28
 
| 2014-07-28
|
+
|  
 
| Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
 
| Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -684799276
 +
| 2014-12-08
 +
|
 +
| Inspection revealed that Producers Services was on site to perform acid treatment on said well, they pumped a total of 2000 gallon 500 gal 28% 1000 gal of HF and then 500 gal of 28% and displaced it with 100 bbl. of brine and once brine was in wellbore we shut well down for 1 hour before resuming injection operations.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 685333295
 
| 685333295
 
| 2013-09-26
 
| 2013-09-26
|
+
|  
 
| On site for pre spud drill meeting they plan on moving drilling rig in on site the second week of October.
 
| On site for pre spud drill meeting they plan on moving drilling rig in on site the second week of October.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -692456961
 +
| 2014-08-26
 +
|
 +
| Producers Well Service on site to perform 2000 gallon acid treatment job on said well.
 +
Pressure charts forwarded to central office.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -806803884
 +
| 2014-02-19
 +
|
 +
| Inspection revealed that service rig was pulling tubing from well it was plugged with sand.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -814964348
 +
| 2014-08-15
 +
|
 +
| I am accompanied by Inspector David Ball and Regional Supervisor Rocky King.  The well is not in use.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -82236385
 +
| 2014-01-17
 +
|
 +
| On site with company rep Rex Baker to discuss upcoming casing job and cementing of said casing.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -911100335
 +
| 2014-04-14
 +
|
 +
| Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.
 +
Note: Well not being used today they are currently using the number one well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -939580406
 +
| 2014-02-24
 +
|
 +
| Great White coil tubing unit rigging  on well to wash sand from bottom of hole once sand fill up is removed they will be ready to run tubing and packer into well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -967443891
 +
| 2014-02-07
 +
|
 +
| On site along with Andrew Adgate to witness bond logging of well be Archer Wire line and log indicated that cement top was noted at 5203' just below casing hanger which was set at 5193'.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 07:06, 16 July 2015

Well Details

Well ID: 34-031-27178
Loading map...
County: Coshocton
Municipality:
Operator Name: BUCKEYE BRINE LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-10-12
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.30253732
Longitude: -81.84619002

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1006260148 2014-03-14 On site to pressure test flow line going to wellhead. They filled flow line with fresh water and we pressure tested it at 1525 psi and monitored it for 15 minutes with no decline in pressure.

Note:Flow line is 1100' long and it is 4.5 and 11.6# per foot and is encased within 8.625 which is 24# casing and we also pressure tested annulus of flow line at 1525 psi also.

1057849257 2014-03-27 Inspection revealed that injection pumps were not in operation during my inspection.
1072093696 2014-09-11 Inspection revealed that injection pump to this well was not in operation during my inspection.
1122604924 2014-03-06 On site to witness operator place positive pressure on annulus of injection string, they had to replace valve on wellhead that
1145634747 2015-03-05 Inspection revealed that injection pump was not in operation during my inspection and it was noted that nine Oilfield Solutions vacuum trucks were waiting to unload at the facility during my inspection.
1160407714 2014-02-27 On site to witness tubing and packer run into well and flush annulus with fresh water and inhibitor and pressure test annulus.
1200790268 2014-08-11 Inspection revealed that injection pump too this well was not in service during my inspection.
-1203275818 2014-10-17 Inspection revealed that injection pump too this well was in operation during my inspection and it was noted that all of the storage tanks at the facility are in the process of being repainted.
-126439358 2014-11-06 Inspection revealed that injection pump too this well was in operation today and as noted on previous report all storage tanks have been repainted.
1351050865 2015-03-12 Inspection on this day revealed that injection pump was in operation and it was noted that several vacuum trucks/tankers were waiting to unload at the facility.
135389985 2013-12-12 Waiting on service rig to arrive on site to complete remedial work on casing and then they will bond log casing again and if it is confirmed that they have good bond they will run new packer and tubing into well and test.
1381956781 2013-10-16 On site to witness testing of BOP rig personnel closed BOP and we pressured up to 500# and monitored pressure for 15 minutes with no decline in pressure.
1382042070 2013-10-17 Drilling on fluid@1958' converted to fluid type drilling@1768'due to fact that they were not able to keep up with cleaning cuttings that were coming from well.
1383063780 2013-10-25 Inspection revealed that drilling rig was drilling@4100' and while on site I inspected 8.625 casing that is to be run in well at a later date.
1383150287 2013-10-30 On site to witness running and cementing of 5905of 8.625casing Universal Cemented with 1163 sacks,plug did not land and decision was made to run bond log in well and confirm cement top and check for pipe separation.
1383150553 2013-10-30 On the day of my inspection I witnessed the first stage of a two stage cement job. Wildcat Drilling had drilled an 11.625 hole on fluid to 5933'. They ran 8.625 casing equipped with a DV tool. Universal broke circulation and pumped 600 sacks of cement. Good circulation was maintained throughout the job.
1383324727 2013-11-01 On site to attempt to pressure casing, arrived on site and rig crew loaded casing with 15 bbl fresh water and then DB Energy Management used there solvent truck to apply pressure and he pumped additional 7 bbl of water with a pressure reading of 180 psi maximum so at that point decision was made to trip in hole and drill out stage tool and run bit to bottom and then set bridge plug in bottom of casing and load hole again and then pressure test casing.
1383525462 2013-11-01 On site to witness Appalachian Well Surveys run 8 retrievable bridge plug inside of casing and set it at 5875' and then rig crew loaded casing and we pressured tested casing@1500# and pressure dropped to 1485# during the 15 minute test which was a 1% decline.

Note: Appalachian had to make two runs with collar locator log due to faulty equipment.

1385066962 2013-11-21 Inspection revealed that stone haulers are placing stone across entire location preparing site for down hole E-Logging of well on 11/24/13.
1387406683 2013-12-18 On site to witness tracer testing of potential injection zones in well bore, Coastal Wireline Company and Producers Services performed testing and it was determined that injection zone was identified@6550'-6640' according to tracer logs.

Producers pumped 7.5 bpm@800 psi and once pump truck shut down it took six minutes for pressure to drop to 0 pressure.

1390338649 2014-01-21 On site to witness Bakerwell Service company try and release casing hanger from tubing they were unable to do so this morning due to well flowing after circulating bottoms up with 8.7#brine so they had to call for heavy brine to load hole with and once circulated again flow stopped and we released casing hanger and they started out of hole with working string and the will start cementing packer into well in the morning.
1390516128 2014-01-22 On site to witness cementing of liner string in SWIW well they ran 1010' of 5.5 and cemented it in place with 200 sacks of Type 1 cement and once cemented they released cementing packer and reversed circulation with 200 bbl of brine water and they will remove remaining tubing tomorrow.
1391809746 2014-02-05 On site to cement liner string in place again, Universal Well Services mixed 150 sacks of Type 1 cement and they pumped it through tubing and they will bond log well again on 2/7/14 to confirm cement top.
1397748319 2014-04-17 This report correlates with complaint #4667. I received a call from Ginger Maple with concerns that the new injection well in Coshocton was causing fluid to bubble out of her yard. The injection well in question is approximately 8.8 miles from Mrs. Maple's home. I met her at her home to conduct my inspection. I found that there was a steady flow of water from the yard. I also observed periodic bubbling from the ground where the water was pooled. They had dug a small hole at the source of the water and a small ditch to divert the water away from the yard. I conducted a field test of the water with a Quantab and I sampled the air from the bubbles with a hand held gas detector. The results were negative for chlorides and negative for CH4 or H2S. I also tasted the water and found it to be fresh. I concluded that the flow of water from the yard was not related to this injection well.
1434237038 2015-06-09 Inspection revealed that injection pump to this well was in operation on the day of my inspection.
-1652717491 2013-11-04 Inspection revealed that Wildcat Drilling presently drilling on fluid@6450' should be at total depth later this week.
-1699471152 2015-02-25 Inspection revealed that well is not in operation at this time,operator stated they plan on starting pump for this well later this afternoon.
-1740583739 2014-06-02 Inspection revealed that restoration work at site has been completed and vegetation has been established.
177146171 2015-01-02 Inspection revealed that injection pump was in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the facility on this day.
1780194173 2015-01-15 Inspection revealed that injection pump was in operation during my inspection and it was noted that several Elite Oilfield Services vacuum trucks were waiting to unload at the facility during my inspection.
1868362510 2014-01-24 Bakerwell Service company along with Blue-Dot Services on site going in hole with4.750 bit to drill out cement within 5.5 casing once cement &cement shoe is drilled they will come out of hole to bond log casing and if log looks good they will go back in hole and clean it out to bottom and once that is achieved we will run new packer and injection string into well.
1871522882 2013-10-21 Wild Cat drilling was at 3255' drilling on fluid during my inspection.
1951334660 2014-01-14 Bakerwell's service rig moving in on site to run 5.5 liner string into well and cement it in place.

Note: Informed owner that once casing has been cemented in place and cement drilled out that they would need to run another bond log to verify that they have good integrity with casing.

-2012450470 2014-06-25 Injection pump not in operation today.
-2032990822 2013-09-23 Inspection revealed that lease road to new well site has been made and they are currently working on clearing area to build drill site for SWIW well.
2045727413 2014-06-11 Inspection revealed that injection pump was in operation today and it was noted that several Oilfield Services vacuum trucks were waiting to unload at facility while I was performing my inspection.
2055506203 2014-06-18 Inspection revealed that injection pump too this well was not in operation today due to low volume of trucks today.
27762493 2014-01-31 Stopped by service rig for update on possibly bond logging operation of liner string we placed into well last week operator stated that they would possibly be ready to log well tomorrow afternoon.
-285455196 2013-11-07 Inspection revealed that drilling contractor was rigging down and they reached a total depth of 7016' and planned total depth was 7320' they encountered suspected parted casing@5610' they will regroup and plans are to run liner string into well @6200-5200' and cement it in place.
292013975 2015-03-27 Inspection revealed that injection pump was not in operation during my inspection and it was noted that several vacuum trucks were waiting to unload at the time of my inspection.
329557931 2013-10-31 On site to witness running of temperature log and collar locator and bond log of well casing it was determined that cement top on backside of casing was at 1750' and fluid level inside of casing was noted at 250' down from ground level according to temperature log.
-348688084 2015-02-13 Inspection revealed that well is shut in at this time.
-36642610 2014-07-11 Inspection revealed that injection pump was just started prior too our inspection.
-440930857 2013-11-25 Baker Wire line Services were on site logging well.
-50575651 2014-02-11 Inspection revealed that service rig was drilling on cement retainer and once it is drilled they will start drilling on bridge plug and once that is achieved they will start drilling on cement below the liner string.
-539407053 2014-05-22 Injection pump was in operation during my inspection.

Note: On site with Central Office staff to confirm UIC numbers on brine hauling trucks.

-549250741 2015-04-07 Inspection revealed that owner had just started injection pump prior to my arrival at the site and it was noted that nine Elite Oilfield Services vacuum trucks were waiting to unload at the facility on this day of my inspection.
-560877534 2014-04-29 Inspection revealed that well is not being used at this time and it was noted that owner has placed a new set of steps at wellhead so inspector has better access to testing ports on wellhead.
-563770336 2014-05-07 On site along with Producers Services to perform 2000 gallon acid treatment on said well.

Note:This well is not used much it is used for back up well.

594539023 2014-07-28 Inspection revealed that injection pump was in operation today and it was noted that owner is preparing to paint all storage tanks and make some small upgrades to the facility.
-684799276 2014-12-08 Inspection revealed that Producers Services was on site to perform acid treatment on said well, they pumped a total of 2000 gallon 500 gal 28% 1000 gal of HF and then 500 gal of 28% and displaced it with 100 bbl. of brine and once brine was in wellbore we shut well down for 1 hour before resuming injection operations.
685333295 2013-09-26 On site for pre spud drill meeting they plan on moving drilling rig in on site the second week of October.
-692456961 2014-08-26 Producers Well Service on site to perform 2000 gallon acid treatment job on said well.

Pressure charts forwarded to central office.

-806803884 2014-02-19 Inspection revealed that service rig was pulling tubing from well it was plugged with sand.
-814964348 2014-08-15 I am accompanied by Inspector David Ball and Regional Supervisor Rocky King. The well is not in use.
-82236385 2014-01-17 On site with company rep Rex Baker to discuss upcoming casing job and cementing of said casing.
-911100335 2014-04-14 Inspection revealed that injection pump was in operation today and it was noted that several vacuum trucks were unloading at facility during my inspection.

Note: Well not being used today they are currently using the number one well.

-939580406 2014-02-24 Great White coil tubing unit rigging on well to wash sand from bottom of hole once sand fill up is removed they will be ready to run tubing and packer into well.
-967443891 2014-02-07 On site along with Andrew Adgate to witness bond logging of well be Archer Wire line and log indicated that cement top was noted at 5203' just below casing hanger which was set at 5193'.