X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24447"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24447
 
| Well ID: 34-111-24447
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8266505243, -81.2845636332 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.82665052, -81.28456363 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-03-23
 
| Spud Date: 2014-03-23
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.8266505243
+
| Latitude: 39.82665052
 
|-
 
|-
| Longitude: -81.2845636332
+
| Longitude: -81.28456363
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 1293468.0
 +
| style="text-align:right;" | 85.0
 +
|
 +
|
 +
| style="text-align:right;" | 908.0
 +
| style="text-align:right;" | 85.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 812288.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 204.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
| -460192368
+
| 1143191059
| 2014-04-03
+
| 2014-10-01
|
+
|  
| Status check inspection on the drilling process found Patterson rig 332 on the hole and has drilled 15' out from under the recently set and cemented 13.375'' 2nd intermediate well bore section and has conducted a  blow out preventer and formation integrity test's.
+
| Status check inspection of the completion process found the well stimulation process complete and key Energy's workover rig on location, the well bore process of drilling out the completion plugs to total depth has been completed and the rig is pulling out of the hole with the drill string and shall run the 2.375'' production tubing in the hole.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -933052089
 
| 2014-04-14
 
|
 
|  Status check inspection of the drilling progress found Patterson drilling rig 332 on location drilling the 8.5'' diameter production bore hole at a current depth of 10,600' in the horizontal well bore section with a current directional azimuth of 329 degrees, the horizontal curve kick off point was at 7,409' and the landing point was at 9,917'.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1395654385
 
| 1395654385
 
| 2014-03-24
 
| 2014-03-24
|
+
|  
 
| The said well was spudded on 03/23/2014 by Express Energy top hole rig, 100' of 26''  conductor was cemented to surface on 03/24/2014 by Express Energy cement services with 330 sacks of class A cement ran and a 50% calculated open hole cement excess ran with 15 barrels of cement returns to surface.
 
| The said well was spudded on 03/23/2014 by Express Energy top hole rig, 100' of 26''  conductor was cemented to surface on 03/24/2014 by Express Energy cement services with 330 sacks of class A cement ran and a 50% calculated open hole cement excess ran with 15 barrels of cement returns to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1395949547
 
| 1395949547
 
| 2014-03-27
 
| 2014-03-27
|
+
|  
| On 03/27/14 472' of 18.625'' surface casing was ran and cemented to surface by Allied cement services using 931 sacks of class A- 2% calcium .125 pound per sack flow seal.
+
| On 03/27/14 472' of 18.625'' surface casing was ran and cemented to surface by Allied cement services using 931 sacks of class A- 2% calcium .125 pound per sack flow seal.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1396356705
 
| 1396356705
 
| 2014-04-01
 
| 2014-04-01
|
+
|  
 
| Status check inspection found  the 1st intermediate 17.5'' well bore total drilling depth has been reached at 2,274' with a 13.375'' 54.50# casing string ran with a guide shoe and float collar used along with proper centralizer placement demonstrated.
 
| Status check inspection found  the 1st intermediate 17.5'' well bore total drilling depth has been reached at 2,274' with a 13.375'' 54.50# casing string ran with a guide shoe and float collar used along with proper centralizer placement demonstrated.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1397169112
 
| 1397169112
 
| 2014-04-10
 
| 2014-04-10
|
+
|  
| Status check inspection on the running and cementing of 7,308' of the 2nd intermediate 9.625'' casing string with Halliburton cement services cementing the casing using a lead and tail cement mix with a calculated top of cement at 700' and the casing pressure tested to 3341 psi upon the landing of the plug.
+
| Status check inspection on the running and cementing of 7,308' of the 2nd intermediate 9.625'' casing string with Halliburton cement services cementing the casing using a lead and tail cement mix with a calculated top of cement at 700' and the casing pressure tested to 3341 psi upon the landing of the plug.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -460192368
 +
| 2014-04-03
 +
|
 +
| Status check inspection on the drilling process found Patterson rig 332 on the hole and has drilled 15' out from under the recently set and cemented 13.375'' 2nd intermediate well bore section and has conducted a  blow out preventer and formation integrity test's.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -933052089
 +
| 2014-04-14
 +
|
 +
| Status check inspection of the drilling progress found Patterson drilling rig 332 on location drilling the 8.5'' diameter production bore hole at a current depth of 10,600' in the horizontal well bore section with a current directional azimuth of 329 degrees, the horizontal curve kick off point was at 7,409' and the landing point was at 9,917'.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:39, 16 July 2015

Well Details

Well ID: 34-111-24447
Loading map...
County: Monroe
Municipality:
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-03-23
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.82665052
Longitude: -81.28456363

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 1293468.0 85.0 908.0 85.0
2015-1 812288.0 90.0 204.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1143191059 2014-10-01 Status check inspection of the completion process found the well stimulation process complete and key Energy's workover rig on location, the well bore process of drilling out the completion plugs to total depth has been completed and the rig is pulling out of the hole with the drill string and shall run the 2.375 production tubing in the hole.
1395654385 2014-03-24 The said well was spudded on 03/23/2014 by Express Energy top hole rig, 100' of 26 conductor was cemented to surface on 03/24/2014 by Express Energy cement services with 330 sacks of class A cement ran and a 50% calculated open hole cement excess ran with 15 barrels of cement returns to surface.
1395949547 2014-03-27 On 03/27/14 472' of 18.625 surface casing was ran and cemented to surface by Allied cement services using 931 sacks of class A- 2% calcium .125 pound per sack flow seal.
1396356705 2014-04-01 Status check inspection found the 1st intermediate 17.5 well bore total drilling depth has been reached at 2,274' with a 13.375 54.50# casing string ran with a guide shoe and float collar used along with proper centralizer placement demonstrated.
1397169112 2014-04-10 Status check inspection on the running and cementing of 7,308' of the 2nd intermediate 9.625 casing string with Halliburton cement services cementing the casing using a lead and tail cement mix with a calculated top of cement at 700' and the casing pressure tested to 3341 psi upon the landing of the plug.
-460192368 2014-04-03 Status check inspection on the drilling process found Patterson rig 332 on the hole and has drilled 15' out from under the recently set and cemented 13.375 2nd intermediate well bore section and has conducted a blow out preventer and formation integrity test's.
-933052089 2014-04-14 Status check inspection of the drilling progress found Patterson drilling rig 332 on location drilling the 8.5 diameter production bore hole at a current depth of 10,600' in the horizontal well bore section with a current directional azimuth of 329 degrees, the horizontal curve kick off point was at 7,409' and the landing point was at 9,917'.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.