X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0454143210002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0454143210002
 
| Well ID: 0454143210002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.92600000000004457, -111.99528699999996206 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.926, -111.995287 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-32-045-14W4/2
 
| Location: 00/10-32-045-14W4/2
 +
|-
 +
| Location Alias: 00/10-32-45-14 W4M
 +
|-
 +
| Location Alias 2: 00/10-32-045-14 W4/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Flagstaff County,_Alberta|Flagstaff County]]
 
|-
 
|-
 
| Well Name: RENAISSANCE RIFE KILLAMN 10-32-45-14
 
| Well Name: RENAISSANCE RIFE KILLAMN 10-32-45-14
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0124784
 
|-
 
|-
 
| License Date: 1986-12-04
 
| License Date: 1986-12-04
 
|-
 
|-
| Final Drilling Date: 1986-12-08
+
| License Status: Abandoned
 
|-
 
|-
| Total Depth: 947.0m
+
| Spud Date: 1986-12-05
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 1986-12-08
 
|-
 
|-
| Status: Abandoned
+
| Well Total Depth: 947 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 52.926
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -111.995287
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Latitude: 52.92600000000004457
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1986-12-14
 +
| Perforation
 +
| style="text-align: right;" | 911.5
 +
| style="text-align: right;" | 912.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -111.99528699999996206
+
| 1986-12-15
 +
| Perforation
 +
| style="text-align: right;" | 912.5
 +
| style="text-align: right;" | 913.5
 +
| style="text-align: right;" | 13
 
|-
 
|-
 +
| 1986-12-24
 +
| Perforation
 +
| style="text-align: right;" | 904
 +
| style="text-align: right;" | 905.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1987-11-21
 +
| Perforation
 +
| style="text-align: right;" | 894
 +
| style="text-align: right;" | 896
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-01-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 897
 +
| style="text-align: right;" | 900
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-01-14
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 882
 +
| style="text-align: right;" | 890
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-10-27
 +
| Cement Plug
 +
| style="text-align: right;" | 881
 +
| style="text-align: right;" | 889
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-10-27
 +
| Perforation
 +
| style="text-align: right;" | 798
 +
| style="text-align: right;" | 799
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2006-10-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 798
 +
| style="text-align: right;" | 799
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-10-27
 +
| Cement Plug
 +
| style="text-align: right;" | 724.8
 +
| style="text-align: right;" | 798
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-01-08
 +
| Perforation
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 316
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-01-09
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 316
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-01-09
 +
| Cement Plug
 +
| style="text-align: right;" | 229
 +
| style="text-align: right;" | 315
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-01-27
 +
| Perforation
 +
| style="text-align: right;" | 205
 +
| style="text-align: right;" | 206
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2007-01-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 205
 +
| style="text-align: right;" | 206
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-01-27
 +
| Cement Plug
 +
| style="text-align: right;" | 157
 +
| style="text-align: right;" | 205
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-29
 +
| Perforation
 +
| style="text-align: right;" | 192.5
 +
| style="text-align: right;" | 193.5
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-09-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 192.5
 +
| style="text-align: right;" | 193.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-09-29
 +
| Cement Plug
 +
| style="text-align: right;" | 147.7
 +
| style="text-align: right;" | 193.5
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1986
 +
| style="text-align: right;" | 229
 +
| style="text-align: right;" | 249.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 55.2
 +
|-
 +
| 1987
 +
| style="text-align: right;" | 2899
 +
| style="text-align: right;" | 1293.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 18.0
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 4110
 +
| style="text-align: right;" | 2679.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 49.6
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 07:35, 8 June 2019

Well Details

Well ID: 0454143210002
Loading map...
Location: 00/10-32-045-14W4/2
Location Alias: 00/10-32-45-14 W4M
Location Alias 2: 00/10-32-045-14 W4/02
Province: Alberta
County/Municipality: Flagstaff County
Well Name: RENAISSANCE RIFE KILLAMN 10-32-45-14
Operator Name:
License Number: 0124784
License Date: 1986-12-04
License Status: Abandoned
Spud Date: 1986-12-05
Final Drill Date: 1986-12-08
Well Total Depth: 947 m
Surface Hole Latitude: 52.926
Surface Hole Longitude: -111.995287

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-14 Perforation 911.5 912.5 13
1986-12-15 Perforation 912.5 913.5 13
1986-12-24 Perforation 904 905.5 13
1987-11-21 Perforation 894 896 13
2000-01-14 Packing Device Capped w/Cement 897 900 0
2000-01-14 Packing Device Capped w/Cement 882 890 0
2006-10-27 Cement Plug 881 889 0
2006-10-27 Perforation 798 799 14
2006-10-27 Remedial Casing Cementing 798 799 0
2006-10-27 Cement Plug 724.8 798 0
2007-01-08 Perforation 315 316 13
2007-01-09 Remedial Casing Cementing 315 316 0
2007-01-09 Cement Plug 229 315 0
2007-01-27 Perforation 205 206 14
2007-01-27 Remedial Casing Cementing 205 206 0
2007-01-27 Cement Plug 157 205 0
2007-09-29 Perforation 192.5 193.5 17
2007-09-29 Remedial Casing Cementing 192.5 193.5 0
2007-09-29 Cement Plug 147.7 193.5 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 229 249.4 0.0 55.2
1987 2899 1293.1 0.0 18.0
1988 4110 2679.0 0.0 49.6

For data sources see[4]

References