If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m (Maintenance script moved page 42-009-20084 to 37-009-20084: -i0) |
m |
||
Line 26: | Line 26: | ||
|} | |} | ||
__TOC__ | __TOC__ | ||
− | == | + | == Inspection Data == |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | INSPECTION ID | !scope="col" | INSPECTION ID |
Well ID: 42-009-20084 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.903873,"lon":-78.346636,"icon":""}]} |
County: Bedford | |
Municipality: Monroe Township | |
First Permit Date: None | |
Last Permit Date: None | |
Spud Date: None | |
Unconventional: No | |
Horizontal: Yes | |
Violations: None | |
Latitude: 39.903873 | |
Longitude: -78.346636 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1821453 | 2009-08-19 | No Violations Noted | DIstance waiver inspection. Site is staked. Met on site with Kevin McCrary, Brad Weigly and Mike Tarosky of Spectra Energy. Land owner Karla Levy was also on site. walked to outer edge of proposed pad closest to wetlands Prior delineation has been conducted. Wetland covers an area about 250 sq ft in size. Proposed BMPs should be suficient to protect wetlands from sedimentation.
A permanent access road will come in on the northeast corner of pad. It will follow an existing farm road and need little disturbance to be completed. Road will be constructed to curve away from and around another small area of wetland. Silt fence will be placed between road and wetland area to prevent sedimentation in this area. There will not be any wetlands crossings for this project. The E&S plan submitted with the waiver is adequate and waiver will be approved. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|