X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0624232108002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0624232108002
 
| Well ID: 0624232108002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.37712200000004259, -113.3770439999999553 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.377122, -113.377044 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/08-21-062-23W4/2
 
| Location: 00/08-21-062-23W4/2
 
|-
 
|-
| Well Name: DEML ABEE 8-21-62-23
+
| Location Alias: 00/08-21-62-23 W4M
 +
|-
 +
| Location Alias 2: 00/08-21-062-23 W4/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Athabasca County,_Alberta|Athabasca County]]
 +
|-
 +
| Well Name: Canlin ABEE 8-21-62-23
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0088641
 
|-
 
|-
 
| License Date: 1981-01-29
 
| License Date: 1981-01-29
 
|-
 
|-
| Final Drilling Date: 1981-02-14
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1981-02-07
 +
|-
 +
| Final Drill Date: 1981-02-14
 +
|-
 +
| Well Total Depth: 916 m
 +
|-
 +
| Surface Hole Latitude: 54.377122
 +
|-
 +
| Surface Hole Longitude: -113.377044
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Total Depth: 916.0m
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1981-03-18
 +
| Perforation
 +
| style="text-align: right;" | 893
 +
| style="text-align: right;" | 894
 +
| style="text-align: right;" | 10
 
|-
 
|-
| Status: Abandoned Zone
+
| 1981-03-19
 +
| Perforation
 +
| style="text-align: right;" | 889
 +
| style="text-align: right;" | 890
 +
| style="text-align: right;" | 10
 
|-
 
|-
| Well Type: Not Applicable
+
| 1981-03-19
 +
| Perforation
 +
| style="text-align: right;" | 887
 +
| style="text-align: right;" | 888
 +
| style="text-align: right;" | 10
 
|-
 
|-
| Configuration: Vertical
+
| 1981-03-21
 +
| Perforation
 +
| style="text-align: right;" | 648
 +
| style="text-align: right;" | 649
 +
| style="text-align: right;" | 10
 
|-
 
|-
| Latitude: 54.37712200000004259
+
| 1981-03-21
 +
| Perforation
 +
| style="text-align: right;" | 641.5
 +
| style="text-align: right;" | 643
 +
| style="text-align: right;" | 10
 
|-
 
|-
| Longitude: -113.3770439999999553
+
| 1981-06-28
 +
| Fracture
 +
| style="text-align: right;" | 641.5
 +
| style="text-align: right;" | 649
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-19
 +
| Acid Wash 
 +
| style="text-align: right;" | 887
 +
| style="text-align: right;" | 890
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-03-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 870
 +
| style="text-align: right;" | 878
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-03-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 630.6
 +
| style="text-align: right;" | 638.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-03-14
 +
| Perforation
 +
| style="text-align: right;" | 182.5
 +
| style="text-align: right;" | 186
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1999-11-07
 +
| Cement Squeeze
 +
| style="text-align: right;" | 182.5
 +
| style="text-align: right;" | 185
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-11-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 169.5
 +
| style="text-align: right;" | 177.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-05-09
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 22:04, 9 June 2019

Well Details

Well ID: 0624232108002
Loading map...
Location: 00/08-21-062-23W4/2
Location Alias: 00/08-21-62-23 W4M
Location Alias 2: 00/08-21-062-23 W4/02
Province: Alberta
County/Municipality: Athabasca County
Well Name: Canlin ABEE 8-21-62-23
Operator Name:
License Number: 0088641
License Date: 1981-01-29
License Status: Abandoned
Spud Date: 1981-02-07
Final Drill Date: 1981-02-14
Well Total Depth: 916 m
Surface Hole Latitude: 54.377122
Surface Hole Longitude: -113.377044

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-18 Perforation 893 894 10
1981-03-19 Perforation 889 890 10
1981-03-19 Perforation 887 888 10
1981-03-21 Perforation 648 649 10
1981-03-21 Perforation 641.5 643 10
1981-06-28 Fracture 641.5 649 0
1996-09-19 Acid Wash 887 890 0
1999-03-13 Packing Device Capped w/Cement 870 878 0
1999-03-13 Packing Device Capped w/Cement 630.6 638.6 0
1999-03-14 Perforation 182.5 186 20
1999-11-07 Cement Squeeze 182.5 185 0
1999-11-07 Packing Device Capped w/Cement 169.5 177.5 0

For data sources see[3]



References