| Well ID: 37-003-22168
 
| Well ID: 37-003-22168
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.534375, -80.119433 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.534375, -80.119433 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Kilbuck Township, Allegheny County, Pennsylvania|Kilbuck Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Kilbuck Township,_Allegheny_County,_Pennsylvania|Kilbuck Township]]
 
|-
 
|-
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
 
| Operator Name: [[AMER NATURAL RESOURCES LLC]]
Line 15: Line 19:
 
| Farm/Lease Name: CHARLES LENZNER UNIT 2
 
| Farm/Lease Name: CHARLES LENZNER UNIT 2
 
|-
 
|-
| First Permit Date: 2011-03-14
+
| License Status: Plugged OG Well
 
|-
 
|-
| Last Permit Date: 2011-03-14
+
| Spud Date: 05/05/2011
 
|-
 
|-
| Spud Date: 2011-05-05
+
| Permit Date: 3/14/2011
 
|-
 
|-
| Unconventional: No
+
| Unconventional Well: N
 
|-
 
|-
| Configuration: Vertical
+
| Configuration: Vertical Well
|-
 
| Well Status: ACTIVE
 
|-
 
| Violations: 0
 
 
|-
 
|-
 
| Latitude: 40.534375
 
| Latitude: 40.534375
 
|-
 
|-
 
| Longitude: -80.119433
 
| Longitude: -80.119433
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-0
+
| 2011
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2012
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2012-0
+
| 2013
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2014
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-0
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title =Oil and Gas Production Reports
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-03-31
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
|-
+
== Waste Data ==
|-
+
{| class="wikitable sortable" width="95%"
| 2014-0
+
!scope="col" | Period
| style="text-align:right;" | 0.0
+
!scope="col" | Waste Type
| style="text-align:right;" | 0.0
+
!scope="col" | Quantity
| style="text-align:right;" | 0.0
+
!scope="col" | Disposal Method
| style="text-align:right;" | 0.0
+
!scope="col" | Waste Facility ID
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
| style="text-align:right;" | 0.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 420.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
 
| 2012-0
 
| 2012-0
| style="text-align:right;" | 0.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 568.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0095273
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| 1976559
 
| 1976559
| 2011-04-18
+
| Primary Facility
 +
| 04/18/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| EXCAVATOR DIGGING PIT.
 
| EXCAVATOR DIGGING PIT.
E&S, OK AND ACCESS IS STONED.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1979464
 
| 1979464
| 2011-05-10
+
| Primary Facility
 +
| 05/10/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| RIG DOWN.  
+
| RIG DOWN.
SIT, PIT, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1979466
 
| 1979466
| 2011-05-09
+
| Primary Facility
 +
| 05/09/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
 
| USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1979496
 
| 1979496
| 2011-05-09
+
| Primary Facility
 +
| 05/09/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
 
| DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983161
 
| 1983161
| 2011-05-12
+
| Primary Facility
 +
| 05/12/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| DRILLING COMPLETE. EQUIPTMENT GONE.  
+
| DRILLING COMPLETE. EQUIPTMENT GONE.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983732
 
| 1983732
| 2011-04-20
+
| Primary Facility
 +
| 04/20/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On April 20th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road could use some additional rock.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983807
 
| 1983807
| 2011-05-04
+
| Primary Facility
 +
| 05/04/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 4th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was being rocked.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 4th, 2011 I conducted a routine inspection of the above site.  Drilling has not yet started.  A site ID sign and E&S plan were posted at the site.  The access road was being rocked.  All E&S controls were in place and constructed according to the plan at site.  Pit was constructed.  No accelerated erosion was observed at the time of inspection.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1983812
 
| 1983812
| 2011-05-11
+
| Primary Facility
 +
| 05/11/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 11th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
 
| On May 11th, 2011 I conducted a routine inspection of the above site.  Drilling has started.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2018481
 
| 2018481
| 2011-10-05
+
| Primary Facility
 +
| 10/05/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
 
| THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2027979
 
| 2027979
| 2011-12-08
+
| Primary Facility
 +
| 12/08/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
 
| E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
 
The access road is good.
 
 
The drill pit was good and had adequate freeboard.
 
 
Working on the silt fence at inspection.
 
 
Additional stabilization on banks.
 
 
Weekly inspections and after percipitation events are required.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2051738
 
| 2051738
| 2012-03-20
+
| Primary Facility
 +
| 03/20/2012
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resourcesï¾’ (ANR) Charles Lenzer Unit #2.  The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
+
| On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2.  The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
 
 
However, ANR was unable to complete the restoration on time because of the extremely wet summer and fall (they included documentation).  I granted the extension and the new restoration date will be 8/11/12.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2065239
 
| 2065239
| 2012-04-03
+
| Primary Facility
 +
| 04/03/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
 
| PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2086051
 
| 2086051
| 2012-07-24
+
| Primary Facility
 +
| 07/24/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site.  The new reclamation date is August 5, 2012.  
+
| On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site.  The new reclamation date is August 5, 2012.
 
 
On July 24, 2012, WQS John Ley and I stopped at ANRï¾’s\ï¾’, Charles Lenzner #4 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
 
 
Iï¾’m recording no violations at this time, but the site could use tending.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2100596
 
| 2100596
| 2012-09-06
+
| Primary Facility
 +
| 09/06/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On September 6, 2012, WQS John Ley and I stopped at ANRï¾’s\ï¾’, Charles Lenzner #2 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
+
| On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress.  The site is in fair shape.  Overall the it is vegetated but the silt fence is still up.  We also did not see signs on the well itself.
 
 
Site restoration requires 70% perennial vegetation and the fence removed.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2247336
 
| 2247336
| 2014-01-22
+
| Primary Facility
 +
| 01/22/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
 
| EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2247425
 
| 2247425
| 2014-01-21
+
| Primary Facility
 +
| 01/21/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
 
| OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2251811
 
| 2251811
| 2014-01-24
+
| Primary Facility
 +
| 01/24/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
 
| APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2251812
 
| 2251812
| 2014-01-28
+
| Primary Facility
 +
| 01/28/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
 
| RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2251849
 
| 2251849
| 2014-02-12
+
| Primary Facility
 +
| 02/12/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
 
| WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2251853
 
| 2251853
| 2014-03-04
+
| Primary Facility
 +
| 03/04/2014
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.
 
| WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
<!--==== Violations Commited ====
| title = Oil and Gas Historical Inspection Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
|}-->
| Drilling Fluid Waste (in Barrels)
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 568.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Violation ID
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Penalty ID
| PA0095273
+
!scope="col" | Penalty Code
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
+
!scope="col" | Penalty Status
| JOSEPHINE
+
!scope="col" | Penalty Date
| PA
+
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2011-0
+
|}-->
| Drilling Fluid Waste (in Barrels)
+
<!--==== Fluid Composition Data ====
| style="text-align:right;" | 420.0
+
{| class="wikitable sortable" width="95%"
| Bbl
+
!scope="col" | Job Number
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
!scope="col" | Trade Name
| PA0095273
+
!scope="col" | Supplier
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
+
!scope="col" | Purpose
| JOSEPHINE
+
!scope="col" | Ingredient Name
| PA
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
|}
+
|}-->
For data sources see<ref>{{cite web
+
 
| title = Oil and Gas Historical Waste Report
+
==References==
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
<references/>
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 18:54, 12 July 2019

Well Details

Well ID: 37-003-22168
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Kilbuck Township
Operator Name: AMER NATURAL RESOURCES LLC
Well Pad ID:
Farm/Lease Name: CHARLES LENZNER UNIT 2
License Status: Plugged OG Well
Spud Date: 05/05/2011
Permit Date: 3/14/2011
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.534375
Longitude: -80.119433

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 0.00 0.00 0.00
2012 0.00 0.00 0.00
2013 0.00 0.00 0.00
2014 0.00 0.00 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-0 Drilling Fluid Waste (in Barrels) 420.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-0 Drilling Fluid Waste (in Barrels) 568.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1976559 Primary Facility 04/18/2011 Drilling/Alteration No Violations Noted EXCAVATOR DIGGING PIT.
1979464 Primary Facility 05/10/2011 Drilling/Alteration No Violations Noted RIG DOWN.
1979466 Primary Facility 05/09/2011 Drilling/Alteration No Violations Noted USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY.
1979496 Primary Facility 05/09/2011 Drilling/Alteration No Violations Noted DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK.
1983161 Primary Facility 05/12/2011 Drilling/Alteration No Violations Noted DRILLING COMPLETE. EQUIPTMENT GONE.
1983732 Primary Facility 04/20/2011 Routine/Complete Inspection No Violations Noted On April 20th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road could use some additional rock. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1983807 Primary Facility 05/04/2011 Routine/Complete Inspection No Violations Noted On May 4th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was being rocked. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
1983812 Primary Facility 05/11/2011 Routine/Complete Inspection No Violations Noted On May 11th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved.
2018481 Primary Facility 10/05/2011 Drilling/Alteration No Violations Noted THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011.
2027979 Primary Facility 12/08/2011 Routine/Complete Inspection No Violations Noted E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also).
2051738 Primary Facility 03/20/2012 Administrative/File Review No Violations Noted On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2. The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12.
2065239 Primary Facility 04/03/2012 Routine/Complete Inspection No Violations Noted PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED.
2086051 Primary Facility 07/24/2012 Routine/Complete Inspection No Violations Noted On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site. The new reclamation date is August 5, 2012.
2100596 Primary Facility 09/06/2012 Routine/Complete Inspection No Violations Noted On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress. The site is in fair shape. Overall the it is vegetated but the silt fence is still up. We also did not see signs on the well itself.
2247336 Primary Facility 01/22/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED.
2247425 Primary Facility 01/21/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL.
2251811 Primary Facility 01/24/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER.
2251812 Primary Facility 01/28/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD.
2251849 Primary Facility 02/12/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED.
2251853 Primary Facility 03/04/2014 Plugging(Includes Plugged/Mined Through) No Violations Noted WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE.

For data sources see[6]

References