== Well Inspection Data ==
+
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | INSPECTION ID

Revision as of 02:54, 10 June 2014

Well Details

Well ID: 42-125-24210
Loading map...
County: Washington
Municipality: Amwell Township
Operator Name: RICE DRILLING B LLC
Farm/Lease Name: HULK 1V
First Permit Date: 2010-06-21
Last Permit Date: 2010-06-21
Spud Date: 2010-08-13
Unconventional: Yes
Horizontal: No
Producing: Yes
Violations: 10
Latitude: 40.088111
Longitude: -80.186138

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1915536 2010-09-08 No Violations Noted
1963301 2011-03-07 Outstanding Violations - No Viols Req'd Met with Dave Miller and Derrick Rice of Range to talk about the problems I found during my March 2nd inspections. I found no new problems and got some insight in the old ones.
1963305 2011-03-08 Outstanding Violations - No Viols Req'd Stopped at the site with WQS, Byron Miller (Washington is his county) so he could see the problems. Byron had some additional questions about the pipeline.
1963328 2011-03-18 Violation(s) Noted This inspection was partially in response to a complaint. Gauged progress on formerly mentioned problems and discovered more BMP problems. Made plans to meet with Dave Miller on March 22, 2011. 608123
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 608128
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 608129
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 608130
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 608130
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 629065
1963353 2011-03-21 Violation(s) & Recurring Violations Found several violations on the pipeline project. Will reinspect with supervisor March 22, 2011. 629066
1963358 2011-03-22 Outstanding Violations - No Viols Req'd Returned to site with Supervisor, Vince Yantko and met with Dave Miller. Numerous photographs and collected a water sample for possible AMD.
1970126 2011-04-14 Outstanding Violations - No Viols Req'd No new violations. Slow progress being made. Working on engineering solution for slides.
1970307 2011-05-03 Outstanding Violations - No Viols Req'd On May 4, 2011, I stopped at the Rice¿s Hulk site in Amwell Township to check on their progress towards addressing the problems found earlier in the year.

Because of the exceptionally wet spring, Rice has been able to do very little in the way of addressing the problems. Some BMPs were installed and some seeding was done. Also, a surveying team was on-site taking measurements to address the two slips.

1995788 2011-05-18 Outstanding Violations - No Viols Req'd On May 18, 2011, I stopped at the progress at Rice¿s Hulk site. Very little work was done on site, again because of the wet weather. I noticed the pipeline area was cleared but work had not yet started. I also noticed the water in the freshwater impoundment was nearly above the 2-foot freeboard allowed.

I called Dave Miller and we talked about the work and the freeboard issue. He told me he would watch the impoundment¿s water level. He also told me that the plans for the slides were in the final engineering stages and that they would be submitted to the Department soon.

1995811 2011-06-09 Outstanding Violations - No Viols Req'd On June 9, 2011, I stopped to check on the progress of the 10 Mile Creek to Hulk section of pipeline.

1) Still no E&S Plan on site (there was one for the X-Man to 10 Mile Creek section.

2) The silt fence was down by the corn field.

3) There are ruts and mud throughout the right-of-way.

4) The silt fence is still not installed properly.

5) Many of the breakers on the pipeline right-of-way going up the hill from 10 Mile Creek are washed out.

6) The re-vegetation is very sparse and in some areas it looks like it wasn¿t reseeded at all.

7) At the top of the hill it appears not to be seeded at all and there is a 200 yard area with no breakers in it.

8) In the water withdrawal area (from 10 Mile Creek) some of the E&S controls have not been maintained and now have holes or are knocked down.

I called Dave Miller about these problems told him they needed worked on.

1995828 2011-06-30 Outstanding Violations - No Viols Req'd On June 30, 2011 I stopped at the Hulk pad to gauge progress. The original stream crossing was repaired but the sediment fence near the 10 Mile Creek withdrawal area was still down.
1995883 2011-07-29 Outstanding Violations - No Viols Req'd Inspected the site with Water Quality specialist Supervisor, Vince Yantko. Some progress on original problems but others need addressed. There appears to be no E&S plan for the Hulk fresh water impoundment to Hulk pad part of the pipeline. We talked with Dave Miller and Well Tech personnel.
1995935 2011-07-29 Violation(s) & Outstanding Violations I looked for the Hulk Impoundment to Hulk Wellpad plans at both the Captain Planet Crossing and at the 10 Mile Creek Crossing and could find none. My calls to Mr. Miller make me think that they do not exist. This is an additional violation. 617825
1995935 2011-07-29 Violation(s) & Outstanding Violations I looked for the Hulk Impoundment to Hulk Wellpad plans at both the Captain Planet Crossing and at the 10 Mile Creek Crossing and could find none. My calls to Mr. Miller make me think that they do not exist. This is an additional violation. 617826
2002675 2011-08-17 Outstanding Violations - No Viols Req'd Checked site, but no operations going on during inspection. Wetland and stream crossings
2002689 2011-08-25 Outstanding Violations - No Viols Req'd
2002700 2011-08-31 Outstanding Violations - No Viols Req'd I checked the area with DEP Biologist, Bill McCune. Bill confirmed that stream crossings had occurred and that a wetland was encroached. The drilling company (East Coast Underground) was on-site trying to pull a plastic pipe through the hole they drilled.

There was still not plan or the Little Ten Mile to Hulk pipe line segment and crossing.

2002707 2011-09-14 Violation(s) Noted Violations noted for 5 unpermitted stream crossings and one wetland impact. 620180
2002707 2011-09-14 Violation(s) Noted Violations noted for 5 unpermitted stream crossings and one wetland impact. 620180
2008328 2011-09-30 Outstanding Violations - No Viols Req'd Actively boring under the stream and wetland.
2008336 2011-10-04 Outstanding Violations - No Viols Req'd Still working at the site.
2014348 2011-10-14 Outstanding Violations - No Viols Req'd It appears that the construction is done at this site. However, no restoration work has been done.
2018084 2011-11-02 No Violations Noted Checked the pipelines around the Hulk pad. The slopes were vegetated and stabilized. The active roads to the water withdrawal to Little Ten Mile creek will need stabilized, but these are still in use for at least awhile. This inspection closes out the original Hulk violations covered by the March 21, 2011 NOV. There are still NOVs associated with this site and related pipeline that will be closed separately.
2022766 2011-11-02 Outstanding Violations - No Viols Req'd At inspection Rice's contractor wsa putting geofabric and rock down on the access road.

The pipeline was seeded and mulched as was the extra entrance. I also suggested that the extra entrance be roped off to keep vehicles off of it.

The area is better but work still needs to be done.

2022771 2011-11-17 Outstanding Violations - No Viols Req'd It appears that all crossing work is done. The site is stabilized but there is still some equipment left.
2022883 2011-11-30 No Violations Noted The crossing work is done. The site is mostly stabilized with some minor & continuing maintenance work to be done.

On October 20, 2011, the Department regeistered GP 056311830 & GP08630711-003 for both the utility crossings and the Hulk/Captain Planet area. These permits are on site.

The area is currenlty in compliance. Rice is responsible to maintain the site stabilization, weekly and percipitation event inspections, E&S maintenance and additional installation as needed, as well as all the other conditions in any permit that applies.

Final enforcement action is still pending.

2025846 2011-12-01 No Violations Noted Replaced bridge deck. Considered a repair.
2033115 2011-12-13 Violation(s) Noted No discharge problems but NOV sent for erosion & sedimentation issues. 628871
2033285 2012-01-11 No Violations Noted On January 11, 2012, I stopped at the Hulk pad to check on the progress Rice made toward addressing the problems I discovered on December 13, 2011.

I found that the area had been stabilized for the winter and the BMP controls repaired and replaced.

The secondary access road was stabilized and E&S controls installed. The E&S controls also bar access to this road.

2033327 2012-01-11 No Violations Noted On January 11, 2012, I stopped at the Hulk pad to check on the progress Rice made toward addressing the problems I discovered on December 13, 2011.

I found that the area had been stabilized for the winter and the BMP controls repaired and replaced.

The secondary access road was stabilized and E&S controls installed. The E&S controls also bar access to this road.

The secondary containment to the water pump at the withdrawal point was repaired.

I found no new problems.

2096083 2012-08-07 No Violations Noted Checked E&S and found no problems.
2097232 2012-08-27 No Violations Noted On August 27, 2012, I checked the pipeline that runs between Rice’s Hulk fresh-water impoundment and Rice’s Captain Planet site.

The area had recently been graded and re-seeded. The E&S controls were still on-site and appeared in decent shape.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

References