X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21584"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21584
 
| Well ID: 37-117-21584
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.557838, -77.078902 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.557839, -77.078903 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Tioga County, Pennsylvania|Tioga]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Liberty Township, Tioga County, Pennsylvania|Liberty Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[SWEPI LP]]
+
| County: [[Tioga_County,_Pennsylvania|Tioga]]
 
|-
 
|-
| Well Pad ID: [[145419|145419]]
+
| Municipality: [[Liberty Township,_Tioga_County,_Pennsylvania|Liberty Township]]
 
|-
 
|-
| Farm/Lease Name: LYNN D 719E 4H
+
| Operator Name: [[ROCKDALE MARCELLUS LLC]]
 
|-
 
|-
| First Permit Date: 2012-08-13
+
| Well Pad ID: [[145419]]
 
|-
 
|-
| Last Permit Date: 2012-08-13
+
| Farm/Lease Name: LYNN D 719E 4H
|-
 
| Spud Date: 2012-11-16
 
 
|-
 
|-
| Unconventional: Yes
+
| License Status: Active
 
|-
 
|-
| Horizontal: Yes
+
| Spud Date: 11/16/2012
 
|-
 
|-
| Well Status: ACTIVE
+
| Permit Date: 8/13/2012
 
|-
 
|-
| Violations: 2
+
| Unconventional Well: Y
 
|-
 
|-
| Latitude: 41.557838
+
| Configuration: Horizontal Well
 
|-
 
|-
| Longitude: -77.078902
+
| Latitude: 41.557839
 
|-
 
|-
 +
| Longitude: -77.078903
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2012
| style="text-align:right;" | 0.0
+
| [[SWEPI LP]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2014
| style="text-align:right;" | 0.0
+
| [[SWEPI LP]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2016
| style="text-align:right;" | 0.0
+
| [[SWEPI LP]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[SWEPI LP]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| 2018
| style="text-align:right;" | 0.0
+
| [[ROCKDALE MARCELLUS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 793,037.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 214
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2015-02
+
| 2019
| style="text-align:right;" | 0.0
+
| [[ROCKDALE MARCELLUS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 248,486.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 2,094.34 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 743884
+
| 301358
| PHOENIX RESOURCES LANDFILL
 
| WELLSBORO
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 12.0
+
| style="text-align: right;" | 12.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR0123
+
| WMGR123
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 87.62
+
| style="text-align: right;" | 87.62 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR0123
+
| WMGR123
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 40.0
+
| style="text-align: right;" | 110.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123NC006
+
| WMGR123
| CLEAN STREAMS LLC WILLIAMSPORT FACILITY
 
| WILLIAMSPORT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 40.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR0123
+
| WMGR123NC006
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 613.37
+
| style="text-align: right;" | 613.37 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
| PHOENIX RESOURCES LANDFILL
 
| WELLSBORO
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 65.6
+
| style="text-align: right;" | 238.90 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NC006
+
| WMGR123
| CLEAN STREAMS LLC WILLIAMSPORT FACILITY
 
| WILLIAMSPORT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 238.9
+
| style="text-align: right;" | 65.60 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR0123
+
| WMGR123NC006
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 617.02
+
| style="text-align: right;" | 617.02 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 409.55
+
| style="text-align: right;" | 409.55 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 5.43
+
| style="text-align: right;" | 5.43 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301358
 
| 301358
| PHOENIX RESOURCES LANDFILL
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
 +
| 2013-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 52.50 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 6.98
+
| style="text-align: right;" | 233.86 Bbl
| Bbl
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2013-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 6.98 Bbl
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| 7-3115-00193
 
| 7-3115-00193
| ENVIRONMENTAL PRODUCTS & SERVICES OF VERMONT, INC.
 
| SYRACUSE
 
| NY
 
 
|-
 
|-
 +
| 2013-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 5,176.18 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 52.5
+
| style="text-align: right;" | 31.75 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR119
 
| WMGR119
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 233.86
+
| style="text-align: right;" | 165.86 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR0123
+
| WMGR123
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 5.0
+
| style="text-align: right;" | 4,698.55 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 6,288.94 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2015-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 74.84 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
|-
+
| 2015-1
| 2013-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 183.37 Bbl
| style="text-align:right;" | 31.75
 
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123NC018
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,029.91 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2013-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 165.86
+
| style="text-align: right;" | 30.23 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR0123
+
| WMGR123
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 500.93 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 
|-
 
|-
| 2013-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 444.69 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2018-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,198.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2018-06
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 2.20 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-07
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 83.40 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 130.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123
 +
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 841.12 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 154.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-07
 +
| Produced Fluid (in Tons) RWC 802
 +
| style="text-align: right;" | 14.06 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-07
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.95 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 50.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-08
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.77 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-09
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 63.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2018-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 292.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-09
 +
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 +
| style="text-align: right;" | 31.05 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-09
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 2.81 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 126.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 400.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-11
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.99 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018-12
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 64.80 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 71.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-12
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.54 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 497.80 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2019-02
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 227.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-1
+
| 2019-02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 2,808.00 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2019-02
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 6.88 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019-03
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 358.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2019-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 314.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2019-03
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 3.71 Tons
 +
| LANDFILL
 +
| 301358
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2118706
 
| 2118706
| 2012-11-19
+
| Primary Facility
 +
| 11/19/2012
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
| 654844
 
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 
|-
 
|-
 
| 2118706
 
| 2012-11-19
 
| Violation(s) Noted
 
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 
| 654845
 
| 201E - Failure to comply with terms and conditions of permit
 
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 
|-
 
 
|-
 
|-
 
| 2128607
 
| 2128607
| 2013-01-02
+
| Primary Facility
 +
| 01/02/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2182249
 
| 2182249
| 2013-07-10
+
| Primary Facility
 +
| 07/10/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2194921
 
| 2194921
| 2013-08-07
+
| Primary Facility
 +
| 08/07/2013
 +
| Incident- Response to Accident or Event
 
| No Violations Noted
 
| No Violations Noted
 
| 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT
 
| 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2207796
 
| 2207796
| 2013-09-25
+
| Primary Facility
 +
| 09/25/2013
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2215564
 
| 2215564
| 2013-10-22
+
| Primary Facility
 +
| 10/22/2013
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2230613
 
| 2230613
| 2013-12-18
+
| Primary Facility
 +
| 12/18/2013
 +
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2265777
 +
| Primary Facility
 +
| 04/23/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
|
 
|
 
|-
 
 
|-
 
|-
 
| 2361298
 
| 2361298
| 2015-04-15
+
| Primary Facility
 +
| 04/15/2015
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface.
 
| Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface.
|  
+
|-
|  
+
| 2717057
|  
+
| Primary Facility
 +
| 2018-04-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Weather was 34° and sunny at time of inspection. Well was shut in and not tied into any service plumbing. There are no pressure gauges attached to the well. Well has three annulus vents plumbed to surface that are 2", 1 1/2" and 1" in diameter. The 2 inch annulus vent had an audible bubbling sound coming from it. 100% methane was detected on the 2 inch annulus vent at time of inspection. The other two vents had 0% combustible gas detected. No violations were noted at time of inspection.
 +
|-
 +
| 2732089
 +
| Primary Facility
 +
| 2018-05-14
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface.
 +
|-
 +
| 2738682
 +
| Primary Facility
 +
| 2018-06-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I met Luke Chesner and Levi Lee of Rockdale when I arrived.  Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H.  I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50').  Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter.  I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries.  Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP.  The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the
 +
|-
 +
| 2761149
 +
| Primary Facility
 +
| 2018-08-06
 +
| Incident- Response to Accident or Event
 +
| No Violations Noted
 +
| I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18.  Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank.  The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise.  He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water.  I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil.  I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm).  Towards the rock-lined ditch from the release area, soil con
 +
|-
 +
| 2791203
 +
| Primary Facility
 +
| 2018-10-17
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| No activity on site.  Due to time constraints, only a partial inspection was performed.  Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection.  Soil conductance readings in this area ranged from .20-.53 mS/cm.  Violations remain outstanding.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 2118706
 +
| 654844
 +
| 11/19/2012
 +
| 12/11/2012
 +
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 +
| Administrative
 +
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 +
|-
 +
| 2118706
 +
| 654845
 +
| 11/19/2012
 +
| 06/02/2015
 +
| 201E - Failure to comply with terms and conditions of permit
 +
| Environmental Health & Safety
 +
| the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
 +
|-
 +
|}
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 05/22/2018
 +
| 06/03/2018
 +
| style="text-align: right;" | 6280
 +
| style="text-align: right;" | 163266
 +
| style="text-align: right;" | 1172.55
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="14"| 1
 +
| rowspan="1"| Water
 +
| rowspan="1"| Aqua and Hydro Recovery
 +
| rowspan="1"| Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 99.3
 +
| style="text-align: right;" | 163266
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Biotreat
 +
| rowspan="3"| Clariant
 +
| rowspan="3"| Biocide
 +
| quaternary ammonium chloride
 +
| 68391-01-5
 +
| style="text-align: right;" | 3
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" | 33.93
 +
|-
 +
| glutaraldehyde
 +
| 111-30-8
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" | 33.93
 +
|-
 +
| didecyldimethylammonium chloride
 +
| 7173-51-5
 +
| style="text-align: right;" | 3
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" | 33.93
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Silica Sand
 +
| rowspan="1"| U.S.Silica
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica (quartz)
 +
| 14808-60-7
 +
| style="text-align: right;" | 99.9
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Flotreat
 +
| rowspan="2"| Clariant
 +
| rowspan="2"| Friction Reducer
 +
| Alcohols,C10-16, 6 EO
 +
| 68002-97-1
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" | 78.24
 +
|-
 +
| Hydrocarbons C9-C16
 +
| 64742-47-8
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" | 78.24
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Hydrochloric Acid
 +
| rowspan="2"| Cooper Natural Resources
 +
| rowspan="2"| Perforation Clean Up
 +
| hydrogen chloride
 +
| 7647-01-0
 +
| style="text-align: right;" | 36
 +
| style="text-align: right;" | 0.6
 +
| style="text-align: right;" | 993.71
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 85
 +
| style="text-align: right;" | 0.6
 +
| style="text-align: right;" | 993.71
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| Scaletreat
 +
| rowspan="3"| Clariant
 +
| rowspan="3"| Scale Inhibitor
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.04
 +
| style="text-align: right;" | 58.02
 +
|-
 +
| 2,2'2"-Nitrilotris
 +
| 4862-18-4
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.04
 +
| style="text-align: right;" | 58.02
 +
|-
 +
| ammonium chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.04
 +
| style="text-align: right;" | 58.02
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ProFE 105
 +
| rowspan="1"| ProFrac
 +
| rowspan="1"| Iron Control
 +
| 2-hydroxypropane-1,2,3-tricarboxylic acid
 +
| 77-92-9
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.003
 +
| style="text-align: right;" | 4.43
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ProHib100
 +
| rowspan="1"| ProFrac
 +
| rowspan="1"| Acid Corrosion Inhibitor
 +
| 2-propyn-1-ol compounds with methyloxirane
 +
| 38172-91-7
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.003
 +
| style="text-align: right;" | 4.43
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 12:55, 15 July 2019

Well Details

Well ID: 37-117-21584
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 145419
Farm/Lease Name: LYNN D 719E 4H
License Status: Active
Spud Date: 11/16/2012
Permit Date: 8/13/2012
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.557839
Longitude: -77.078903

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0
2018 ROCKDALE MARCELLUS LLC 793,037.00 214 0.00 0 0.00 0
2019 ROCKDALE MARCELLUS LLC 248,486.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-2 Drill Cuttings (in Tons) 2,094.34 Tons LANDFILL 301358
2012-2 Drilling Fluid Waste (in Barrels) 12.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Fracing Fluid Waste (in Barrels) 87.62 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2013-1 Drill Cuttings (in Tons) 613.37 Tons LANDFILL 301358
2013-1 Drilling Fluid Waste (in Barrels) 238.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-1 Drilling Fluid Waste (in Barrels) 65.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013-1 Drilling Fluid Waste (in Barrels) 617.02 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Fracing Fluid Waste (in Barrels) 409.55 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Drill Cuttings (in Tons) 5.43 Tons LANDFILL 301358
2013-2 Fracing Fluid Waste (in Barrels) 52.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-2 Fracing Fluid Waste (in Barrels) 233.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-2 Fracing Fluid Waste (in Barrels) 6.98 Bbl RESIDUAL WASTE TRANSFER FACILITY 7-3115-00193
2013-2 Fracing Fluid Waste (in Barrels) 5,176.18 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 31.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-2 Produced Fluid (in Barrels) 165.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-2 Produced Fluid (in Barrels) 4,698.55 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 6,288.94 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Fracing Fluid Waste (in Barrels) 74.84 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 183.37 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-1 Produced Fluid (in Barrels) 1,029.91 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 30.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-2 Produced Fluid (in Barrels) 500.93 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-2 Produced Fluid (in Barrels) 444.69 Bbl REUSE OTHER THAN ROAD SPREADING
2018-06 Produced Fluid (in Barrels) RWC 802 1,198.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-06 Synthetic Liner Materials (in Tons) RWC 806 2.20 Tons LANDFILL 301358
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 83.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-07 Produced Fluid (in Barrels) RWC 802 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-07 Produced Fluid (in Barrels) RWC 802 841.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-07 Produced Fluid (in Barrels) RWC 802 154.00 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Tons) RWC 802 14.06 Tons LANDFILL 301358
2018-07 Synthetic Liner Materials (in Tons) RWC 806 0.95 Tons LANDFILL 301358
2018-08 Produced Fluid (in Barrels) RWC 802 50.00 Bbl REUSE (AT WELL PAD)
2018-08 Synthetic Liner Materials (in Tons) RWC 806 0.77 Tons LANDFILL 301358
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 63.00 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 292.00 Bbl REUSE (AT WELL PAD)
2018-09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 31.05 Tons LANDFILL 301358
2018-09 Synthetic Liner Materials (in Tons) RWC 806 2.81 Tons LANDFILL 301358
2018-10 Produced Fluid (in Barrels) RWC 802 126.00 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 400.00 Bbl REUSE (AT WELL PAD)
2018-11 Synthetic Liner Materials (in Tons) RWC 806 0.99 Tons LANDFILL 301358
2018-12 Other Oil & Gas Wastes (in Barrels) RWC 899 64.80 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 71.00 Bbl REUSE (AT WELL PAD)
2018-12 Synthetic Liner Materials (in Tons) RWC 806 0.54 Tons LANDFILL 301358
2019-01 Produced Fluid (in Barrels) RWC 802 497.80 Bbl REUSE (AT WELL PAD)
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 227.33 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 2,808.00 Bbl REUSE (AT WELL PAD)
2019-02 Synthetic Liner Materials (in Tons) RWC 806 6.88 Tons LANDFILL 301358
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 358.00 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 314.00 Bbl REUSE (AT WELL PAD)
2019-03 Synthetic Liner Materials (in Tons) RWC 806 3.71 Tons LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2118706 Primary Facility 11/19/2012 Routine/Complete Inspection Violation(s) Noted the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
2128607 Primary Facility 01/02/2013 Routine/Complete Inspection No Violations Noted
2182249 Primary Facility 07/10/2013 Routine/Complete Inspection No Violations Noted
2194921 Primary Facility 08/07/2013 Incident- Response to Accident or Event No Violations Noted 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT
2207796 Primary Facility 09/25/2013 Follow-up Inspection No Violations Noted
2215564 Primary Facility 10/22/2013 Follow-up Inspection No Violations Noted
2230613 Primary Facility 12/18/2013 Compliance Evaluation No Violations Noted
2265777 Primary Facility 04/23/2014 Routine/Complete Inspection No Violations Noted
2361298 Primary Facility 04/15/2015 Routine/Complete Inspection No Violations Noted Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface.
2717057 Primary Facility 2018-04-11 Routine/Complete Inspection No Violations Noted Weather was 34° and sunny at time of inspection. Well was shut in and not tied into any service plumbing. There are no pressure gauges attached to the well. Well has three annulus vents plumbed to surface that are 2", 1 1/2" and 1" in diameter. The 2 inch annulus vent had an audible bubbling sound coming from it. 100% methane was detected on the 2 inch annulus vent at time of inspection. The other two vents had 0% combustible gas detected. No violations were noted at time of inspection.
2732089 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface.
2738682 Primary Facility 2018-06-05 Routine/Complete Inspection No Violations Noted I met Luke Chesner and Levi Lee of Rockdale when I arrived. Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H. I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50'). Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter. I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries. Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP. The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the
2761149 Primary Facility 2018-08-06 Incident- Response to Accident or Event No Violations Noted I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18. Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank. The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise. He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water. I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil. I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm). Towards the rock-lined ditch from the release area, soil con
2791203 Primary Facility 2018-10-17 Routine/Partial Inspection No Violations Noted No activity on site. Due to time constraints, only a partial inspection was performed. Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection. Soil conductance readings in this area ranged from .20-.53 mS/cm. Violations remain outstanding.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2118706 654844 11/19/2012 12/11/2012 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
2118706 654845 11/19/2012 06/02/2015 201E - Failure to comply with terms and conditions of permit Environmental Health & Safety the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/22/2018 06/03/2018 6280 163266 1172.55

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Aqua and Hydro Recovery Base Fluid Water 7732-18-5 100 99.3 163266
Biotreat Clariant Biocide quaternary ammonium chloride 68391-01-5 3 0.02 33.93
glutaraldehyde 111-30-8 20 0.02 33.93
didecyldimethylammonium chloride 7173-51-5 3 0.02 33.93
Silica Sand U.S.Silica Proppant Crystalline Silica (quartz) 14808-60-7 99.9 0 0
Flotreat Clariant Friction Reducer Alcohols,C10-16, 6 EO 68002-97-1 10 0.05 78.24
Hydrocarbons C9-C16 64742-47-8 50 0.05 78.24
Hydrochloric Acid Cooper Natural Resources Perforation Clean Up hydrogen chloride 7647-01-0 36 0.6 993.71
Water 7732-18-5 85 0.6 993.71
Scaletreat Clariant Scale Inhibitor Methanol 67-56-1 60 0.04 58.02
2,2'2"-Nitrilotris 4862-18-4 5 0.04 58.02
ammonium chloride 12125-02-9 5 0.04 58.02
ProFE 105 ProFrac Iron Control 2-hydroxypropane-1,2,3-tricarboxylic acid 77-92-9 60 0.003 4.43
ProHib100 ProFrac Acid Corrosion Inhibitor 2-propyn-1-ol compounds with methyloxirane 38172-91-7 15 0.003 4.43

For data sources see[7]

References