X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20132"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20132
 
| Well ID: 37-081-20132
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.243261, -76.571013 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.243262, -76.571013 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Lycoming County, Pennsylvania|Lycoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Franklin Township, Lycoming County, Pennsylvania|Franklin Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Lycoming_County,_Pennsylvania|Lycoming]]
 +
|-
 +
| Municipality: [[Franklin Township,_Lycoming_County,_Pennsylvania|Franklin Township]]
 
|-
 
|-
 
| Operator Name: [[EXCO RESOURCES PA LLC]]
 
| Operator Name: [[EXCO RESOURCES PA LLC]]
 
|-
 
|-
| Well Pad ID: [[149330|149330]]
+
| Well Pad ID: [[149330]]
 
|-
 
|-
 
| Farm/Lease Name: SNYDER UNIT 1
 
| Farm/Lease Name: SNYDER UNIT 1
 
|-
 
|-
| First Permit Date: 2008-12-30
+
| License Status: Plugged OG Well
|-
 
| Last Permit Date: 2008-12-30
 
|-
 
| Spud Date: 2009-05-29
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 05/29/2009
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 12/30/2008
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 1
+
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 41.243261
+
| Latitude: 41.243262
 
|-
 
|-
 
| Longitude: -76.571013
 
| Longitude: -76.571013
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2005-0
+
| 2005
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2006
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2006-0
+
| 2007
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2008
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2007-0
+
| 2009
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2010
 +
| [[EXCO RESOURCES PA INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2008-0
+
| 2011
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[EXCO RESOURCES PA INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-3
+
| 2013
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2009-0
+
| 2015
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2017
| style="text-align:right;" | 0.0
+
| [[EXCO RESOURCES PA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-2
+
| 2009-A00
| style="text-align:right;" | 0.0
+
| Drilling
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 490.00 Bbl
| style="text-align:right;" | 0.0
+
| Brine or Industrial Waste Treatment Plt
| style="text-align:right;" | 0.0
+
| PA0101508
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2009-A00
 +
| Fracking Fluid
 +
| style="text-align: right;" | 460.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0101508
 
|-
 
|-
| 2011-1
+
| 2009-A00
| style="text-align:right;" | 0.0
+
| Fracking Fluid
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 530.00 Bbl
| style="text-align:right;" | 0.0
+
| Other
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010-A01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 490.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 
|-
 
|-
| 2011-2
+
| 2010-A01
| style="text-align:right;" | 0.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 530.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0027057
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 460.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 
|-
 
|-
| 2012-1
+
| 2010-S01
| style="text-align:right;" | 0.0
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 245.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0101508
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 265.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0027057
 
|-
 
|-
| 2012-1
+
| 2010-S01
| style="text-align:right;" | 0.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 230.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| PA0101508
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2017-M10
 +
| Spent Lubricant Waste (in Barrels) RWC 809
 +
| style="text-align: right;" | 83.24 Bbl
 +
| LANDFILL
 +
| 301358
 
|-
 
|-
| 2012-2
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title =Oil and Gas Waste Reports
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-03-31
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 +
| 1760520
 +
| Primary Facility
 +
| 01/06/2009
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
|
 
|-
 
|-
| 2013-1
+
| 1764745
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 01/26/2009
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| Outstanding Violations - No Viols Req'd
| style="text-align:right;" | 0.0
+
|  
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1769057
 +
| Primary Facility
 +
| 02/05/2009
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2013-2
+
| 1840703
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 11/04/2009
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| De minimus Violations Noted
| style="text-align:right;" | 0.0
+
| minor E&S issues on fill slope. MAB
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 1856836
 +
| Primary Facility
 +
| 01/13/2010
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
|
 
|-
 
|-
| 2014-1
+
| 2477422
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-04-19
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Inspection to investigate WQS Ben Bahner's observation that gas was flowing from a hissing annular vent. At the time of my inspection, gas was hissing out of the only visible vent. Field monitoring yielded 100% methane. Tenative ID of vent was production x intermediate annulus.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2477424
 +
| Primary Facility
 +
| 2016-04-21
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| Arrived @ 09:00. The purpose of this follow-up inspection was to meet with Bird Smith (EXCO) and measure the flow rate through the annular vent. Bird and I fitted a 1/8” office plate restriction to the annulus at  ¿  09:05. The magnehelic differential pressure gauge stabilized with a reading of 7.4” water at 09:41. This reading converted to  ¿  1400 scf/day.  The composition of this gas was 100% methane, (field monitoring using an Altair 5X gas meter).  The Snyder Unit #1 well has been on regulatory inactive status since 06/09/2014. The Application for Inactive Status, submitted on 06/03/2013, lists the surface casing annulus pressure as: 0 psi. The discrepancy between the conditions observed during this inspection and the conditions described in the Inactive Status Application could be due to a: mistake in the data entered or a change in the well conditions. I discussed this with Bird. Left location @ 10:10
 
|-
 
|-
| 2014-2
+
| 2478304
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-04-25
| style="text-align:right;" | 0.0
+
| Follow-up Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Arrived @ 12:30. Weather sunny, windy. The purpose of this follow-up inspection was to try to check for gas at ground level adjacent to the well head. I sprayed a solution of Dawn dish soap and water on the gravel around the well casing. The solution disappeared. I also set a gas collection device in the gravel to see if measureable methane were being emitted. An Altair 5X gas meter calibrated on 4/25/16 gave a field reading of 3% methane. The reading, however, was not accompanied by a detection with the LEL sensor on the meter, and was accompanied by a rising CO reading, shedding doubt on the field measurement. Contacted EXCO to suggest they investigate further. Left location @ 13:20.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2478317
 +
| Primary Facility
 +
| 2016-04-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| The Snyder Unit 1 well (081-20132) was being vented from the only visible annulus vent on the well head.  This issue will be forwarded to the O&G Insp. for investigation.  The well pad area has been reduced to just a small gravel area around the well. The ESX12-081-0078 was issued on 7/02/2012 but was never implemented.  The well pad was constructed and the well was drilled and completed in 2009. The well site was also reduced to its current size before the ESCGP was issued.  The well site is not connected to any larger site so the ESCGP was never required. Currently, the Well Site Compliance Information Request reply (submitted 9/21/2015) states the well pad is compliant with restoration requirements since the well pad has been reclaimed.  I agree that the well pad area was restored to a very small footprint around the well before inactive status was granted but a Well Site Restoration Report was not received.  Please provide the Well Site Restoration Report since the well site has been restored
 
|-
 
|-
| 2015-02
+
| 2537897
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-11-03
| style="text-align:right;" | 0.0
+
| Follow-up Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Arrived @ 10:00. Weather cloudy, cool. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 10/3/16 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line.
| style="text-align:right;" | 0.0
+
 
 +
It is worth noting that the Snyder Unit 1 well is on regulatory inactive status well. At the time of application, the venting of combustible gas was not described. Based on an email dated 11/1/2016, EXCO plans to plug this well (see attached).  No violations noted at the time of the inspection.
 +
Left @ 10:20.
 +
 
 +
11/1/16
 +
Hi Becky,
 +
 
 +
Sorry for the delay.  We intend to move forward with plugging the Snyder well.  We will forward the plugging procedure to you this week for your review.
 +
 
 +
With regard to schedule, we are trying to line up a workover rig.  Once we have that finalized, then we will set the date and let you know as well as submit the NOI and notification letters as required.
 +
 
 +
Thanks,
 +
 
 +
Brian E. Rushe, P.E.
 +
Regulatory
 
|-
 
|-
 +
| 2564341
 +
| Primary Facility
 +
| 2017-02-22
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| :  Arrived @ 11:00. Weather warm, cloudy, with some minor rain. cloudy, cool. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 2/22/17 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line to the 8-5/8” x 4-1/2” annulus. Previous inspections have noted the flow of combustible gas (first inspection: 4/19/16, IR# 2477422). On 4/21/16, this flow rate was measured to be  ¿ 1400 scf/day.
 +
 +
It is worth noting that the Snyder Unit 1 well is a regulatory inactive status well. At the time of application, the venting of combustible gas was not described, suggesting that conditions at the well have changed. Previously, EXCO informed the Department that it plans to plug this well. The Department is awaiting a plugging proposal..
 +
Left @ 11:36.
 
|-
 
|-
| 2015-01
+
| 2584606
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-04-13
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Arrived @ 15:00. Weather warm. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 4/11/17 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line to the 8-5/8” x 4-1/2” annulus. Previous inspections have noted the flow of combustible gas (first inspection: 4/19/16, IR# 2477422). On 4/21/16, this flow rate was measured to be  ¿ 1400 scf/day.
| style="text-align:right;" | 0.0
+
 
 +
It is worth noting that the Snyder Unit 1 well is a regulatory inactive status well. At the time of application, the venting of combustible gas was not described, suggesting that conditions at the well have changed. Previously, EXCO informed the Department that it plans to plug this well. The Department is awaiting a plugging proposal..
 +
Left @ 15:24.
 
|-
 
|-
 +
| 2624192
 +
| Primary Facility
 +
| 2017-08-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine Inspection of the Snyder 1 well (081-20132). Production tree on well, shut in. 8 5/8” csg vented. No obvious issues observed.
 
|-
 
|-
| 2015-03
+
| 2631567
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-08-31
| style="text-align:right;" | 0.0
+
| Plugging(Includes Plugged/Mined Through)
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Rig on location for P&A. Reviewed procedure w/ Companyman. CIBP will be set later today @ 6375'. Cementers got delayed, expected to cap CIBP w/ cmt. The rig plans to recover ~ 4000' of 4 1/2" csg and complete the rest of the P&A n accordance to the regulations. Operator is plugging as a Non-Coal well. No Issues
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2633213
For data sources see<ref>{{cite web
+
| Primary Facility
| title = Oil and Gas Historical Production Report
+
| 2017-09-07
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| Plugging(Includes Plugged/Mined Through)
| date = 2015-05-26
+
| No Violations Noted
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
| Service rig on location for plug and abandonment. Operator is plugging as Non-Coal. Reviewed and discussed the procedure  with the company man. CIBP has been set at 6375', above perforated interval. Cementers spotted cmt on top of CIBP. 4 1/2" csg is dead. Getting ready to run back in hole w/ TBG and tag. No obvious issues
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2010-3
+
| 2635324
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 490.0
+
| 2017-09-13
| Bbl
+
| Plugging(Includes Plugged/Mined Through)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0101508
+
| On location 8 am. Crew rigging down equipment. Visual inspection of plugged well-- casing full of gel, no bubbling, no gas detected. Spoke w/ Companyman, the crew successfully isolated bottomhole, recovered 4 1/2", and plugged remainder of well in accordance w/ regs. The well will be cut, capped, marked, and buried. GPS location and photo attached. No issues
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
 +
| 2638468
 +
| Primary Facility
 +
| 2017-09-19
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| At the time of the inspection, the well was plugged and buried below plow depth.  No other people or active operations were noted onsite. Waste onsite remains sealed in roll-off boxes on containment.  The site has not yet been restored.  No violations noted.
 
|-
 
|-
| 2010-3
+
| 2640291
| FRACING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 460.0
+
| 2017-09-27
| Bbl
+
| Plugging(Includes Plugged/Mined Through)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0101508
+
| Routine inspection of a plugged well, post-plugging. The well has now been cut, capped, and covered with gravel. I stood above the plugged well and checked for gas at ground level, monitored for several minutes in multiple spots, none detected. No obvious issues.
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
 +
| 2722643
 +
| Primary Facility
 +
| 2018-04-25
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| A routine inspection of this plugged, unconventional well was conducted April 25th, 2018. The well was plugged at the end of last year and is now cut below grade. The pad has since been reclaimed. No open holes, discharges, gas, or other plugging-related issues were observed at surface above the buried well's location at this time.
 
|-
 
|-
| 2010-3
+
| 2801582
| FRACING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 530.0
+
| 2018-11-09
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0027057
+
| Site restored. No post plugging restoration report received by the DEP.  
| WILLIAMSPORT SAN AUTH CENTRAL STP
+
 
| WILLIAMSPORT
+
Please submit the Post Plugging Restoration Report a.s.a.p.
| PA
 
|-
 
|-
 
| 2009-0
 
| DRILLING
 
| style="text-align:right;" | 490.0
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
| PA0101508
 
| PA BRINE
 
|
 
| PA
 
 
|-
 
|-
|-
+
| 2841645
| 2009-0
+
| Primary Facility
| FRACKING FLUID
+
| 2019-02-05
| style="text-align:right;" | 530.0
+
| Routine/Complete Inspection
| Bbl
+
| No Violations Noted
| OTHER
+
| EXCO Resources (PA) LLC has submitted a notice of termination (NOT) to the Department for the Snyder Pad covered under ESX12-081-78. The Department received the NOT on January 11, 2019.
|
+
 
|
+
Department representative Jared Jacobini conducted a restoration site inspection at the above listed site on February 5, 2019. The site sign, emergency response plan, ESCGP, and weekly E&Sinspection log were onsite for review. No E&Sissues were observed during the time of the inspection. The former well pad was constructed on moderately sloped ground. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover. The former well pad site "open field area" meets the definition of permanent stabilization.
|  
+
 
|  
+
To approve the request for an NOT, the document must be signed and stamped by a licensed professional - Page 2, block #5 "Final Certification Of Licensed Professional". This was not completed on the NOT request form. The existing gravel access road has not been removed. The site signs and
|-
 
|-
 
| 2009-0
 
| FRACKING FLUID
 
| style="text-align:right;" | 460.0
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
| PA0101508
 
| PA BRINE
 
|
 
| PA
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
==== Violations Commited ====
| title = Oil and Gas Historical Waste Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Violation ID
!scope="col" | DESCRIPTION
+
!scope="col" | Violation Date
!scope="col" | COMMENT
+
!scope="col" | Date Resolved
!scope="col" | VIOLATION ID
+
!scope="col" | Violation Code
!scope="col" | VIOLATION CODE
+
!scope="col" | Violation Type
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | Violation Comments
|-
 
| 1840703
 
| 2009-11-04
 
| De minimus Violations Noted
 
| minor E&S issues on fill slope.  MAB
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1760520
 
| 1760520
| 2009-01-06
 
| Violation(s) Noted
 
|
 
 
| 554143
 
| 554143
 +
| 01/06/2009
 +
| 02/05/2009
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 +
| Administrative
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 1764745
+
| 554143
| 2009-01-26
+
| 242042
| Outstanding Violations - No Viols Req'd
+
| NOV - Notice of Violation
|
+
| Comply/Closed
|
 
|  
 
 
|  
 
|  
 +
| 02/05/2009
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1769057
+
|}-->
| 2009-02-05
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
|  
+
!scope="col" | Supplier
|  
+
!scope="col" | Purpose
|-
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 1856836
+
|}-->
| 2010-01-13
+
 
| No Violations Noted
+
==References==
|
+
<references/>
|
 
|
 
|
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Inspection Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
| accessdate = 2015-05-27 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 20:14, 17 July 2019

Well Details

Well ID: 37-081-20132
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Franklin Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149330
Farm/Lease Name: SNYDER UNIT 1
License Status: Plugged OG Well
Spud Date: 05/29/2009
Permit Date: 12/30/2008
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 41.243262
Longitude: -76.571013

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 0.00 0.00 0.00
2006 0.00 0.00 0.00
2007 0.00 0.00 0.00
2008 0.00 0.00 0.00
2009 0.00 0.00 0.00
2010 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Drilling 490.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009-A00 Fracking Fluid 460.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009-A00 Fracking Fluid 530.00 Bbl Other
2010-A01 Drilling Fluid Waste (in Barrels) 490.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-A01 Fracing Fluid Waste (in Barrels) 530.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2010-A01 Fracing Fluid Waste (in Barrels) 460.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Drilling Fluid Waste (in Barrels) 245.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Fracing Fluid Waste (in Barrels) 265.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2010-S01 Fracing Fluid Waste (in Barrels) 230.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2017-M10 Spent Lubricant Waste (in Barrels) RWC 809 83.24 Bbl LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1760520 Primary Facility 01/06/2009 Routine/Complete Inspection Violation(s) Noted
1764745 Primary Facility 01/26/2009 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
1769057 Primary Facility 02/05/2009 Routine/Complete Inspection No Violations Noted
1840703 Primary Facility 11/04/2009 Routine/Complete Inspection De minimus Violations Noted minor E&S issues on fill slope. MAB
1856836 Primary Facility 01/13/2010 Routine/Partial Inspection No Violations Noted
2477422 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Inspection to investigate WQS Ben Bahner's observation that gas was flowing from a hissing annular vent. At the time of my inspection, gas was hissing out of the only visible vent. Field monitoring yielded 100% methane. Tenative ID of vent was production x intermediate annulus.
2477424 Primary Facility 2016-04-21 Follow-up Inspection No Violations Noted Arrived @ 09:00. The purpose of this follow-up inspection was to meet with Bird Smith (EXCO) and measure the flow rate through the annular vent. Bird and I fitted a 1/8” office plate restriction to the annulus at ¿ 09:05. The magnehelic differential pressure gauge stabilized with a reading of 7.4” water at 09:41. This reading converted to ¿ 1400 scf/day. The composition of this gas was 100% methane, (field monitoring using an Altair 5X gas meter). The Snyder Unit #1 well has been on regulatory inactive status since 06/09/2014. The Application for Inactive Status, submitted on 06/03/2013, lists the surface casing annulus pressure as: 0 psi. The discrepancy between the conditions observed during this inspection and the conditions described in the Inactive Status Application could be due to a: mistake in the data entered or a change in the well conditions. I discussed this with Bird. Left location @ 10:10
2478304 Primary Facility 2016-04-25 Follow-up Inspection No Violations Noted Arrived @ 12:30. Weather sunny, windy. The purpose of this follow-up inspection was to try to check for gas at ground level adjacent to the well head. I sprayed a solution of Dawn dish soap and water on the gravel around the well casing. The solution disappeared. I also set a gas collection device in the gravel to see if measureable methane were being emitted. An Altair 5X gas meter calibrated on 4/25/16 gave a field reading of 3% methane. The reading, however, was not accompanied by a detection with the LEL sensor on the meter, and was accompanied by a rising CO reading, shedding doubt on the field measurement. Contacted EXCO to suggest they investigate further. Left location @ 13:20.
2478317 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted The Snyder Unit 1 well (081-20132) was being vented from the only visible annulus vent on the well head. This issue will be forwarded to the O&G Insp. for investigation. The well pad area has been reduced to just a small gravel area around the well. The ESX12-081-0078 was issued on 7/02/2012 but was never implemented. The well pad was constructed and the well was drilled and completed in 2009. The well site was also reduced to its current size before the ESCGP was issued. The well site is not connected to any larger site so the ESCGP was never required. Currently, the Well Site Compliance Information Request reply (submitted 9/21/2015) states the well pad is compliant with restoration requirements since the well pad has been reclaimed. I agree that the well pad area was restored to a very small footprint around the well before inactive status was granted but a Well Site Restoration Report was not received. Please provide the Well Site Restoration Report since the well site has been restored
2537897 Primary Facility 2016-11-03 Follow-up Inspection No Violations Noted Arrived @ 10:00. Weather cloudy, cool. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 10/3/16 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line.

It is worth noting that the Snyder Unit 1 well is on regulatory inactive status well. At the time of application, the venting of combustible gas was not described. Based on an email dated 11/1/2016, EXCO plans to plug this well (see attached). No violations noted at the time of the inspection. Left @ 10:20.

11/1/16 Hi Becky,

Sorry for the delay. We intend to move forward with plugging the Snyder well. We will forward the plugging procedure to you this week for your review.

With regard to schedule, we are trying to line up a workover rig. Once we have that finalized, then we will set the date and let you know as well as submit the NOI and notification letters as required.

Thanks,

Brian E. Rushe, P.E. Regulatory

2564341 Primary Facility 2017-02-22 Routine/Complete Inspection No Violations Noted : Arrived @ 11:00. Weather warm, cloudy, with some minor rain. cloudy, cool. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 2/22/17 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line to the 8-5/8” x 4-1/2” annulus. Previous inspections have noted the flow of combustible gas (first inspection: 4/19/16, IR# 2477422). On 4/21/16, this flow rate was measured to be ¿ 1400 scf/day.

It is worth noting that the Snyder Unit 1 well is a regulatory inactive status well. At the time of application, the venting of combustible gas was not described, suggesting that conditions at the well have changed. Previously, EXCO informed the Department that it plans to plug this well. The Department is awaiting a plugging proposal.. Left @ 11:36.

2584606 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Arrived @ 15:00. Weather warm. The purpose of this follow-up inspection was to check on combustible gas concentrations at the annular vent to this well. An Altair 5X gas meter calibrated on 4/11/17 was used to detect 100% combustible gas/volume at the ½” stainless steel vent line to the 8-5/8” x 4-1/2” annulus. Previous inspections have noted the flow of combustible gas (first inspection: 4/19/16, IR# 2477422). On 4/21/16, this flow rate was measured to be ¿ 1400 scf/day.

It is worth noting that the Snyder Unit 1 well is a regulatory inactive status well. At the time of application, the venting of combustible gas was not described, suggesting that conditions at the well have changed. Previously, EXCO informed the Department that it plans to plug this well. The Department is awaiting a plugging proposal.. Left @ 15:24.

2624192 Primary Facility 2017-08-08 Routine/Complete Inspection No Violations Noted Routine Inspection of the Snyder 1 well (081-20132). Production tree on well, shut in. 8 5/8” csg vented. No obvious issues observed.
2631567 Primary Facility 2017-08-31 Plugging(Includes Plugged/Mined Through) No Violations Noted Rig on location for P&A. Reviewed procedure w/ Companyman. CIBP will be set later today @ 6375'. Cementers got delayed, expected to cap CIBP w/ cmt. The rig plans to recover ~ 4000' of 4 1/2" csg and complete the rest of the P&A n accordance to the regulations. Operator is plugging as a Non-Coal well. No Issues
2633213 Primary Facility 2017-09-07 Plugging(Includes Plugged/Mined Through) No Violations Noted Service rig on location for plug and abandonment. Operator is plugging as Non-Coal. Reviewed and discussed the procedure with the company man. CIBP has been set at 6375', above perforated interval. Cementers spotted cmt on top of CIBP. 4 1/2" csg is dead. Getting ready to run back in hole w/ TBG and tag. No obvious issues
2635324 Primary Facility 2017-09-13 Plugging(Includes Plugged/Mined Through) No Violations Noted On location 8 am. Crew rigging down equipment. Visual inspection of plugged well-- casing full of gel, no bubbling, no gas detected. Spoke w/ Companyman, the crew successfully isolated bottomhole, recovered 4 1/2", and plugged remainder of well in accordance w/ regs. The well will be cut, capped, marked, and buried. GPS location and photo attached. No issues
2638468 Primary Facility 2017-09-19 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of the inspection, the well was plugged and buried below plow depth. No other people or active operations were noted onsite. Waste onsite remains sealed in roll-off boxes on containment. The site has not yet been restored. No violations noted.
2640291 Primary Facility 2017-09-27 Plugging(Includes Plugged/Mined Through) No Violations Noted Routine inspection of a plugged well, post-plugging. The well has now been cut, capped, and covered with gravel. I stood above the plugged well and checked for gas at ground level, monitored for several minutes in multiple spots, none detected. No obvious issues.
2722643 Primary Facility 2018-04-25 Plugging(Includes Plugged/Mined Through) No Violations Noted A routine inspection of this plugged, unconventional well was conducted April 25th, 2018. The well was plugged at the end of last year and is now cut below grade. The pad has since been reclaimed. No open holes, discharges, gas, or other plugging-related issues were observed at surface above the buried well's location at this time.
2801582 Primary Facility 2018-11-09 Routine/Complete Inspection No Violations Noted Site restored. No post plugging restoration report received by the DEP.

Please submit the Post Plugging Restoration Report a.s.a.p.

2841645 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted EXCO Resources (PA) LLC has submitted a notice of termination (NOT) to the Department for the Snyder Pad covered under ESX12-081-78. The Department received the NOT on January 11, 2019.

Department representative Jared Jacobini conducted a restoration site inspection at the above listed site on February 5, 2019. The site sign, emergency response plan, ESCGP, and weekly E&Sinspection log were onsite for review. No E&Sissues were observed during the time of the inspection. The former well pad was constructed on moderately sloped ground. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover. The former well pad site "open field area" meets the definition of permanent stabilization.

To approve the request for an NOT, the document must be signed and stamped by a licensed professional - Page 2, block #5 "Final Certification Of Licensed Professional". This was not completed on the NOT request form. The existing gravel access road has not been removed. The site signs and

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1760520 554143 01/06/2009 02/05/2009 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
554143 242042 NOV - Notice of Violation Comply/Closed 02/05/2009

For data sources see[6]

References