X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27877"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-27877
 
| Well ID: 37-129-27877
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.371222, -79.339583 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.371222, -79.339583 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Derry Township, Westmoreland County, Pennsylvania|Derry Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| Well Pad ID: [[147244|147244]]
+
| Municipality: [[Derry Township,_Westmoreland_County,_Pennsylvania|Derry Township]]
 
|-
 
|-
| Farm/Lease Name: PANIZZI UNIT NO 1 2H
+
| Operator Name: [[XPR RESOURCES LLC]]
 
|-
 
|-
| First Permit Date: 2009-06-11
+
| Well Pad ID: [[147244]]
 
|-
 
|-
| Last Permit Date: 2009-06-11
+
| Farm/Lease Name: PANIZZI UNIT NO 1 2H
 
|-
 
|-
| Spud Date: 2009-09-04
+
| License Status: Active
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 09/04/2009
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 6/11/2009
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 40.371222
 
| Latitude: 40.371222
 
|-
 
|-
 
| Longitude: -79.339583
 
| Longitude: -79.339583
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-3
 
| style="text-align:right;" | 319796.0
 
| style="text-align:right;" | 199.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-3
 
| style="text-align:right;" | 27039.0
 
| style="text-align:right;" | 15.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 28852.83
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 179137.19
 
| style="text-align:right;" | 155.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 179137.19
 
| style="text-align:right;" | 155.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 137916.19
 
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 88972.0
 
| style="text-align:right;" | 116.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 115951.0
 
| style="text-align:right;" | 168.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 105964.93
 
| style="text-align:right;" | 183.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-1
 
| style="text-align:right;" | 91148.62
 
| style="text-align:right;" | 180.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2013-2
+
| 2009
| style="text-align:right;" | 91135.13
+
| [[REX ENERGY OPERATING CORPORATION]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 28,852.83
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 31
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" |  
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2010
 +
| [[REX ENERGY OPERATING CORP]]
 +
| style="text-align: right;" | 192,656.69
 +
| style="text-align: right;" | 162
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| 2011
| style="text-align:right;" | 74491.37
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 180.0
+
| style="text-align: right;" | 226,888.19
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 297
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 221,915.93
 +
| style="text-align: right;" | 351
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2013
| style="text-align:right;" | 68201.25
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 182,283.75
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 142,692.62
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
| 2015
| style="text-align:right;" | 8564.59
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 121,848.28
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 107,796.27
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2017
| style="text-align:right;" | 10614.68
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 89,014.33
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 78,802.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
| 2019
| style="text-align:right;" | 10751.98
+
| [[XPR RESOURCES LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 12,274.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
+
|-
!scope="col" | WASTE FACILITY NAME
+
| 2009-A00
!scope="col" | FACILITY CITY
+
| Brine
!scope="col" | FACILITY STATE
+
| style="text-align: right;" | 100.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0091472
 
|-
 
|-
| 2010-3
+
| 2009-A00
| DRILLING FLUID WASTE
+
| Drilling
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 1,615.00 Bbl
| Bbl
+
| Brine or Industrial Waste Treatment Plt
 +
| PA0091472
 +
|-
 +
| 2009-A00
 +
| Drilling
 +
| style="text-align: right;" | 1,090.00 Bbl
 +
| Brine or Industrial Waste Treatment Plt
 +
| PA0101508
 +
|-
 +
| 2010-A01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
 
|-
 
|-
 +
| 2010-A01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,615.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2010-3
+
| 2010-A01
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,220.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2010-A01
| 2010-3
+
| Drilling Fluid Waste (in Barrels)
| DRILLING FLUID WASTE
+
| style="text-align: right;" | 1,615.00 Bbl
| style="text-align:right;" | 1.0
 
| Bbl
 
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
| NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS)
 
|
 
| PA
 
 
|-
 
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 210.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 
|-
 
|-
| 2010-3
+
| 2010-A01
| DRILLING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 3,050.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2010-A01
| 2010-3
+
| Fracing Fluid Waste (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 3,677.00 Bbl
| style="text-align:right;" | 2.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| PA0095273
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010-A01
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,490.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
|-
+
| 2010-A01
| 2010-3
+
| Fracing Fluid Waste (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 3,036.00 Bbl
| style="text-align:right;" | 3.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| PA0101508
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010-A01
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 2,000.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010-A01
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 210.0
+
| style="text-align: right;" | 1,100.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| PA0095273
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
| 2010-3
+
| 2010-S01
| FRACING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 55.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0101508
+
| 301353
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
 
|-
 
|-
|-
+
| 2010-S01
| 2010-3
+
| Drilling Fluid Waste (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 807.50 Bbl
| style="text-align:right;" | 3.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2010-S01
| 2010-3
+
| Drilling Fluid Waste (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 610.00 Bbl
| style="text-align:right;" | 1.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2010-S01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 807.50 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 
|-
 
|-
| 2010-3
+
| 2010-S01
| PRODUCED FLUID
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 105.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2010-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,525.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2010-S01
| 2010-3
+
| Fracing Fluid Waste (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 1,838.50 Bbl
| style="text-align:right;" | 1.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
 +
| 2010-S01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 745.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 
|-
 
|-
| 2010-3
+
| 2010-S01
| PRODUCED FLUID
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 1,518.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0101508
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2010-S01
| 2009-0
+
| Produced Fluid (in Barrels)
| BRINE
+
| style="text-align: right;" | 1,000.00 Bbl
| style="text-align:right;" | 100.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 +
| 2010-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 550.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 
|-
 
|-
| 2009-0
+
| 2010-S02
| DRILLING
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 880.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
| PA0101508
 
| PA BRINE
 
|
 
| PA
 
|-
 
|-
 
| 2009-0
 
| DRILLING
 
| style="text-align:right;" | 1.0
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
| 2010-2
+
| 2010-S02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 110.0
+
| style="text-align: right;" | 110.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2010-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 770.00 Bbl
| style="text-align:right;" | 880.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 180.00 Bbl
| style="text-align:right;" | 180.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
 
|-
 
|-
|-
+
| 2011-S01
| 2011-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 110.00 Bbl
| style="text-align:right;" | 110.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE
 
|
 
| PA
 
 
|-
 
|-
 +
| 2011-S02
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 
|-
 
|-
| 2011-1
+
| 2011-S02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 770.0
+
| style="text-align: right;" | 220.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0254185
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2012-S02
| 2011-2
+
| Produced Fluid (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 566.74 Bbl
| style="text-align:right;" | 110.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2013-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 675.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2014-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 335.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 615.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 440.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-S01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 220.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2011-2
+
| 2016-S02
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 220.0
+
| style="text-align: right;" | 330.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
|-
+
| 2017-M03
| 2012-2
+
| Produced Fluid (in Barrels) RWC 802
| PRODUCED FLUID
+
| style="text-align: right;" | 110.00 Bbl
| style="text-align:right;" | 566.74
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2017-M05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2013-2
+
| 2017-M06
| PRODUCED FLUID
+
| Waste comment only
| style="text-align:right;" | 675.0
+
| style="text-align: right;" | Comment
| Bbl
+
|
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
|
 +
|-
 +
| 2017-M07
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 +
|
 +
|-
 +
| 2017-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
+
|-
 +
| 2017-M11
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2017-M12
 +
| Waste comment only
 +
| style="text-align: right;" |  Comment
 +
|
 +
|
 
|-
 
|-
| 2014-1
+
| 2018-M06
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 335.0
+
| style="text-align: right;" | 120.00 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
 
|  
 
|  
| PA
 
 
|-
 
|-
 +
| 2018-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 120.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2014-2
+
| 2018-M12
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 615.0
+
| style="text-align: right;" | 120.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123SW005
 
| WMGR123SW005
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 
|
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1829552
 
| 1829552
| 2009-09-17
+
| Primary Facility
 +
| 09/17/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UDI 37 DRILLING AHEAD. SILT FENCE IS FALLING DOWN BUT COMPANY MAN SAID IT WOULD BE TAKEN CARE OF RIGHT AWAY. NO DRILLER'S LOG IN THE DOGHOUSE SO I HAD TO GET PIPE INFORMATION FROM THE COMPANY MAN. EVERYTHING ELSE LOOKS OK
 
| UDI 37 DRILLING AHEAD. SILT FENCE IS FALLING DOWN BUT COMPANY MAN SAID IT WOULD BE TAKEN CARE OF RIGHT AWAY. NO DRILLER'S LOG IN THE DOGHOUSE SO I HAD TO GET PIPE INFORMATION FROM THE COMPANY MAN. EVERYTHING ELSE LOOKS OK
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1834859
 
| 1834859
| 2009-10-06
+
| Primary Facility
 +
| 10/06/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HOR MAR. UDI 124 IS SHUT DOWN. KEN ED AND KENNY BURK ARE ALL ON LOCATION. WIRELINE TRUCK, OIL TOOL RENTAL COMPANY FROM MICHIGAN ON LOCATION. KEN AND ED SAY NOTHING IS GOING ON, JUST CUTTING OFF 9 5/8 27" BELOW CELLAR. KENNY BURK LATER SAYS THAT THERE IS ABOUT 250' OF DP STUCK IN THE HOLE FOR A WEEK NOW. RIG IS WAITING ON WASHPIPE.
 
| HOR MAR. UDI 124 IS SHUT DOWN. KEN ED AND KENNY BURK ARE ALL ON LOCATION. WIRELINE TRUCK, OIL TOOL RENTAL COMPANY FROM MICHIGAN ON LOCATION. KEN AND ED SAY NOTHING IS GOING ON, JUST CUTTING OFF 9 5/8 27" BELOW CELLAR. KENNY BURK LATER SAYS THAT THERE IS ABOUT 250' OF DP STUCK IN THE HOLE FOR A WEEK NOW. RIG IS WAITING ON WASHPIPE.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1834864
 
| 1834864
| 2009-10-07
+
| Primary Facility
 +
| 10/07/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HOR MAR. UDI 124  DOWNHOLE WITH OVERSHOT/WASHPIPE. FISH STILL IN HOLE. FRAC PIT CANNOT BE LINED UNTIL STANDING WATER IS GONE. RIG IS CLEAN, CREW IS SOAKING UP FLUID LEAKS WITH OIL SOAKS AND NUTPLUG. PIT FREEBOARD LOOKS GREAT
 
| HOR MAR. UDI 124  DOWNHOLE WITH OVERSHOT/WASHPIPE. FISH STILL IN HOLE. FRAC PIT CANNOT BE LINED UNTIL STANDING WATER IS GONE. RIG IS CLEAN, CREW IS SOAKING UP FLUID LEAKS WITH OIL SOAKS AND NUTPLUG. PIT FREEBOARD LOOKS GREAT
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1834881
 
| 1834881
| 2009-10-08
+
| Primary Facility
 +
| 10/08/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| UDI 124 TRIPPING OUT OF HOLE, THIS TIME WITH THE FISH. I WAITED ON LOCATION UNTIL THE FISH CAME OUT OF THE HOLE. 10 JTS 4.5 DP. BHA OF FLOAT 2.13 XO SUB 1.98 AND TRICONE .8 TOTAL LENGTH OF FISH 321.41' SHOT OFF, FISHED OUT WITH SCREW IN SUB. RETRIEVED AT 13:00 10/8/09
 
| UDI 124 TRIPPING OUT OF HOLE, THIS TIME WITH THE FISH. I WAITED ON LOCATION UNTIL THE FISH CAME OUT OF THE HOLE. 10 JTS 4.5 DP. BHA OF FLOAT 2.13 XO SUB 1.98 AND TRICONE .8 TOTAL LENGTH OF FISH 321.41' SHOT OFF, FISHED OUT WITH SCREW IN SUB. RETRIEVED AT 13:00 10/8/09
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1834883
 
| 1834883
| 2009-09-29
+
| Primary Facility
 +
| 09/29/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HOR MAR. UDI 124 MOVED IN TO DRILL LATERAL TAGGING @ 7650, THEY DIDN'T CEMENT BACK TO THE KICKOFF POINT. REX HAS DRILLED ENOUGH IN THE AREA THAT THEY KNOW EXACTLY WHERE THEY WILL HIT MARCELLUS. SILT FENCE IS REPAIRED, EVERYTHING LOOKS GREAT. KENNY BURK IS THE NEW CM
 
| HOR MAR. UDI 124 MOVED IN TO DRILL LATERAL TAGGING @ 7650, THEY DIDN'T CEMENT BACK TO THE KICKOFF POINT. REX HAS DRILLED ENOUGH IN THE AREA THAT THEY KNOW EXACTLY WHERE THEY WILL HIT MARCELLUS. SILT FENCE IS REPAIRED, EVERYTHING LOOKS GREAT. KENNY BURK IS THE NEW CM
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1842687
 
| 1842687
| 2009-10-21
+
| Primary Facility
 +
| 10/21/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HOR/MARCELLUS  UDI 124 IS REPAIRING PUMP 2. SPILLED DRILLING MUD IS BEING CLEANED UP IN THE BACKYARD. NONE LEFT LOCATION. PIT LINER HAS A HOLE IN IT UP HIGH, AS LONG AS 2 ' FREEBOARD IS MAINTAINED IT SHOULDN'T BE A PROBLEM.
 
| HOR/MARCELLUS  UDI 124 IS REPAIRING PUMP 2. SPILLED DRILLING MUD IS BEING CLEANED UP IN THE BACKYARD. NONE LEFT LOCATION. PIT LINER HAS A HOLE IN IT UP HIGH, AS LONG AS 2 ' FREEBOARD IS MAINTAINED IT SHOULDN'T BE A PROBLEM.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2159170
 
| 2159170
| 2013-04-09
+
| Primary Facility
 +
| 04/09/2013
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection the result of an NOT received by the Department on 4/8/2013.  At the time of inspection the well appeared to drilled and equipped for production.  The well apparatus and brine tanks appear to be in sound working condition.  The site appears to meet the restoration criteria of 70% uniform vegetative coverage.  No observation of accelerated erosion and sedimentation in relation to the access road or well pad.  The Department notes that the Operator has removed perimeter E&S controls. The site appears to meet the requirements set forth by the ESCGP-1 restoration and post construction water management plan. The Department approves the Operators request for the Notice of Termination, ESX09-129-0018.
 
| Inspection the result of an NOT received by the Department on 4/8/2013.  At the time of inspection the well appeared to drilled and equipped for production.  The well apparatus and brine tanks appear to be in sound working condition.  The site appears to meet the restoration criteria of 70% uniform vegetative coverage.  No observation of accelerated erosion and sedimentation in relation to the access road or well pad.  The Department notes that the Operator has removed perimeter E&S controls. The site appears to meet the requirements set forth by the ESCGP-1 restoration and post construction water management plan. The Department approves the Operators request for the Notice of Termination, ESX09-129-0018.
 +
|-
 +
| 2327997
 +
| Primary Facility
 +
| 12/09/2014
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Producing gas. 1 tank and 1 skid box onsite. Tag and e&s ok,
 +
|-
 +
| 2442029
 +
| Primary Facility
 +
| 2016-01-14
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no E& S issues in relation to site and/or access road.
 +
|-
 +
| 2474460
 +
| Primary Facility
 +
| 2016-04-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok.
 +
|-
 +
| 2621730
 +
| Primary Facility
 +
| 2017-08-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
 +
|-
 +
| 2678384
 +
| Primary Facility
 +
| 2018-01-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well equipped for production. Brine tank within secondary containment and appear structurally sound. No E&S issues.
 +
|-
 +
| 2690522
 +
| Primary Facility
 +
| 2018-02-01
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
| At the time of inspection well equipped for production. Brine tank within secondary containment and appear to be structurally sound. No E&S issues.
 +
Site id sign updated to reflect current Operator information.
 +
PPC plan and ERP appear to reflect outdated Operator information.
 +
Department request Operator update documents accordingly in accordance with regulation.
 +
Violations are being issued under 25 PA Code 78a.55(i)(5)(i) and 25 PA Code 78a.55(i)(5)(iii).
 +
|-
 +
| 2738233
 +
| Primary Facility
 +
| 2018-03-02
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| ERP and PPC plan updated.
 +
Previously issued violations have been corrected.
 +
|-
 +
| 2844518
 +
| Primary Facility
 +
| 2019-02-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well producting.  Reports up to date. Well tag present. No issues at the site
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 2690522
 +
| 807602
 +
| 2018-02-01
 +
| 2018-03-02
 +
| 78a55(i)5i
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
| 2690522
 +
| 807603
 +
| 2018-02-01
 +
| 2018-03-02
 +
| 78a55(i)5iii
 +
| Environmental Health & Safety
 
|  
 
|  
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
| 807602
 +
| 361323
 +
| NOV - Notice of Violation
 
|  
 
|  
 +
|
 +
| 2019-01-23
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 807602
 +
| 371697
 +
| CACP - Consent Assessment of Civil Penalty
 +
| COMP - Completed
 +
| 01/23/2019
 +
| 2019-01-23
 +
| style="text-align: right;" | $11,000.00
 +
| style="text-align: right;" | $11,000.00
 
|-
 
|-
| 2327997
+
| 807603
| 2014-12-09
+
| 361323
| No Violations Noted
+
| NOV - Notice of Violation
| Producing gas. 1 tank and 1 skid box onsite. Tag and e&s ok
 
|  
 
 
|  
 
|  
 
|  
 
|  
 +
| 2019-01-23
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 807603
 +
| 371697
 +
| CACP - Consent Assessment of Civil Penalty
 +
| COMP - Completed
 +
| 01/23/2019
 +
| 2019-01-23
 +
| style="text-align: right;" | $11,000.00
 +
| style="text-align: right;" | $11,000.00
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 22:58, 17 July 2019

Well Details

Well ID: 37-129-27877
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 147244
Farm/Lease Name: PANIZZI UNIT NO 1 2H
License Status: Active
Spud Date: 09/04/2009
Permit Date: 6/11/2009
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.371222
Longitude: -79.339583

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 REX ENERGY OPERATING CORPORATION 28,852.83 31 0.00 0.00
2010 REX ENERGY OPERATING CORP 192,656.69 162 0.00 0 0.00 0
2011 XPR RESOURCES LLC 226,888.19 297 0.00 0 0.00 0
2012 XPR RESOURCES LLC 221,915.93 351 0.00 0 0.00 0
2013 XPR RESOURCES LLC 182,283.75 364 0.00 0 0.00 0
2014 XPR RESOURCES LLC 142,692.62 361 0.00 0 0.00 0
2015 XPR RESOURCES LLC 121,848.28 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 107,796.27 363 0.00 0 0.00 0
2017 XPR RESOURCES LLC 89,014.33 365 0.00 0 0.00 0
2018 XPR RESOURCES LLC 78,802.00 361 0.00 0 0.00 0
2019 XPR RESOURCES LLC 12,274.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Brine 100.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Drilling 1,615.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Drilling 1,090.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010-A01 Drilling Fluid Waste (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Drilling Fluid Waste (in Barrels) 1,615.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Drilling Fluid Waste (in Barrels) 1,220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-A01 Drilling Fluid Waste (in Barrels) 1,615.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-A01 Fracing Fluid Waste (in Barrels) 210.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Fracing Fluid Waste (in Barrels) 3,050.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Fracing Fluid Waste (in Barrels) 3,677.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-A01 Fracing Fluid Waste (in Barrels) 1,490.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010-A01 Fracing Fluid Waste (in Barrels) 3,036.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-A01 Produced Fluid (in Barrels) 2,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Produced Fluid (in Barrels) 1,100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S01 Drilling Fluid Waste (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Drilling Fluid Waste (in Barrels) 807.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Drilling Fluid Waste (in Barrels) 610.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S01 Drilling Fluid Waste (in Barrels) 807.50 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Fracing Fluid Waste (in Barrels) 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Fracing Fluid Waste (in Barrels) 1,525.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Fracing Fluid Waste (in Barrels) 1,838.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S01 Fracing Fluid Waste (in Barrels) 745.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010-S01 Fracing Fluid Waste (in Barrels) 1,518.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Produced Fluid (in Barrels) 1,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Produced Fluid (in Barrels) 550.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S02 Produced Fluid (in Barrels) 880.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S02 Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011-S01 Produced Fluid (in Barrels) 770.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-S01 Produced Fluid (in Barrels) 180.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-S01 Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-S02 Fracing Fluid Waste (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011-S02 Produced Fluid (in Barrels) 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-S02 Produced Fluid (in Barrels) 566.74 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013-S02 Produced Fluid (in Barrels) 675.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S01 Produced Fluid (in Barrels) 335.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S02 Produced Fluid (in Barrels) 615.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S02 Produced Fluid (in Barrels) 440.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S01 Produced Fluid (in Barrels) RWC 802 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S02 Produced Fluid (in Barrels) RWC 802 330.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M03 Produced Fluid (in Barrels) RWC 802 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M05 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M06 Waste comment only Comment
2017-M07 Waste comment only Comment
2017-M08 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Waste comment only Comment
2017-M12 Waste comment only Comment
2018-M06 Produced Fluid (in Barrels) RWC 802 120.00 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M12 Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1829552 Primary Facility 09/17/2009 Drilling/Alteration No Violations Noted UDI 37 DRILLING AHEAD. SILT FENCE IS FALLING DOWN BUT COMPANY MAN SAID IT WOULD BE TAKEN CARE OF RIGHT AWAY. NO DRILLER'S LOG IN THE DOGHOUSE SO I HAD TO GET PIPE INFORMATION FROM THE COMPANY MAN. EVERYTHING ELSE LOOKS OK
1834859 Primary Facility 10/06/2009 Drilling/Alteration No Violations Noted HOR MAR. UDI 124 IS SHUT DOWN. KEN ED AND KENNY BURK ARE ALL ON LOCATION. WIRELINE TRUCK, OIL TOOL RENTAL COMPANY FROM MICHIGAN ON LOCATION. KEN AND ED SAY NOTHING IS GOING ON, JUST CUTTING OFF 9 5/8 27" BELOW CELLAR. KENNY BURK LATER SAYS THAT THERE IS ABOUT 250' OF DP STUCK IN THE HOLE FOR A WEEK NOW. RIG IS WAITING ON WASHPIPE.
1834864 Primary Facility 10/07/2009 Drilling/Alteration No Violations Noted HOR MAR. UDI 124 DOWNHOLE WITH OVERSHOT/WASHPIPE. FISH STILL IN HOLE. FRAC PIT CANNOT BE LINED UNTIL STANDING WATER IS GONE. RIG IS CLEAN, CREW IS SOAKING UP FLUID LEAKS WITH OIL SOAKS AND NUTPLUG. PIT FREEBOARD LOOKS GREAT
1834881 Primary Facility 10/08/2009 Drilling/Alteration No Violations Noted UDI 124 TRIPPING OUT OF HOLE, THIS TIME WITH THE FISH. I WAITED ON LOCATION UNTIL THE FISH CAME OUT OF THE HOLE. 10 JTS 4.5 DP. BHA OF FLOAT 2.13 XO SUB 1.98 AND TRICONE .8 TOTAL LENGTH OF FISH 321.41' SHOT OFF, FISHED OUT WITH SCREW IN SUB. RETRIEVED AT 13:00 10/8/09
1834883 Primary Facility 09/29/2009 Drilling/Alteration No Violations Noted HOR MAR. UDI 124 MOVED IN TO DRILL LATERAL TAGGING @ 7650, THEY DIDN'T CEMENT BACK TO THE KICKOFF POINT. REX HAS DRILLED ENOUGH IN THE AREA THAT THEY KNOW EXACTLY WHERE THEY WILL HIT MARCELLUS. SILT FENCE IS REPAIRED, EVERYTHING LOOKS GREAT. KENNY BURK IS THE NEW CM
1842687 Primary Facility 10/21/2009 Drilling/Alteration No Violations Noted HOR/MARCELLUS UDI 124 IS REPAIRING PUMP 2. SPILLED DRILLING MUD IS BEING CLEANED UP IN THE BACKYARD. NONE LEFT LOCATION. PIT LINER HAS A HOLE IN IT UP HIGH, AS LONG AS 2 ' FREEBOARD IS MAINTAINED IT SHOULDN'T BE A PROBLEM.
2159170 Primary Facility 04/09/2013 Site Restoration No Violations Noted Inspection the result of an NOT received by the Department on 4/8/2013. At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound working condition. The site appears to meet the restoration criteria of 70% uniform vegetative coverage. No observation of accelerated erosion and sedimentation in relation to the access road or well pad. The Department notes that the Operator has removed perimeter E&S controls. The site appears to meet the requirements set forth by the ESCGP-1 restoration and post construction water management plan. The Department approves the Operators request for the Notice of Termination, ESX09-129-0018.
2327997 Primary Facility 12/09/2014 Complaint Inspection No Violations Noted Producing gas. 1 tank and 1 skid box onsite. Tag and e&s ok,
2442029 Primary Facility 2016-01-14 Routine/Complete Inspection No Violations Noted Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no E& S issues in relation to site and/or access road.
2474460 Primary Facility 2016-04-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok.
2621730 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2678384 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appear structurally sound. No E&S issues.
2690522 Primary Facility 2018-02-01 Routine/Complete Inspection Violation(s) Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appear to be structurally sound. No E&S issues.

Site id sign updated to reflect current Operator information. PPC plan and ERP appear to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violations are being issued under 25 PA Code 78a.55(i)(5)(i) and 25 PA Code 78a.55(i)(5)(iii).

2738233 Primary Facility 2018-03-02 Compliance Evaluation No Violations Noted ERP and PPC plan updated.

Previously issued violations have been corrected.

2844518 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Well producting. Reports up to date. Well tag present. No issues at the site

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2690522 807602 2018-02-01 2018-03-02 78a55(i)5i Environmental Health & Safety
2690522 807603 2018-02-01 2018-03-02 78a55(i)5iii Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
807602 361323 NOV - Notice of Violation 2019-01-23
807602 371697 CACP - Consent Assessment of Civil Penalty COMP - Completed 01/23/2019 2019-01-23 $11,000.00 $11,000.00
807603 361323 NOV - Notice of Violation 2019-01-23
807603 371697 CACP - Consent Assessment of Civil Penalty COMP - Completed 01/23/2019 2019-01-23 $11,000.00 $11,000.00

For data sources see[6]

References