If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
{| class="wikitable" width="95%" | {| class="wikitable" width="95%" | ||
Line 23: | Line 24: | ||
|- | |- | ||
|} | |} | ||
− | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" |
Well ID: 37-005-30684 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.994694,"lon":-79.329086,"icon":""}]} |
Operator Name: HIGHPOINTE OIL & GAS LLC | |
First Permit Date: 2010-07-27 | |
Last Permit Date: 2010-07-27 | |
Spud Date: 2010-10-30 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.994694 | |
Longitude: -79.329086 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 7218.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8365.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 8428.0 | 300.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 50.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2011-0 | PRODUCED FLUID | 160.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2012-0 | PRODUCED FLUID | 50.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2013-0 | PRODUCED FLUID | 80.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT | PUNXSUTAWNEY | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1923822 | 2010-10-29 | No Violations Noted | Site construction underway, drilling had commenced at the time of the inspection. Erosion controls for the site and access road had been implemented as outlined in the E&S plan. | |
1927444 | 2010-11-15 | No Violations Noted | Drilling and well stimulation had been completed at the time of the inspection. Well was flowing back into the below grade pit located onsite. Pit had more than the required two feet of lined freeboard. All access road and site erosion controls had been implemented properly and no evidence of accelerated erosion or sedimentation was observed. | |
1950634 | 2011-02-17 | No Violations Noted | Drilling had been completed. Well was equipped for production, brine tank located onsite and appeared to be in sound condition. Drill pit still located onsite and it had the required two feet of lined freeboard, however once the fluid melts the operator should remove fluids from the pit for disposal. Operator should close the drill pit, begin final site grading along with final site and access road stabilization as soon as the weather permits. All access road and site erosion controls had been implemented properly and no evidence of accelerated erosion or sedimentation was observed. | |
2066760 | 2012-05-10 | No Violations Noted | Drilling was completed 11/05/10, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Noted that a majority of what was the well pad had been tilled as part of a cultivated crop field. The remainder of the well-site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. |