If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 2011- | + | | License Date: 2011-03-31 |
|- | |- | ||
| Spud Date: 2011-04-20 | | Spud Date: 2011-04-20 |
Well ID: 34-157-25481 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.333111178,"lon":-81.45560091,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Clay Township | |
Operator Name: LLP GAS AND OIL CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: GARABRANDT | |
License Status: Producing | |
License Date: 2011-03-31 | |
Spud Date: 2011-04-20 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2011-06-12 | |
Well Total Depth: 1095 ft | |
Configuration: Vertical | |
Latitude: 40.333111178 | |
Longitude: -81.45560091 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-03-31 | Proposed Formations:BEREA, Issued Date:3/31/2011, Expired Date:3/30/2013 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-06-12 | |
Completion Report Received | 2011-07-25 | |
Construction Permit Expires | 2013-03-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-10-03 | 1090 | 1095 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-06-28 | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | LLP GAS AND OIL CORPORATION | 0 | 69 | 365 |
2014 | LLP GAS AND OIL CORPORATION | 0 | 50 | 365 |
2015 | LLP GAS AND OIL CORPORATION | 0 | 82 | 365 |
2016 | LLP GAS AND OIL CORPORATION | 0 | 104 | 365 |
2017 | LLP GAS AND OIL CORPORATION | 0 | 104 | 365 |
2018 | LLP GAS AND OIL CORPORATION | 0 | 78 | 329 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | LLP GAS AND OIL CORPORATION | Brine | 0 | 365 |
2014 | LLP GAS AND OIL CORPORATION | Brine | 0 | 365 |
2015 | LLP GAS AND OIL CORPORATION | Brine | 0 | 365 |
2016 | LLP GAS AND OIL CORPORATION | Brine | 0 | 365 |
2017 | LLP GAS AND OIL CORPORATION | Brine | 0 | 365 |
2018 | LLP GAS AND OIL CORPORATION | Brine | 0 | 329 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1725021216 | 2011-04-22 | Drill / Deepen / Reopen | No Violations | On location for surface cement job. Pits in good condition. No violations. |
2009911600 | 2013-12-31 | Preliminary Restoration | No Violations | The site passed preliminary restoration according to 1509.072A. |
For data sources see[9]