If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 1982- | + | | License Date: 1982-01-29 |
|- | |- | ||
| Spud Date: 1982-02-27 | | Spud Date: 1982-02-27 |
Well ID: 34-155-22123 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.268219394,"lon":-80.90804612,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Braceville Township | |
Operator Name: WAYNE HAMMOND ENTERPRISES INC | |
Well Pad ID: | |
Farm/Lease Name: HILAND | |
License Status: Producing | |
License Date: 1982-01-29 | |
Spud Date: 1982-02-27 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-05-21 | |
Well Total Depth: 4460 ft | |
Configuration: Vertical | |
Latitude: 41.268219394 | |
Longitude: -80.90804612 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-01-29 | 387 CHARLEBOIS ENERGY PROD IN GeoDate 1/29/82 |
Oil and Gas | 1982-01-29 | Issued Date 2/1/82 Expired Date 7/31/82 Acres 0041250 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04460 Proposed Drill Depth 04460 |
Original Spud | 1982-02-27 | |
Completed | 1982-05-21 | |
Reached Total Depth | 1982-05-21 | |
Construction Permit Expires | 1982-07-31 | |
Completion Report Received | 1986-06-04 | |
Change of Owner | 2005-12-29 | Operator changed from 387, CHARLEBOIS ENERGY PROD IN to 778, HAMMOND W ENTERPRISES INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4245 | 4360 | 14 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 150 Mscf | 0 | |||
H2O | 0 | 180 Bbl | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | RAY PANDER TRUCKING INC | 2851 | 0 | 335 |
2001 | WAYNE HAMMOND ENTERPRISES INC | 664 | 22 | 365 |
2002 | WAYNE HAMMOND ENTERPRISES INC | 2016 | 0 | 365 |
2003 | WAYNE HAMMOND ENTERPRISES INC | 1964 | 0 | 365 |
2004 | WAYNE HAMMOND ENTERPRISES INC | 1289 | 0 | 365 |
2005 | WAYNE HAMMOND ENTERPRISES INC | 2125 | 0 | 365 |
2006 | WAYNE HAMMOND ENTERPRISES INC | 1872 | 28 | 365 |
2007 | WAYNE HAMMOND ENTERPRISES INC | 1688 | 29 | 365 |
2008 | WAYNE HAMMOND ENTERPRISES INC | 1744 | 0 | 365 |
2009 | WAYNE HAMMOND ENTERPRISES INC | 1618 | 30 | 365 |
2010 | WAYNE HAMMOND ENTERPRISES INC | 206 | 0 | 365 |
2011 | WAYNE HAMMOND ENTERPRISES INC | 1265 | 157 | 365 |
2012 | WAYNE HAMMOND ENTERPRISES INC | 1378 | 0 | 366 |
2013 | WAYNE HAMMOND ENTERPRISES INC | 1372 | 30 | 365 |
2014 | WAYNE HAMMOND ENTERPRISES INC | 650 | 0 | 365 |
2015 | WAYNE HAMMOND ENTERPRISES INC | 882 | 0 | 365 |
2016 | WAYNE HAMMOND ENTERPRISES INC | 1580 | 28 | 365 |
2017 | WAYNE HAMMOND ENTERPRISES INC | 1006 | 0 | 365 |
2018 | WAYNE HAMMOND ENTERPRISES INC | 1056 | 12 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | RAY PANDER TRUCKING INC | Brine | 80 | 335 |
2001 | WAYNE HAMMOND ENTERPRISES INC | Brine | 11 | 365 |
2002 | WAYNE HAMMOND ENTERPRISES INC | Brine | 0 | 365 |
2003 | WAYNE HAMMOND ENTERPRISES INC | Brine | 31 | 365 |
2004 | WAYNE HAMMOND ENTERPRISES INC | Brine | 27 | 365 |
2005 | WAYNE HAMMOND ENTERPRISES INC | Brine | 18 | 365 |
2006 | WAYNE HAMMOND ENTERPRISES INC | Brine | 21 | 365 |
2007 | WAYNE HAMMOND ENTERPRISES INC | Brine | 27 | 365 |
2008 | WAYNE HAMMOND ENTERPRISES INC | Brine | 25 | 365 |
2009 | WAYNE HAMMOND ENTERPRISES INC | Brine | 15 | 365 |
2010 | WAYNE HAMMOND ENTERPRISES INC | Brine | 0 | 365 |
2011 | WAYNE HAMMOND ENTERPRISES INC | Brine | 0 | 365 |
2012 | WAYNE HAMMOND ENTERPRISES INC | Brine | 41 | 366 |
2013 | WAYNE HAMMOND ENTERPRISES INC | Brine | 28 | 365 |
2014 | WAYNE HAMMOND ENTERPRISES INC | Brine | 0 | 365 |
2015 | WAYNE HAMMOND ENTERPRISES INC | Brine | 23 | 365 |
2016 | WAYNE HAMMOND ENTERPRISES INC | Brine | 66 | 365 |
2017 | WAYNE HAMMOND ENTERPRISES INC | Brine | 27 | 365 |
2018 | WAYNE HAMMOND ENTERPRISES INC | Brine | 7 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL4044 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0061882611 | 2013-03-05 | Production Wells | No Violations | My inspection found the well equipped with a plunger lift unit. The tank battery contained one, 100 barrel production tank and a separator. The dike was highly weathered and not capable of containment requirements. The well was in production and the records were up to date on our database. There was a plug on the load line. The proper identification sign was posted. The lease road was in stable condition. This well share the tank battery with permit number 2-2314. I called the well tender, Jeremy Kohler, at 330-718-6335. I instructed him to build a new dike around the tank battery. |
For data sources see[9]