X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-22789"

m
m
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 1998-09-04
+
| License Date: 1998-03-12
 
|-
 
|-
 
| Spud Date: 1998-03-30
 
| Spud Date: 1998-03-30

Revision as of 07:21, 30 July 2019

Well Details

Well ID: 34-099-22789
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Canfield
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: FLICKINGER/RYMER
License Status: Producing
License Date: 1998-03-12
Spud Date: 1998-03-30
Spud Drilling Contractor: ROSE RUN DRILLING
Final Drill Date: 1998-04-08
Well Total Depth: 6042 ft
Configuration: Directional
Latitude: 41.043966451
Longitude: -80.76201585

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-03-12 Proposed Formations:CLINTON, Issued Date:3/12/98, Expired Date:3/12/99 6:00:00 AM, Drilling unit acres:44.81, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 1998-03-30 RBDMS Rec
Completed 1998-04-08 RBDMS Rec
Reached Total Depth 1998-04-08 RBDMS Rec
Completion Report Received 1998-07-01 RBDMS Rec
Construction Permit Expires 1999-03-12 RBDMS Rec
Correction to Well 1999-04-13 CORRECTION IN FOOTAGE LOCATION AND X & Y COORDS. SURFACE LOC: 75'NL & 350'EL OF LOT 7, DIV 2 (N) - TARGET LOC: 900'NL & 1694'EL OF LOT 7, DIV. 2 (N) (IN LOT 6). SURFACE X COORD: 2,479,375 - SURFACE Y COORD: 506,550. TARFET X COORD: 2,478,046 - TARGET Y COORD: 505,677
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1998-09-04 5744 5878 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 121190 Gal 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1998 EVERFLOW EASTERN PTNS L P 9403 0 91
1999 EVERFLOW EASTERN PTNS L P 27374 170 365
2000 EVERFLOW EASTERN PTNS L P 15758 78 365
2001 EVERFLOW EASTERN PTNS L P 12523 69 365
2002 EVERFLOW EASTERN PTNS L P 9713 0 365
2003 EVERFLOW EASTERN PTNS L P 10719 0 365
2004 EVERFLOW EASTERN PTNS L P 7669 0 365
2005 EVERFLOW EASTERN PTNS L P 6977 0 365
2006 EVERFLOW EASTERN PTNS L P 6077 0 365
2007 EVERFLOW EASTERN PTNS L P 5664 0 365
2008 EVERFLOW EASTERN PTNS L P 6113 0 365
2009 EVERFLOW EASTERN PTNS L P 4036 0 365
2010 EVERFLOW EASTERN PTNS L P 8187 0 365
2011 EVERFLOW EASTERN PTNS L P 7037 0 365
2012 EVERFLOW EASTERN PTNS L P 2715 0 156
2013 EVERFLOW EASTERN PTNS L P 6993 0 365
2014 EVERFLOW EASTERN PTNS L P 4367 0 185
2015 EVERFLOW EASTERN PTNS L P 0 0 0
2016 EVERFLOW EASTERN PTNS L P 275 0 365
2017 EVERFLOW EASTERN PTNS L P 6007 0 365
2018 EVERFLOW EASTERN PTNS L P 5500 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1998 EVERFLOW EASTERN PTNS L P Brine 110 91
1999 EVERFLOW EASTERN PTNS L P Brine 55 365
2000 EVERFLOW EASTERN PTNS L P Brine 35 365
2001 EVERFLOW EASTERN PTNS L P Brine 0 365
2002 EVERFLOW EASTERN PTNS L P Brine 0 365
2003 EVERFLOW EASTERN PTNS L P Brine 0 365
2004 EVERFLOW EASTERN PTNS L P Brine 0 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 0 365
2007 EVERFLOW EASTERN PTNS L P Brine 0 365
2008 EVERFLOW EASTERN PTNS L P Brine 35 365
2009 EVERFLOW EASTERN PTNS L P Brine 15 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 365
2011 EVERFLOW EASTERN PTNS L P Brine 0 365
2012 EVERFLOW EASTERN PTNS L P Brine 0 156
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 185
2015 EVERFLOW EASTERN PTNS L P Brine 0 0
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0453696328 2004-02-11 Production Wells No Violations The tank batteryis shared with permit 2774 and consists of 2-100 bbl storage tanks, 2-separators, a dike and a fence.
0883270156 2012-07-11 Production Wells No Violations I inspected the above location. This is a multi well tank battery which consists of two 100 barrel tanks, two horizontal separators and two consumer meters. The well is a 1.5 plunger lift. ID signs are posted. No violations noted at this time.
1612227324 2012-02-21 Production Wells No Violations On 2/21/2012, DNR Inspector Richard Skidmore completed a production well inspection status check for DNR Inspector Chris Grimm. This well shares a tank battery location with permit number 2-2774. The lease road, well head, and tank battery locations are in compliance with 1501:9-9-05. Inspection passed.
1848511328 2007-05-17 Production Wells No Violations Performed a random inspection. GPSd well and tank battery. Found no violations at this time.
iDIAN00034 1998-11-03 Preliminary Restoration No Violations

For data sources see[9]

References