If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 1: | Line 1: | ||
| + | __TOC__ | ||
== Well Details == | == Well Details == | ||
{| class="wikitable" width="95%" | {| class="wikitable" width="95%" | ||
| Line 23: | Line 24: | ||
|- | |- | ||
|} | |} | ||
| − | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Well ID: 37-021-21179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.692355,"lon":-78.618311,"icon":""}]} |
| Operator Name: DORSO LP | |
| First Permit Date: 2011-04-06 | |
| Last Permit Date: 2011-04-06 | |
| Spud Date: 2011-08-12 | |
| Unconventional: No | |
| Horizontal: No | |
| Violations: 1 | |
| Latitude: 40.692355 | |
| Longitude: -78.618311 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2013-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2012-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1997459 | 2011-08-16 | Violation(s) Noted | Site visit was due to spud notification. Well was currently being drilled.
Site was excessively muddy. No rock was evident at time of inspection. Steep slopes and unlined ditches was causing erosion issues. Mud was in culverts and sediment traps. Mud was being carried from the site and onto the township road. |
618401 |
| 1997459 | 2011-08-16 | Violation(s) Noted | Site visit was due to spud notification. Well was currently being drilled.
Site was excessively muddy. No rock was evident at time of inspection. Steep slopes and unlined ditches was causing erosion issues. Mud was in culverts and sediment traps. Mud was being carried from the site and onto the township road. |
618401 |
| 1997788 | 2011-08-17 | No Violations Noted | Well sign and E&S plan was located along access road. No E&S issues and no IW issues during inspection. First Energy was contracted to install well from Dorso. Tool pusher is Josh Detweler. Conductor pipe consisted of 13 3/8¿ (sanded) to 39 ft. Surface Protection was 7¿ to 928 ft. with 200 sks of Class A 3 % CC ½ flakes with 12 bbls return to surface. Current depth was 2730 ft. Production string (4 ½¿) anticipated depth of 3578 ft. Water recorded at 2¿ at 170 ft. No freeboard issue at the pit. | |
| 2013846 | 2011-10-20 | No Violations Noted | Site visit was follow-up from previous violation inspection on 8-16-11.
Site had been regraded and seeded/mulched. Ditches were still muddy and experiencing some erosion. Sed traps and filter sock were catching most of the sediment. Permanent stabilization techniques (ie rock lined ditches, durable rocked road) should be implemented when permanent restoration takes place. Well head was marked with id number. Well was bubbling at surface. Information was provided to DEP inspector. No violations noted at this time. |