X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-021-21179"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 22:18, 17 June 2014

Well Details

Well ID: 37-021-21179
Loading map...
Operator Name: DORSO LP
First Permit Date: 2011-04-06
Last Permit Date: 2011-04-06
Spud Date: 2011-08-12
Unconventional: No
Horizontal: No
Violations: 1
Latitude: 40.692355
Longitude: -78.618311

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 0.0 0.0 0.0 0.0 0.0
2012-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1997459 2011-08-16 Violation(s) Noted Site visit was due to spud notification. Well was currently being drilled.

Site was excessively muddy. No rock was evident at time of inspection. Steep slopes and unlined ditches was causing erosion issues. Mud was in culverts and sediment traps. Mud was being carried from the site and onto the township road.

618401
1997459 2011-08-16 Violation(s) Noted Site visit was due to spud notification. Well was currently being drilled.

Site was excessively muddy. No rock was evident at time of inspection. Steep slopes and unlined ditches was causing erosion issues. Mud was in culverts and sediment traps. Mud was being carried from the site and onto the township road.

618401
1997788 2011-08-17 No Violations Noted Well sign and E&S plan was located along access road. No E&S issues and no IW issues during inspection. First Energy was contracted to install well from Dorso. Tool pusher is Josh Detweler. Conductor pipe consisted of 13 3/8¿ (sanded) to 39 ft. Surface Protection was 7¿ to 928 ft. with 200 sks of Class A 3 % CC ½ flakes with 12 bbls return to surface. Current depth was 2730 ft. Production string (4 ½¿) anticipated depth of 3578 ft. Water recorded at 2¿ at 170 ft. No freeboard issue at the pit.
2013846 2011-10-20 No Violations Noted Site visit was follow-up from previous violation inspection on 8-16-11.

Site had been regraded and seeded/mulched. Ditches were still muddy and experiencing some erosion. Sed traps and filter sock were catching most of the sediment. Permanent stabilization techniques (ie rock lined ditches, durable rocked road) should be implemented when permanent restoration takes place. Well head was marked with id number. Well was bubbling at surface. Information was provided to DEP inspector. No violations noted at this time.