X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-34933"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-34933
 
| Well ID: 37-063-34933
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.537562, -79.107697 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.537562, -79.107697 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Plugged OG Well
 
| License Status: Plugged OG Well
 
|-
 
|-
| Spud Date: 08/04/2006
+
| Spud Date: 2006-08-04
 
|-
 
|-
| Permit Date: 7/13/2006
+
| Permit Date: 2006-07-13
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 28
 
| style="text-align: right;" | 28
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 74: Line 99:
 
| style="text-align: right;" | 39
 
| style="text-align: right;" | 39
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 83: Line 108:
 
| style="text-align: right;" | 132
 
| style="text-align: right;" | 132
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 92: Line 117:
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 101: Line 126:
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 110: Line 135:
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 119: Line 144:
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 128: Line 153:
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 146: Line 171:
 
| style="text-align: right;" | 37
 
| style="text-align: right;" | 37
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 155: Line 180:
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 197: Line 222:
 
| 1614637
 
| 1614637
 
| Primary Facility
 
| Primary Facility
| 04/06/2007
+
| 2007-04-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 504: Line 529:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 01:39, 1 August 2019

Well Details

Well ID: 37-063-34933
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Center Township
Operator Name: EXOTIC OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: LEASURE 4
License Status: Plugged OG Well
Spud Date: 2006-08-04
Permit Date: 2006-07-13
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.537562
Longitude: -79.107697

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 EXOTIC OIL & GAS LLC 58.00 28 0.00 0 0.00 0
2007 EXOTIC OIL & GAS LLC 125.00 39 0.00 0 0.00 0
2008 CHRISTINE MARIE EXPLORATION LP 333.00 132 0.00 0 0.00 0
2009 CHRISTINE MARIE EXPLORATION LP 59.00 16 0.00 0 0.00 0
2010 CHRISTINE MARIE EXPLORATION LP 38.00 16 0.00 0 0.00 0
2011 CHRISTINE MARIE EXPLORATION LP 14.00 5 0.00 0 0.00 0
2012 CHRISTINE MARIE EXPLORATION LP 2.00 1 0.00 0 0.00 0
2013 EXOTIC OIL & GAS LLC 30.00 3 0.00 0 0.00 0
2014 0.00 0 0.00 0 0.00 0
2015 EXOTIC OIL & GAS LLC 5.00 37 0.00 0 0.00 0
2016 EXOTIC OIL & GAS LLC 23.00 3 0.00 0 0.00 0
2017 0.00 0 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1614637 Primary Facility 2007-04-06 Routine/Complete Inspection No Violations Noted E&S OK.
2580041 Primary Facility 2017-04-05 Routine/Complete Inspection Violation(s) Noted At time of inspection, well appears plugged with an erected monument.

Violations are being issued for failure to have an E&S plan on-site for all stages of an earth disturbance activity and for failure to design, implement, and maintain E&S BMPs to minimize the potential for accelerated erosion and sedimentation.

2586244 Primary Facility 2017-04-21 Administrative/File Review Outstanding Violations - Viols Req'd At 1521, the Department contacted Operator representative Mark Gawel in response to a voicemail left for the Department by Mr. Gawel.

Mr. Gawel called to seek guidance on how to reach compliance and correct violations previously issued under inspection record 2580041 (enf ID 352419).

The Department explained that an E&S plan is to be available at the well site during all stages of an earth disturbance activity and that E&S BMPs shall be installed in accordance with this E&S plan.

Mr. Gawel stated that an E&S plan will be made available at the well site and temporary E&S BMPs will be installed as appropriate. Mr. Gawel will keep the Department updated.

Violations remain outstanding at this time.

2590163 Primary Facility 2017-05-03 Administrative/File Review In Compliance with Policy Admin inspection in response to violations issued under inspection record 2580041 (enf ID 352419) for failure to have a copy of the E&S plan available at the project site during all stages of an earth disturbance activity and for failure to implement and maintain E&S BMPs to minimize the potential for accelerated erosion and sedimentation.

At 1517, operator representative Mark Gawel provided the Department with the requested NOV response via e-mail.

2592862 Primary Facility 2017-05-08 Compliance Evaluation No Violations Noted On-site CEI conducted in response to violations previously issued under inspection record 2580041 (enf ID 352419) for failure to have an E&S plan on site for all stages of an earth disturbance activity and for failure to implement E&S BMPs to minimize the potential for accelerated erosion and sedimentation.

At time of inspection, E&S plan on-site. Temporary E&S BMPs installed per the E&S plan. Site temporarily stabilized with mulch. No accelerated erosion and sedimentation issues observed at this time.

Utilizing a range-finder, it appears that an approximate area of 33,750 square feet was previously disturbed. This area does not include any earth disturbance that occurred on the access road.

Violations previously issued under inspection record 2580041 (enf ID 352419) have been corrected. No new violations noted at this time.

2594000 Primary Facility 2017-05-05 Administrative/File Review In Compliance with Policy Admin inspection in response to inspection record 2580041 (enf ID 352419) for failure to have an E&S plan on site for all stages of an earth disturbance activity and for failure to implement E&S BMPs to minimize the potential for accelerated erosion and sedimentation.

Operator representative Mark Gawel notified the Department via e-mail that the E&S plan is on-site and that temporary E&S controls have been implemented.

2594062 Primary Facility 2017-05-05 Administrative/File Review In Compliance with Policy Admin inspection in response to inspection record 2580041 (enf ID 352419) for failure to have an E&S plan on site for all stages of an earth disturbance activity and for failure to implement E&S BMPs to minimize the potential for accelerated erosion and sedimentation.

Requested NOV response received by Department on 5/5/2017.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2580041 782718 2017-04-05 2017-05-08 102.4(b)8 Administrative During this inspection, the Department was unable to locate an on-site E&S plan.
2580041 782719 2017-04-05 2017-05-08 78.53 Environmental Health & Safety Site, including access road, appears to have been recently re-graded and is temporarily stabilized with mulch. There do not appear to be any installed temporary BMPs during this inspection.
2580041 782720 2017-04-05 2017-05-08 102.4(b)1 Environmental Health & Safety Site, including access road, appears to have been recently re-graded and is temporarily stabilized with mulch. There do not appear to be any installed temporary BMPs during this inspection.
2580041 782721 2017-04-05 2017-05-08 102.11(a)1 Environmental Health & Safety Site, including access road, appears to have been recently re-graded and is temporarily stabilized with mulch. There do not appear to be any installed temporary BMPs during this inspection.
2586244 784152 2017-04-21 2017-05-08 102.4(b)8 Administrative As discussed with Mr. Gawel, the E&S plan shall be available for review by the Department for all stages of an earth disturbance activity. During the Department's previous inspections, the E&S plan was unable to be located by the Department.
2586244 784153 2017-04-21 2017-05-08 78.53 Environmental Health & Safety As discussed with Mr. Gawel, the E&S plan shall be available for review by the Department for all stages of the earth disturbance activity and the E&S BMPs shall be installed in accordance with the on-site E&S plan. During the Department's previous inspections, the E&S plan was unable to be located
2586244 784154 2017-04-21 2017-05-08 102.4(b)1 Environmental Health & Safety As discussed with Mr. Gawel, E&S BMPs shall be implemented in accordance with the on-site E&S plan. No E&S BMPs appeared to be installed during the Department's previous inspections.
2586244 784155 2017-04-21 2017-05-08 102.11(a)1 Environmental Health & Safety As discussed with Mr. Gawel, E&S BMPs shall be implemented in accordance with the on-site E&S plan. No E&S BMPs appeared to be installed during the Department's previous inspections.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
782718 352419 NOV - Notice of Violation 2017-12-22
782718 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
782719 352419 NOV - Notice of Violation 2017-12-22
782719 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
782720 352419 NOV - Notice of Violation 2017-12-22
782720 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
782721 352419 NOV - Notice of Violation 2017-12-22
782721 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
784152 352419 NOV - Notice of Violation 2017-12-22
784152 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
784153 352419 NOV - Notice of Violation 2017-12-22
784153 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
784154 352419 NOV - Notice of Violation 2017-12-22
784154 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00
784155 352419 NOV - Notice of Violation 2017-12-22
784155 360430 CACP - Consent Assessment of Civil Penalty 2017-12-22 $17,000.00 $17,000.00

For data sources see[5]

References