X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24223"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24223
 
| Well ID: 37-051-24223
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.876391, -79.821614 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.876391, -79.821614 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/06/2009
+
| Spud Date: 2009-07-06
 
|-
 
|-
| Permit Date: 5/28/2009
+
| Permit Date: 2009-05-28
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 128: Line 153:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 196: Line 221:
 
| 1813702
 
| 1813702
 
| Primary Facility
 
| Primary Facility
| 07/14/2009
+
| 2009-07-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 203: Line 228:
 
| 1813885
 
| 1813885
 
| Primary Facility
 
| Primary Facility
| 07/10/2009
+
| 2009-07-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 210: Line 235:
 
| 1823757
 
| 1823757
 
| Primary Facility
 
| Primary Facility
| 08/20/2009
+
| 2009-08-20
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 217: Line 242:
 
| 1851432
 
| 1851432
 
| Primary Facility
 
| Primary Facility
| 10/08/2009
+
| 2009-10-08
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 236: Line 261:
 
| 567224
 
| 567224
 
| 07/14/2009
 
| 07/14/2009
| 10/08/2009
+
| 2009-07-14
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 258: Line 283:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 10/08/2009
+
| 2009-10-08
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 266: Line 291:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/03/2010
+
| 2010-11-03
| 11/03/2010
+
| 2010-11-03
 
| style="text-align: right;" | $7,250.00
 
| style="text-align: right;" | $7,250.00
 
| style="text-align: right;" | $7,250.00
 
| style="text-align: right;" | $7,250.00
Line 278: Line 303:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 04:35, 2 August 2019

Well Details

Well ID: 37-051-24223
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: German Township
Operator Name: OIL & GAS MGMT INC
Well Pad ID:
Farm/Lease Name: GUZIK 1
License Status: Active
Spud Date: 2009-07-06
Permit Date: 2009-05-28
Unconventional Well: N
Configuration: Vertical Well
Latitude: 39.876391
Longitude: -79.821614

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 OIL & GAS MGMT INC 25,666.00 365 0.00 0 0.00 0
2011 OIL & GAS MGMT INC 20,361.00 365 0.00 0 0.00 0
2012 OIL & GAS MGMT INC 14,247.00 366 0.00 0 0.00 0
2014 OIL & GAS MGMT INC 8,519.00 365 0.00 0 0.00 0
2015 OIL & GAS MGMT INC 6,939.00 365 0.00 0 0.00 0
2016 OIL & GAS MGMT INC 6,209.00 365 0.00 0 0.00 0
2017 OIL & GAS MGMT INC 5,760.00 365 0.00 0 0.00 0
2018 OIL & GAS MGMT INC 5,770.00 335 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-A00 Produced Fluid (in Barrels) 35.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-A00 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-A00 Produced Fluid (in Barrels) 33.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2014-A00 Produced Fluid (in Barrels) 35.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016-A00 Produced Fluid (in Barrels) RWC 802 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1813702 Primary Facility 2009-07-14 Routine/Complete Inspection Violation(s) Noted Failure to implement the E&S plan. Sediment was transported off the well site.
1813885 Primary Facility 2009-07-10 Drilling/Alteration No Violations Noted No silt fence, no 12" culverts at access road, frac tank was raised up with dozer to allow all fluids (fresh water according to the driller) to be drained down over the bank and off location. E&S CONTROLS AND DISCHARGE issues were turned over to water quality for further review. Operator failed to allow the cement to set for a minimum of 8 hours prior to the resumption of actual drilling. 78.85.Cement Standards. Driller's log book was barely legible. Cement paperwork was not available on site.
1823757 Primary Facility 2009-08-20 Compliance Evaluation Outstanding Violations - No Viols Req'd
1851432 Primary Facility 2009-10-08 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1813702 567224 07/14/2009 2009-07-14 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Failure to implement the E&S plan. Sediment was transported off the well site.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
567224 248054 NOV - Notice of Violation Comply/Closed 2009-10-08
567224 263909 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-03 2010-11-03 $7,250.00 $7,250.00

For data sources see[6]

References