If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 9: | Line 9: | ||
| State: Ohio | | State: Ohio | ||
|- | |- | ||
− | | County: | + | | County: <County> |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Wooster City,_Wayne_County,_Ohio|Wooster City]] |
|- | |- | ||
| Operator Name: [[DERBY OPERATING CORP]] | | Operator Name: [[DERBY OPERATING CORP]] |
Well ID: 34-169-24377 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.830563314,"lon":-81.89887239,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: Wooster City | |
Operator Name: DERBY OPERATING CORP | |
Well Pad ID: | |
Farm/Lease Name: ROY VILLAGE INC | |
License Status: Producing | |
License Date: 1986-03-07 | |
Spud Date: 1986-03-12 | |
Spud Drilling Contractor: | |
Final Drill Date: 1986-03-16 | |
Well Total Depth: 3643 ft | |
Configuration: Vertical | |
Latitude: 40.830563314 | |
Longitude: -81.89887239 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1986-03-07 | 677 WALLICK PETROLEUM CO GeoDate 3/7/86 |
Oil and Gas | 1986-03-07 | Issued Date 3/7/86 Expired Date 3/7/87 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03643 Proposed Drill Depth 03643 |
Original Spud | 1986-03-12 | |
Completed | 1986-03-16 | |
Reached Total Depth | 1986-03-16 | |
Completion Report Received | 1986-04-17 | |
Construction Permit Expires | 1987-03-07 | |
CO | 1996-03-07 | 2165 PETRO QUEST INC GeoDate 3/7/86 |
Change of Owner | 2008-01-04 | Operator changed from 2165, PETRO QUEST INC to 0169, SMAIL JAMES R INC |
Change of Owner | 2015-05-21 | Operator changed from 169, SMAIL JAMES R INC to 2892, DERBY OPERATING CORP |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3464 | 3514 | 23 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 0 | 20 Lbs | 40000 | |||
N2 | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | WALLICK PETROLEUM CO | 3258 | 69 | 365 |
1990 | WALLICK PETROLEUM CO | 1219 | 0 | 365 |
1991 | WALLICK PETROLEUM CO | 5305 | 0 | 365 |
1992 | WALLICK PETROLEUM CO | 1384 | 70 | 365 |
1993 | WALLICK PETROLEUM CO | 1318 | 0 | 365 |
1994 | WALLICK PETROLEUM CO | 2124 | 0 | 365 |
1995 | PETRO QUEST INC | 98 | 0 | 30 |
1997 | PETRO QUEST INC | 1047 | 0 | 365 |
1998 | PETRO QUEST INC | 796 | 0 | 365 |
1999 | PETRO QUEST INC | 752 | 56 | 365 |
2000 | PETRO QUEST INC | 450 | 0 | 365 |
2001 | PETRO QUEST INC | 460 | 0 | 365 |
2002 | PETRO QUEST INC | 323 | 0 | 365 |
2003 | PETRO QUEST INC | 371 | 0 | 365 |
2004 | PETRO QUEST INC | 252 | 59 | 365 |
2005 | PETRO QUEST INC | 229 | 0 | 365 |
2006 | PETRO QUEST INC | 114 | 0 | 365 |
2007 | PETRO QUEST INC | 350 | 23 | 365 |
2009 | JAMES R SMAIL INC | 363 | 0 | 0 |
2010 | JAMES R SMAIL INC | 333 | 0 | 365 |
2011 | JAMES R SMAIL INC | 279 | 0 | 365 |
2012 | JAMES R SMAIL INC | 345 | 0 | 366 |
2013 | JAMES R SMAIL INC | 348 | 0 | 365 |
2014 | JAMES R SMAIL INC | 281 | 0 | 365 |
2015 | JAMES R SMAIL INC | 112 | 14 | 120 |
2016 | DERBY OPERATING CORP | 830 | 32 | 365 |
2017 | DERBY OPERATING CORP | 591 | 0 | 365 |
2018 | DERBY OPERATING CORP | 712 | 24 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | WALLICK PETROLEUM CO | Brine | 10 | 365 |
1990 | WALLICK PETROLEUM CO | Brine | 0 | 365 |
1991 | WALLICK PETROLEUM CO | Brine | 63 | 365 |
1992 | WALLICK PETROLEUM CO | Brine | 0 | 365 |
1993 | WALLICK PETROLEUM CO | Brine | 0 | 365 |
1994 | WALLICK PETROLEUM CO | Brine | 30 | 365 |
1995 | PETRO QUEST INC | Brine | 52 | 30 |
1997 | PETRO QUEST INC | Brine | 0 | 365 |
1998 | PETRO QUEST INC | Brine | 0 | 365 |
1999 | PETRO QUEST INC | Brine | 60 | 365 |
2000 | PETRO QUEST INC | Brine | 0 | 365 |
2001 | PETRO QUEST INC | Brine | 0 | 365 |
2002 | PETRO QUEST INC | Brine | 0 | 365 |
2003 | PETRO QUEST INC | Brine | 0 | 365 |
2004 | PETRO QUEST INC | Brine | 0 | 365 |
2005 | PETRO QUEST INC | Brine | 0 | 365 |
2006 | PETRO QUEST INC | Brine | 0 | 365 |
2007 | PETRO QUEST INC | Brine | 0 | 365 |
2009 | JAMES R SMAIL INC | Brine | 0 | 0 |
2010 | JAMES R SMAIL INC | Brine | 0 | 365 |
2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
2012 | JAMES R SMAIL INC | Brine | 0 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
2015 | DERBY OPERATING CORP | Brine | 0 | 234 |
2016 | DERBY OPERATING CORP | Brine | 0 | 365 |
2017 | DERBY OPERATING CORP | Brine | 0 | 365 |
2018 | DERBY OPERATING CORP | Brine | 13 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
00000PL337 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0019781900 | 2016-06-09 | Production Wells | No Violations | Inspected production well on 06/09/2016. The tank battery consists of 1-50 bbl steel tank and 1-vertical separator, located within an earthen dike. The diked area is located within an unlocked metal fence. Well identification is clearly displayed at the tank battery. The well is a rabbit well, located within an unlocked metal fence. No problems were noted at the time of the inspection. |
1396506562 | 2016-10-24 | Production Wells | No Violations | Inspected production well on 10/24/2016. The tank battery consists of 1-50 bbl steel tank and 1-vertical separator, located within an earthen dike; the diked area is located within an unlocked metal fence. Well identification is clearly displayed at the tank battery. The well is a rabbit well, located within an unlocked metal fence. No problems were noted at the time of the inspection. |
1452576795 | 2017-06-27 | Production Wells | No Violations | Inspected production well on 06/27/2017. The tank battery consists of 1-50 bbl steel tank, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike; the diked area is located within an unlocked metal fence. Well identification is clearly displayed at the tank battery. The well is a rabbit well, located within an unlocked metal fence. No problems were noted at the time of the inspection. |
2113786789 | 2018-08-01 | Production Wells | No Violations | Inspected production well on 08/01/2018. The tank battery consists of 1-50 bbl steel tank, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike; the diked area is located within an unlocked metal fence. Well identification is clearly displayed at the tank battery. The well is a rabbit well, located within an unlocked metal fence. No problems were noted at the time of the inspection. |
For data sources see[9]