X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30127"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30127
 
| Well ID: 37-005-30127
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.881370, -79.242939 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.881370, -79.242939 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 05/21/2009
+
| Spud Date: 2009-05-21
 
|-
 
|-
| Permit Date: 12/11/2008
+
| Permit Date: 2008-12-11
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 65
 
| style="text-align: right;" | 65
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 74: Line 99:
 
| style="text-align: right;" | 308
 
| style="text-align: right;" | 308
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 83: Line 108:
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 92: Line 117:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 101: Line 126:
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 119: Line 144:
 
| style="text-align: right;" | 363
 
| style="text-align: right;" | 363
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 128: Line 153:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 137: Line 162:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 146: Line 171:
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 160: Line 185:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 165: Line 191:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010
 +
| [[BLX INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 171: Line 198:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[BLX INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 177: Line 205:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[BLX INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 183: Line 212:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[BLX INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
Line 208: Line 238:
 
| 1798847
 
| 1798847
 
| Primary Facility
 
| Primary Facility
| 05/06/2009
+
| 2009-05-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 215: Line 245:
 
| 1801978
 
| 1801978
 
| Primary Facility
 
| Primary Facility
| 05/28/2009
+
| 2009-05-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 222: Line 252:
 
| 1801980
 
| 1801980
 
| Primary Facility
 
| Primary Facility
| 06/01/2009
+
| 2009-06-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 229: Line 259:
 
| 1803646
 
| 1803646
 
| Primary Facility
 
| Primary Facility
| 05/06/2009
+
| 2009-05-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 236: Line 266:
 
| 1804485
 
| 1804485
 
| Primary Facility
 
| Primary Facility
| 05/21/2009
+
| 2009-05-21
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 243: Line 273:
 
| 1804492
 
| 1804492
 
| Primary Facility
 
| Primary Facility
| 06/01/2009
+
| 2009-06-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 250: Line 280:
 
| 1804504
 
| 1804504
 
| Primary Facility
 
| Primary Facility
| 05/27/2009
+
| 2009-05-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 287:
 
| 2146346
 
| 2146346
 
| Primary Facility
 
| Primary Facility
| 03/08/2013
+
| 2013-03-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 292: Line 322:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 05:02, 20 August 2019

Well Details

Well ID: 37-005-30127
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Dayton Borough
Operator Name: BLX INC
Well Pad ID:
Farm/Lease Name: DAYTON UNITED METHOD CHURCH 1
License Status: Active
Spud Date: 2009-05-21
Permit Date: 2008-12-11
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.881370
Longitude: -79.242939

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 BLX INC 1,104.00 65 0.00 0 0.00 0
2010 BLX INC 7,090.00 308 0.00 0 0.00 0
2011 BLX INC 5,419.00 364 0.00 0 0.00 0
2012 BLX INC 3,978.00 366 0.00 0 0.00 0
2013 BLX INC 2,936.00 359 0.00 0 0.00 0
2014 BLX INC 2,931.00 365 0.00 0 0.00 0
2015 BLX INC 2,501.00 363 0.00 0 0.00 0
2016 BLX INC 2,548.00 366 0.00 0 0.00 0
2017 BLX INC 1,541.00 334 0.00 0 0.00 0
2018 BLX INC 2,199.00 354 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 BLX INC Produced Fluid (in Barrels) 70.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 BLX INC Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 BLX INC Produced Fluid (in Barrels) 70.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 BLX INC Produced Fluid (in Barrels) 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1798847 Primary Facility 2009-05-06 Drilling/Alteration No Violations Noted on-site meeting with operator to dicuss drill plan/site made - E&S ok/ID&pit ok
1801978 Primary Facility 2009-05-28 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Tool pusher informed WQS Higgins that drilling would not occur during the weekend and that they planned to hit the targeted formation on Monday morning.
1801980 Primary Facility 2009-06-01 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit had more than the two feet of required freeboard. Met onsite with David Miller of BLX, Inc. and David Bittinger of Bittinger drilling and discussed the possibility of solidifcation of the drill cuttings. Informed them that Mr. Mike Morgart, Hydrogeologist would review and approve the alternative waste management practice of solidification and that a copy of the forms to be filled out would be faxed to Mr. Bittinger.
1803646 Primary Facility 2009-05-06 Drilling/Alteration No Violations Noted site prepared, proper e/s in place.
1804485 Primary Facility 2009-05-21 Drilling/Alteration No Violations Noted drilling commenced - @ 16ft/E&S ok/ID&pit ok
1804492 Primary Facility 2009-06-01 Drilling/Alteration No Violations Noted drilling @ 3000ft - gas flow 3MCF/E&S ok/ID&pit ok
1804504 Primary Facility 2009-05-27 Drilling/Alteration No Violations Noted drilling @ 650ft/ID&pit ok/E&S ok
2146346 Primary Facility 2013-03-08 Routine/Complete Inspection No Violations Noted Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well is located in a parking lot for the Dayton United Methodist Church.

For data sources see[6]

References