If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 90: | Line 90: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity |
Well ID: 37-081-21669 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.329311,"lon":-76.826897,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Upper Fairfield Township | |
Operator Name: INFLECTION ENERGY (PA) LLC | |
Well Pad ID: | |
Farm/Lease Name: EICHENLAUB P2 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-05-04 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.329311 | |
Longitude: -76.826897 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2598690 | Primary Facility | 2017-05-24 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 5/24/2017.
I entered the site at 08:56 to evaluate a dewatering plan for the fresh water impoundment onsite. The plan calls for dewatering the impoundment using a pump and sprinkler onto the slope between the fresh water impoundment and the sedimentation basin. Overall, the dewatering plan describes how the operator will maintain compliance during the discharge of fresh water. The Department acknowledges receipt of the Freshwater Impoundment Dewatering Plan for the Eichenlaub B Well Site.No Violations Noted. |
For data sources see[4]