X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-035-21900"

m
m
Line 11: Line 11:
 
| County: [[Cuyahoga_County,_Ohio|Cuyahoga]]
 
| County: [[Cuyahoga_County,_Ohio|Cuyahoga]]
 
|-
 
|-
| Municipality: [[Cuyahoga Heights Village,_Cuyahoga_County,_Ohio|Cuyahoga Heights Village]]
+
| Municipality: [[Cuyahoga Heights,_Cuyahoga_County,_Ohio|Cuyahoga Heights]]
 
|-
 
|-
 
| Operator Name: [[M & M ROYALTY LTD]]
 
| Operator Name: [[M & M ROYALTY LTD]]
Line 33: Line 33:
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: <Latitude>
+
| Latitude: 41.431421439
 
|-
 
|-
 
| Longitude: -81.64709742
 
| Longitude: -81.64709742

Revision as of 20:25, 30 August 2019

Well Details

Well ID: 34-035-21900
Loading map...
Country: United States
State: Ohio
County: Cuyahoga
Municipality: Cuyahoga Heights
Operator Name: M & M ROYALTY LTD
Well Pad ID:
Farm/Lease Name: CUYAHOGA HEIGHTS BOE
License Status: Cancelled
License Date: 2006-04-18
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 41.431421439
Longitude: -81.64709742

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-04-18 Proposed Formations:CLINTON, Issued Date:4/18/2006, Expired Date:4/18/2007 6:00:00 AM, Drilling unit acres:28.9, Proposed Well Type:OG, Proposed Well Class:POOL
Construction Permit Expires 2007-04-18 CANCELLED PER OWNER REQUEST.
Record Last Modified 2016-08-23 CANCELLED PER OWNER REQUEST.

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0748784299 2006-07-06 Drill / Deepen / Reopen No Violations drilling 3500 no problems.

This well was never drilled it should be P# 1902

2088704806 2006-06-16 Drill / Deepen / Reopen No Violations status waiting on cement set time. To start drilling

This well was never drilled.

For data sources see[3]

References