X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-21252"

m
m
Line 11: Line 11:
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Municipality: [[Washington Township,_Belmont_County,_Ohio|Washington Township]]
+
| Municipality: [[Washington_Township,_Belmont_County,_Ohio|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]

Revision as of 18:24, 31 August 2019

Well Details

Well ID: 34-013-21252
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID: US-OH-001520
Farm/Lease Name: HORSESHOE 210704
License Status: Well Drilled
License Date: 2018-04-11
Spud Date: 2017-12-21
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-05-28
Well Total Depth: 24672 ft
Configuration: Horizontal
Latitude: 39.906739428
Longitude: -80.93010030

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-05-25 Proposed Formations:TRENTON, Issued Date:5/25/2017, Expired Date:5/25/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-04-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/11/2018, Expired Date:4/10/2020 12:00:00 PM, Drilling unit acres:673.838, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-05-28
Record Last Modified 2018-09-28
Construction Permit Expires 2020-04-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0637172635 2019-04-11 Completion Testing No Violations
1156568041 2018-07-31 Completion Testing No Violations Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. The drilling rig mouse hole has been filled with cement.

For data sources see[3]

References