X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "31-013-20810"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 31-013-20810
 
| Well ID: 31-013-20810
| style="height=100%; align=center" rowspan="15" | {{#display_map: 42.28158, -79.30705 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 42.281579999, -79.30705000 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Chautauqua County, New York|Chautauqua]]
+
| Well Name: Stearns Unit 1
 
|-
 
|-
| Municipality:  
+
| Country: United States
 
|-
 
|-
| Operator Name: [[Shelex Drilling, Inc.]]
+
| State: New York
 
|-
 
|-
| Well Pad ID:  
+
| County: [[Chautauqua_County,_New_York|Chautauqua]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Municipality: [[Stockton,_Chautauqua_County,_New_York|Stockton]]
 
|-
 
|-
| First Permit Date: 1987-02-10
+
| Operator Name:  
 
|-
 
|-
| Last Permit Date: 1987-02-10
+
| Well Status: Active
 
|-
 
|-
 
| Spud Date: 1987-10-05
 
| Spud Date: 1987-10-05
 
|-
 
|-
| Unconventional: No
+
| Permit Date: 1987-02-10
 +
|-
 +
| Well Completion Date: 1988-10-20
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Active
+
| Measured Well Depth (ft): 3408
 +
|-
 +
| Latitude: 42.281579999
 +
|-
 +
| Longitude: -79.30705000
 +
|}
 +
For data sources see<ref name="well">{{cite web
 +
| title = Public Wells Data
 +
|publisher = New York State Department of Environmental Conservation
 +
| date = 2019-08-09
 +
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-08-09 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Fluid Type
 +
!scope="col" | Fluid Quantity
 +
!scope="col" | Fluid Production Time
 +
|-
 +
| 1987
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 0 Mcf
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1988
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 0 Mcf
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1990
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 4659 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1991
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 3276 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1992
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 0 Mcf
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1993
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1216 Mcf
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 1994
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 45 Mcf
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1995
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 6 Mcf
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1996
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 0 Mcf
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1997
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 200 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1998
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 200 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1999
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2761 Mcf
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 2000
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 3289 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 165 Mcf
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1908 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2003
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2604 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2004
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1139 Mcf
 +
| style="text-align: right;" | 8 Months
 +
|-
 +
| 2005
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2437 Mcf
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1665 Mcf
 +
| style="text-align: right;" | 5 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 5 Months
 +
|-
 +
| 2007
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 3900 Mcf
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2008
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 3463 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2936 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1467 Mcf
 +
| style="text-align: right;" | 9 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 9 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 2285 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1300 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 845 Mcf
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 394 Mcf
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 505 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1563 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 1307 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| GAS
 +
| style="text-align: right;" | 988 Mcf
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| OIL
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
|}
 +
For data sources see<ref name = "prod">{{cite web
 +
| title =New York Natural Gas and Oil Production
 +
|publisher = New York State Department of Environmental Conservation
 +
| date = 2019-07-01
 +
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-08-07 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Time Produced
 +
|-
 +
| 1987
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1988
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1990
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 33 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1991
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1992
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1993
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 1994
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1995
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 2 Months
 +
|-
 +
| 1996
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 0 Months
 +
|-
 +
| 1997
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1998
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 1999
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 6 Months
 +
|-
 +
| 2000
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 75 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2001
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 4 Months
 +
|-
 +
| 2002
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2005
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2006
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 5 Months
 +
|-
 +
| 2007
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 100 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2008
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2009
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 +
|-
 +
| 2010
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 9 Months
 +
|-
 +
| 2011
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 107 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2012
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 10 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2013
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 10 Bbl
 +
| style="text-align: right;" | 11 Months
 +
|-
 +
| 2014
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 10 Months
 +
|-
 +
| 2015
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 5 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
| Violations: 0
+
| 2016
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
| Latitude: 42.28158
+
| 2017
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
| Longitude: -79.30705
+
| 2018
 +
| [[Shelex Drilling Inc.]]
 +
| WATER
 +
| style="text-align: right;" | 0 Bbl
 +
| style="text-align: right;" | 12 Months
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref name="prod" />
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Event Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event Description
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
|  
+
| 1987-02-10
| style="text-align:right;" | 845.0
+
| New Permit Issued.
|
 
|  
 
|
 
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name="well" />
| title = New York State Department of Environmental Conservation
+
==References==
| publisher = [http://www.dec.ny.gov/cfmx/extapps/GasOil/search/production/index.cfm]
+
<references/>
| date = 2015-07-07
 
| url = http://wellwiki.org/wiki/New_York_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-07-07 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:New York Wells]]

Revision as of 21:45, 4 September 2019

Well Details

Well ID: 31-013-20810
Loading map...
Well Name: Stearns Unit 1
Country: United States
State: New York
County: Chautauqua
Municipality: Stockton
Operator Name:
Well Status: Active
Spud Date: 1987-10-05
Permit Date: 1987-02-10
Well Completion Date: 1988-10-20
Configuration: Vertical
Measured Well Depth (ft): 3408
Latitude: 42.281579999
Longitude: -79.30705000

For data sources see[1]

Production Data

Period Operator Name Fluid Type Fluid Quantity Fluid Production Time
1987 Shelex Drilling Inc. GAS 0 Mcf 0 Months
1988 Shelex Drilling Inc. GAS 0 Mcf 0 Months
1990 Shelex Drilling Inc. GAS 4659 Mcf 12 Months
1991 Shelex Drilling Inc. GAS 3276 Mcf 12 Months
1992 Shelex Drilling Inc. GAS 0 Mcf 0 Months
1993 Shelex Drilling Inc. GAS 1216 Mcf 4 Months
1994 Shelex Drilling Inc. GAS 45 Mcf 2 Months
1995 Shelex Drilling Inc. GAS 6 Mcf 2 Months
1996 Shelex Drilling Inc. GAS 0 Mcf 0 Months
1997 Shelex Drilling Inc. GAS 200 Mcf 12 Months
1998 Shelex Drilling Inc. GAS 200 Mcf 12 Months
1999 Shelex Drilling Inc. GAS 2761 Mcf 6 Months
2000 Shelex Drilling Inc. GAS 3289 Mcf 12 Months
2001 Shelex Drilling Inc. GAS 165 Mcf 4 Months
2001 Shelex Drilling Inc. OIL 0 Bbl 4 Months
2002 Shelex Drilling Inc. GAS 1908 Mcf 12 Months
2002 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2003 Shelex Drilling Inc. GAS 2604 Mcf 12 Months
2004 Shelex Drilling Inc. GAS 1139 Mcf 8 Months
2005 Shelex Drilling Inc. GAS 2437 Mcf 10 Months
2006 Shelex Drilling Inc. GAS 1665 Mcf 5 Months
2006 Shelex Drilling Inc. OIL 0 Bbl 5 Months
2007 Shelex Drilling Inc. GAS 3900 Mcf 10 Months
2008 Shelex Drilling Inc. GAS 3463 Mcf 11 Months
2009 Shelex Drilling Inc. GAS 2936 Mcf 12 Months
2009 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2010 Shelex Drilling Inc. GAS 1467 Mcf 9 Months
2010 Shelex Drilling Inc. OIL 0 Bbl 9 Months
2011 Shelex Drilling Inc. GAS 2285 Mcf 11 Months
2011 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2012 Shelex Drilling Inc. GAS 1300 Mcf 11 Months
2012 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2013 Shelex Drilling Inc. GAS 845 Mcf 11 Months
2013 Shelex Drilling Inc. OIL 0 Bbl 11 Months
2014 Shelex Drilling Inc. GAS 394 Mcf 10 Months
2014 Shelex Drilling Inc. OIL 0 Bbl 10 Months
2015 Shelex Drilling Inc. GAS 505 Mcf 12 Months
2015 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2016 Shelex Drilling Inc. GAS 1563 Mcf 12 Months
2016 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2017 Shelex Drilling Inc. GAS 1307 Mcf 12 Months
2017 Shelex Drilling Inc. OIL 0 Bbl 12 Months
2018 Shelex Drilling Inc. GAS 988 Mcf 12 Months
2018 Shelex Drilling Inc. OIL 0 Bbl 12 Months

For data sources see[2]

Waste Data

Period Operator Waste Type Quantity Time Produced
1987 Shelex Drilling Inc. WATER 0 Bbl 0 Months
1988 Shelex Drilling Inc. WATER 0 Bbl 0 Months
1990 Shelex Drilling Inc. WATER 33 Bbl 12 Months
1991 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1992 Shelex Drilling Inc. WATER 0 Bbl 0 Months
1993 Shelex Drilling Inc. WATER 0 Bbl 4 Months
1994 Shelex Drilling Inc. WATER 0 Bbl 2 Months
1995 Shelex Drilling Inc. WATER 0 Bbl 2 Months
1996 Shelex Drilling Inc. WATER 0 Bbl 0 Months
1997 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1998 Shelex Drilling Inc. WATER 0 Bbl 12 Months
1999 Shelex Drilling Inc. WATER 0 Bbl 6 Months
2000 Shelex Drilling Inc. WATER 75 Bbl 12 Months
2001 Shelex Drilling Inc. WATER 0 Bbl 4 Months
2002 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2005 Shelex Drilling Inc. WATER 0 Bbl 10 Months
2006 Shelex Drilling Inc. WATER 0 Bbl 5 Months
2007 Shelex Drilling Inc. WATER 100 Bbl 10 Months
2008 Shelex Drilling Inc. WATER 0 Bbl 11 Months
2009 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2010 Shelex Drilling Inc. WATER 0 Bbl 9 Months
2011 Shelex Drilling Inc. WATER 107 Bbl 11 Months
2012 Shelex Drilling Inc. WATER 10 Bbl 11 Months
2013 Shelex Drilling Inc. WATER 10 Bbl 11 Months
2014 Shelex Drilling Inc. WATER 5 Bbl 10 Months
2015 Shelex Drilling Inc. WATER 5 Bbl 12 Months
2016 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2017 Shelex Drilling Inc. WATER 0 Bbl 12 Months
2018 Shelex Drilling Inc. WATER 0 Bbl 12 Months

For data sources see[2]

Well History

Event Date Event Description
1987-02-10 New Permit Issued.

For data sources see[1]

References

  1. 1.0 1.1 "Public Wells Data". New York State Department of Environmental Conservation. 2019-08-09. Retrieved 2019-08-09. 
  2. 2.0 2.1 "New York Natural Gas and Oil Production". New York State Department of Environmental Conservation. 2019-07-01. Retrieved 2019-08-07.