X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-29960"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-29960
 
| Well ID: 37-053-29960
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.564892, -79.465489 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.564892, -79.465489 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: MILFORD 6
 
| Farm/Lease Name: MILFORD 6
 
|-
 
|-
| License Status: Regulatory Inactive Status
+
| License Status:  
 
|-
 
|-
| Spud Date: 04/15/2011
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 1/25/2011
+
| Permit Date: 2011-01-25
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.564892
 
| Latitude: 41.564892
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-01-25
 +
| New Permit Application
 +
|-
 +
| 2011-04-15
 +
| Performed Spud Operation
 +
|-
 +
| 2011-04-20
 +
| Drilling Completion
 +
|-
 +
| 2011-05-03
 +
| Perforation
 +
|-
 +
| 2011-10-20
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 129:
 
| [[COUGAR ENERGY INC]]
 
| [[COUGAR ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 402.80
 
| style="text-align: right;" | 402.80
 
| style="text-align: right;" | 250
 
| style="text-align: right;" | 250
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[COUGAR ENERGY INC]]
 
| [[COUGAR ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 56.18
 
| style="text-align: right;" | 56.18
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[D & M ENERGY LLC]]
 
| [[D & M ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 124.59
 
| style="text-align: right;" | 124.59
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[TRIMONT ENERGY LLC]]
 
| [[TRIMONT ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 65.75
 
| style="text-align: right;" | 65.75
 
| style="text-align: right;" | 340
 
| style="text-align: right;" | 340
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
| style="text-align: right;" |
+
| [[TRIMONT ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
| style="text-align: right;" |
+
| [[TRIMONT ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| style="text-align: right;" |
+
| [[PENNFIELD ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 133: Line 199:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 138: Line 205:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[COUGAR ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 325.60 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2011
 +
| [[COUGAR ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 112.80 Bbl
 
| style="text-align: right;" | 112.80 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-0
+
| 2012
| Produced Fluid (in Barrels)
+
| [[COUGAR ENERGY INC]]
| style="text-align: right;" | 325.60 Bbl
+
| Produced Fluid
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-0
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 40.09 Bbl
 
| style="text-align: right;" | 40.09 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[D & M ENERGY LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 19.17 Bbl
 
| style="text-align: right;" | 19.17 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-0
+
| 2013
| Fracing Fluid Waste (in Barrels)
+
| [[D & M ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 19.17 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[TRIMONT ENERGY LLC]]
 +
| Fracing Fluid Waste
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[TRIMONT ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 208 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[TRIMONT ENERGY LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 10 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[TRIMONT ENERGY LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 208.00 Bbl
 
| style="text-align: right;" | 208.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[TRIMONT ENERGY LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 184.00 Bbl
 
| style="text-align: right;" | 184.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 199: Line 294:
 
| 1989774
 
| 1989774
 
| Primary Facility
 
| Primary Facility
| 07/20/2011
+
| 2011-07-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 206: Line 301:
 
| 2029735
 
| 2029735
 
| Primary Facility
 
| Primary Facility
| 12/12/2011
+
| 2011-12-12
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 213: Line 308:
 
| 2390438
 
| 2390438
 
| Primary Facility
 
| Primary Facility
| 07/16/2015
+
| 2015-07-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 246: Line 341:
 
| 615960
 
| 615960
 
| 07/20/2011
 
| 07/20/2011
| 12/12/2011
+
| 2011-07-20
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| 102.4NOPLAN - No E&S plan developed, plan not on site
 
| Administrative
 
| Administrative
Line 254: Line 349:
 
| 615961
 
| 615961
 
| 07/20/2011
 
| 07/20/2011
| 12/12/2011
+
| 2011-07-20
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| Administrative
 
| Administrative
Line 276: Line 371:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/18/2012
+
| 2012-07-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 285: Line 380:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/18/2012
+
| 2012-07-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 296: Line 391:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 09:57, 14 May 2020

Well Details

Well ID: 37-053-29960
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Harmony Township
Operator Name: PENNFIELD ENERGY LLC
Well Pad ID:
Farm/Lease Name: MILFORD 6
License Status:
Spud Date:
Permit Date: 2011-01-25
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.564892
Longitude: -79.465489

For data sources see[1][2][3]

Well History

Date Event
2011-01-25 New Permit Application
2011-04-15 Performed Spud Operation
2011-04-20 Drilling Completion
2011-05-03 Perforation
2011-10-20 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 COUGAR ENERGY INC 0.00 0 402.80 250 0.00 0
2012 COUGAR ENERGY INC 0.00 0 56.18 365 0.00 0
2013 D & M ENERGY LLC 0.00 0 124.59 365 0.00 0
2014 TRIMONT ENERGY LLC 0.00 0 65.75 340 0.00 0
2015 TRIMONT ENERGY LLC 0.00 0 0.00 0 0.00 0
2016 TRIMONT ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 PENNFIELD ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 COUGAR ENERGY INC Produced Fluid 325.60 Bbl REUSE OTHER THAN ROAD SPREADING
2011 COUGAR ENERGY INC Produced Fluid 112.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 COUGAR ENERGY INC Produced Fluid 40.09 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 D & M ENERGY LLC Produced Fluid 19.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2013 D & M ENERGY LLC Produced Fluid 19.17 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 TRIMONT ENERGY LLC Fracing Fluid Waste 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 TRIMONT ENERGY LLC Produced Fluid 208 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 TRIMONT ENERGY LLC Fracing Fluid Waste 10 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 TRIMONT ENERGY LLC Produced Fluid 208.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 TRIMONT ENERGY LLC Produced Fluid 184.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1989774 Primary Facility 2011-07-20 Routine/Complete Inspection Violation(s) Noted
2029735 Primary Facility 2011-12-12 Compliance Evaluation No Violations Noted
2390438 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted
2520290 Primary Facility 2016-09-15 Routine/Complete Inspection No Violations Noted
2548137 Primary Facility 2016-12-27 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1989774 615960 07/20/2011 2011-07-20 102.4NOPLAN - No E&S plan developed, plan not on site Administrative No plan on site.
1989774 615961 07/20/2011 2011-07-20 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative Inadequate BMPs.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
615960 276173 NOV - Notice of Violation Comply/Closed 2012-07-18
615961 276173 NOV - Notice of Violation Comply/Closed 2012-07-18

For data sources see[7]

References