If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-035-21269 | | Well ID: 37-035-21269 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.409706, -77.621086 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Clinton_County,_Pennsylvania|Clinton]] |
+ | |- | ||
+ | | Municipality: [[Chapman Township,_Clinton_County,_Pennsylvania|Chapman Township]] | ||
+ | |- | ||
+ | | Operator Name: [[XTO ENERGY INC]] | ||
|- | |- | ||
| Well Pad ID: [[148997]] | | Well Pad ID: [[148997]] | ||
Line 15: | Line 19: | ||
| Farm/Lease Name: PA TRACT E 2H | | Farm/Lease Name: PA TRACT E 2H | ||
|- | |- | ||
− | | | + | | License Status: PLUGGED & ABANDONED |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2011-11-14 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.409706 |
|- | |- | ||
| Longitude: -77.621086 | | Longitude: -77.621086 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-11-14 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-12-09 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-02-08 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2015-06-09 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2016-01-25 | ||
+ | | FULLY PLUGGED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[XTO ENERGY INC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 102.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR119 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
| 2044076 | | 2044076 | ||
+ | | Primary Facility | ||
| 2012-01-26 | | 2012-01-26 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2067999 | | 2067999 | ||
+ | | Primary Facility | ||
| 2012-04-10 | | 2012-04-10 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
| 2071574 | | 2071574 | ||
+ | | Primary Facility | ||
| 2012-05-29 | | 2012-05-29 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
| | | | ||
− | |||
|- | |- | ||
| 2092560 | | 2092560 | ||
+ | | Primary Facility | ||
| 2012-07-05 | | 2012-07-05 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2098627 | ||
+ | | Primary Facility | ||
+ | | 2012-08-07 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
+ | | 2106257 | ||
+ | | Primary Facility | ||
+ | | 2012-09-25 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2115287 |
− | | 2012- | + | | Primary Facility |
+ | | 2012-11-07 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2160328 | ||
+ | | Primary Facility | ||
+ | | 2013-04-04 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
+ | | 2168368 | ||
+ | | Primary Facility | ||
+ | | 2013-05-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2169208 |
− | | | + | | Primary Facility |
+ | | 2013-05-22 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2169672 | ||
+ | | Primary Facility | ||
+ | | 2013-05-23 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
+ | | 2175922 | ||
+ | | Primary Facility | ||
+ | | 2013-06-17 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2184076 |
− | | | + | | Primary Facility |
+ | | 2013-07-16 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
+ | |- | ||
+ | | 2196092 | ||
+ | | Primary Facility | ||
+ | | 2013-08-14 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
− | | | + | | 2202380 |
− | + | | Primary Facility | |
− | + | | 2013-09-03 | |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2250630 |
− | | | + | | Primary Facility |
− | | | + | | 2014-03-05 |
− | + | | Routine/Complete Inspection | |
− | | | + | | No Violations Noted |
− | | | + | | |
− | | | ||
|- | |- | ||
+ | | 2415937 | ||
+ | | Primary Facility | ||
+ | | 2015-10-15 | ||
+ | | Plugging(Includes Plugged/Mined Through) | ||
+ | | No Violations Noted | ||
+ | | Final Plugging Inspection. No Violations noted. | ||
|- | |- | ||
− | | | + | | 2829655 |
− | | | + | | Primary Facility |
− | | | + | | 2019-01-17 |
− | | | + | | Routine/Complete Inspection |
− | + | | No Violations Noted | |
− | + | | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover. | |
− | + | ||
+ | There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. | ||
|- | |- | ||
|} | |} | ||
− | == | + | <!--==== Violations Commited ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Violation ID |
− | !scope="col" | | + | !scope="col" | Penalty ID |
− | !scope="col" | | + | !scope="col" | Penalty Code |
− | !scope="col" | | + | !scope="col" | Penalty Status |
− | !scope="col" | | + | !scope="col" | Penalty Date |
− | !scope="col" | | + | !scope="col" | Enforcement Date |
− | !scope="col" | | + | !scope="col" | Penalty Amount |
− | !scope="col" | | + | !scope="col" | Amount Collected |
− | + | |- | |
− | |} | + | |}--> |
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] |
Well ID: 37-035-21269 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.409706,"lon":-77.621086,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148997 | |
Farm/Lease Name: PA TRACT E 2H | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2011-11-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.409706 | |
Longitude: -77.621086 |
Date | Event |
---|---|
2011-11-14 | New Permit Application |
2011-12-09 | Performed Spud Operation |
2012-02-08 | New Permit Application |
2015-06-09 | Drilling Completion |
2016-01-25 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044076 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | |
2067999 | Primary Facility | 2012-04-10 | Routine/Complete Inspection | No Violations Noted | |
2071574 | Primary Facility | 2012-05-29 | Drilling/Alteration | No Violations Noted | |
2092560 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | |
2098627 | Primary Facility | 2012-08-07 | Routine/Complete Inspection | No Violations Noted | |
2106257 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2115287 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2160328 | Primary Facility | 2013-04-04 | Routine/Complete Inspection | No Violations Noted | |
2168368 | Primary Facility | 2013-05-09 | Routine/Complete Inspection | No Violations Noted | |
2169208 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2169672 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
2175922 | Primary Facility | 2013-06-17 | Routine/Complete Inspection | No Violations Noted | |
2184076 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
2196092 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | No Violations Noted | |
2202380 | Primary Facility | 2013-09-03 | Routine/Complete Inspection | No Violations Noted | |
2250630 | Primary Facility | 2014-03-05 | Routine/Complete Inspection | No Violations Noted | |
2415937 | Primary Facility | 2015-10-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Final Plugging Inspection. No Violations noted. |
2829655 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On January 17, 2019, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract 1H Pad E. Monthly tank maintenance log was available for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 line heaters with water separators and 6 steel vertical production fluids tanks onsite. Both line heaters and production fluid tanks were stationed in secondary containment. |
For data sources see[7]