X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-26897"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-26897
 
| Well ID: 37-059-26897
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.771689, -80.027136 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.771689, -80.027136 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: HENDRICKSON 4H
 
| Farm/Lease Name: HENDRICKSON 4H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 09/02/2015
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 6/22/2015
+
| Permit Date: 2015-06-22
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.771689
 
| Latitude: 39.771689
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2015-06-22
 +
| New Permit Application
 +
|-
 +
| 2015-09-02
 +
| Performed Spud Operation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 106: Line 163:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 111: Line 169:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2015-2
+
| 2015
| Drill Cuttings (in Tons)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 233.21 Tons
+
| Produced Fluid
| LANDFILL
+
| style="text-align: right;" | 50.00 Bbl
| 100172
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,145.83 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2015-2
+
| 2015
| Drill Cuttings (in Tons)
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 60.67 Tons
 
| style="text-align: right;" | 60.67 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100592
 
| 100592
 
|-
 
|-
| 2015-2
+
| 2015
| Drilling Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,145.83 Bbl
+
| Drill Cuttings
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 233.21 Tons
| WMGR123SW001
+
| LANDFILL
 +
| 100172
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 9.47 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 
|-
 
|-
| 2015-2
+
| 2019
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 50.00 Bbl
+
| Synthetic Liner Materials
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 11.18 Tons
| WMGR123SW001
+
| LANDFILL
 +
| 100172
 
|-
 
|-
 
|}
 
|}
Line 154: Line 230:
 
| 2393673
 
| 2393673
 
| Primary Facility
 
| Primary Facility
| 07/01/2015
+
| 2015-07-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 161: Line 237:
 
| 2402539
 
| 2402539
 
| Primary Facility
 
| Primary Facility
| 08/04/2015
+
| 2015-08-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 168: Line 244:
 
| 2402551
 
| 2402551
 
| Primary Facility
 
| Primary Facility
| 08/06/2015
+
| 2015-08-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 175: Line 251:
 
| 2402578
 
| 2402578
 
| Primary Facility
 
| Primary Facility
| 08/07/2015
+
| 2015-08-07
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 182: Line 258:
 
| 2402634
 
| 2402634
 
| Primary Facility
 
| Primary Facility
| 08/21/2015
+
| 2015-08-21
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 189: Line 265:
 
| 2420193
 
| 2420193
 
| Primary Facility
 
| Primary Facility
| 10/28/2015
+
| 2015-10-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 235: Line 311:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 23:26, 14 May 2020

Well Details

Well ID: 37-059-26897
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Dunkard Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 152180
Farm/Lease Name: HENDRICKSON 4H
License Status:
Spud Date:
Permit Date: 2015-06-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.771689
Longitude: -80.027136

For data sources see[1][2][3]

Well History

Date Event
2015-06-22 New Permit Application
2015-09-02 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHEVRON APPALACHIA LLC Produced Fluid 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,145.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Drill Cuttings 60.67 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Drill Cuttings 233.21 Tons LANDFILL 100172
2019 CHEVRON APPALACHIA LLC Waste Water Treatment Sludge 9.47 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 CHEVRON APPALACHIA LLC Synthetic Liner Materials 11.18 Tons LANDFILL 100172

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2393673 Primary Facility 2015-07-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Set conductor @ 53' ( KB ) 6/30/2015.
2402539 Primary Facility 2015-08-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Drilled to 408' ( TD ). Setting Watr Protection Casing to 387' and cementing tonight (8/2/2015).Received call from Chevron explaining Lost Circulation on cement job and plans how to correct the issues.
2402551 Primary Facility 2015-08-06 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Here is a response from the operator, Rick,as per our discussion on the evening of August 5th, 2015 we perforated from 218' to 220', attempted to establish an injection rate of 5 bpm. We were only able to achieve 2.5 bpm. We then subsequently perforated from 216' to 218'. On the morning of August 6th, 2015 we attempted to establish an injection rate of 5 bpm, and were able to do so with 40 bbls of fresh water. After 40 bbls of water were away we were only able to sustain an injection rate of 2.5 bpm.
2402578 Primary Facility 2015-08-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Arrived on location to discover the 2nd cement job was not successful .They are planning to run ( CBL ) log to determine top of cement.
2402634 Primary Facility 2015-08-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, Rig moving back on to # 4 well on (8/16/2015).We did not observe cement to service on our last cement job attempt on the Hendrickson 4H. We will woc 8hrs, we will then drill out to our cement to the FC @364' in order to Re-run a CBL log, if top of cement is below the basket we will perforate @268.The bond log shows little cement behind pipe. The operator decided to set cement plug in 20"casing and move to #3 well. The future plan is to P/A # 4 well pryor to drilling new # 4 well.
2420193 Primary Facility 2015-10-28 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS, The operator decided to Plug this well bore to surface .The origional plan is to set a new conductor and re-drill at later date. The new conductor spud is on hold .
2479127 Primary Facility 2016-04-27 Routine/Complete Inspection No Violations Noted

On 04/27/16 at approximately 0830 hours I conducted a routine complete inspection of the site. The Act 9 sign was in place and all required documents were present in the mail box.

The site overall was well vegetated. One location to the right side of the access road at the pad is recommended to receive additional seeding and mulch (see photos). There were no violations noted at the time of inspection.

For data sources see[7]

References