X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23874"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23874
 
| Well ID: 37-085-23874
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.243468, -80.286316 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.243468, -80.286316 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: LANG UNIT 1
 
| Farm/Lease Name: LANG UNIT 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2005-09-23
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2005-08-10
 
| Permit Date: 2005-08-10
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.243468
 
| Latitude: 41.243468
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-08-10
 +
| New Permit Application
 +
|-
 +
| 2005-09-23
 +
| Performed Spud Operation
 +
|-
 +
| 2005-09-29
 +
| Drilling Completion
 +
|-
 +
| 2005-10-20
 +
| Perforation
 +
|-
 +
| 2005-11-09
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 128:
 
| 2006
 
| 2006
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 10,903.00
+
| style="text-align: right;" | 10903.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 137:
 
| 2007
 
| 2007
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 12,204.00
+
| style="text-align: right;" | 12204.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 146:
 
| 2008
 
| 2008
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 10,323.00
+
| style="text-align: right;" | 10323.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 155:
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| style="text-align: right;" | 9,370.00
+
| style="text-align: right;" | 9370.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 196: Line 237:
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
 
| style="text-align: right;" | 4,704.00
 
| style="text-align: right;" | 4,704.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| style="text-align: right;" | 4,735.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 228: Line 278:
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 33.00 Bbl
+
| style="text-align: right;" | 128.00 Bbl
| Reuse other than road spreading
+
| Other
| 3403522009
+
| 3415523795
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 128.00 Bbl
+
| style="text-align: right;" | 33.00 Bbl
| Other
+
| Reuse other than road spreading
| 3415523795
+
| 3403522009
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 117.00 Bbl
+
| style="text-align: right;" | 70.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| OH-3415523795
+
| OH-1893,1894,32
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
 
| Brine
 
| Brine
| style="text-align: right;" | 70.00 Bbl
+
| style="text-align: right;" | 117.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| OH-1893,1894,32
+
| OH-3415523795
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 126.00 Bbl
 
| style="text-align: right;" | 126.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 262: Line 312:
 
| 2011
 
| 2011
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 66.00 Bbl
+
| style="text-align: right;" | 60.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-21893
+
| 34-155-23795
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 60.00 Bbl
+
| style="text-align: right;" | 66.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-23795
+
| 34-155-21893
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 64.00 Bbl
 
| style="text-align: right;" | 64.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 283: Line 333:
 
| 2013
 
| 2013
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 59.00 Bbl
 
| style="text-align: right;" | 59.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 290: Line 340:
 
| 2014
 
| 2014
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 57.00 Bbl
 +
| Injection Disposal Well
 +
| 34-133-22736
 +
|-
 +
| 2014
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 11.00 Bbl
 
| style="text-align: right;" | 11.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-007-23262
 
| 34-007-23262
 
|-
 
|-
| 2014
+
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 37.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-23262
 +
|-
 +
| 2015
 
| [[CEDAR VALLEY ENERGY INC]]
 
| [[CEDAR VALLEY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 57.00 Bbl
+
| style="text-align: right;" | 19.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
 
| 34-133-22736
 
| 34-133-22736
Line 304: Line 368:
 
| 2016
 
| 2016
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 73.00 Bbl
 
| style="text-align: right;" | 73.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 311: Line 375:
 
| 2017
 
| 2017
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 61.00 Bbl
 
| style="text-align: right;" | 61.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
Line 318: Line 382:
 
| 2018
 
| 2018
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 39.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 57.00 Bbl
 
| style="text-align: right;" | 57.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018
+
| 2019
 +
| [[L & B ENERGY LLP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.00 Bbl
 +
| Injection Disposal Well
 +
| 34-007-21847
 +
|-
 +
| 2019
 
| [[L & B ENERGY LLP]]
 
| [[L & B ENERGY LLP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 39.00 Bbl
+
| style="text-align: right;" | 64.00 Bbl
 
| Injection Disposal Well
 
| Injection Disposal Well
| 34-155-23196
+
| 34-007-20919
 
|-
 
|-
 
|}
 
|}

Latest revision as of 09:36, 15 May 2020

Well Details

Well ID: 37-085-23874
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Jefferson Township
Operator Name: L & B ENERGY LLP
Well Pad ID:
Farm/Lease Name: LANG UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2005-08-10
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.243468
Longitude: -80.286316

For data sources see[1][2][3]

Well History

Date Event
2005-08-10 New Permit Application
2005-09-23 Performed Spud Operation
2005-09-29 Drilling Completion
2005-10-20 Perforation
2005-11-09 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 CEDAR VALLEY ENERGY INC 10903.00 365 0.00 0 0.00 0
2007 CEDAR VALLEY ENERGY INC 12204.00 365 0.00 0 0.00 0
2008 CEDAR VALLEY ENERGY INC 10323.00 365 0.00 0 0.00 0
2009 CEDAR VALLEY ENERGY INC 9370.00 365 0.00 0 0.00 0
2010 CEDAR VALLEY ENERGY INC 8,891.00 365 0.00 0 0.00 0
2011 CEDAR VALLEY ENERGY INC 8,209.00 365 0.00 0 0.00 0
2012 CEDAR VALLEY ENERGY INC 6,007.00 365 0.00 0 0.00 0
2013 CEDAR VALLEY ENERGY INC 3,599.00 365 0.01 365 0.00 0
2014 CEDAR VALLEY ENERGY INC 4,804.00 365 0.00 0 0.00 0
2015 CEDAR VALLEY ENERGY INC 4,890.00 365 0.00 0 0.00 0
2016 L & B ENERGY LLP 4,550.00 365 0.00 0 0.00 0
2017 L & B ENERGY LLP 4,005.00 365 0.00 0 0.00 0
2018 L & B ENERGY LLP 4,704.00 365 0.00 0 0.00 0
2019 L & B ENERGY LLP 4,735.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 CEDAR VALLEY ENERGY INC Brine 80.00 Bbl Injection Disposal Well
2008 CEDAR VALLEY ENERGY INC Brine 128.00 Bbl Other 3415523795
2008 CEDAR VALLEY ENERGY INC Brine 33.00 Bbl Reuse other than road spreading 3403522009
2009 CEDAR VALLEY ENERGY INC Brine 70.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 CEDAR VALLEY ENERGY INC Brine 117.00 Bbl Injection Disposal Well OH-3415523795
2010 CEDAR VALLEY ENERGY INC Produced Fluid 126.00 Bbl Injection Disposal Well 34-155-23795
2011 CEDAR VALLEY ENERGY INC Produced Fluid 60.00 Bbl Injection Disposal Well 34-155-23795
2011 CEDAR VALLEY ENERGY INC Produced Fluid 66.00 Bbl Injection Disposal Well 34-155-21893
2012 CEDAR VALLEY ENERGY INC Produced Fluid 64.00 Bbl Injection Disposal Well 34-155-21893
2013 CEDAR VALLEY ENERGY INC Produced Fluid 59.00 Bbl Injection Disposal Well 34-133-22736
2014 CEDAR VALLEY ENERGY INC Produced Fluid 57.00 Bbl Injection Disposal Well 34-133-22736
2014 CEDAR VALLEY ENERGY INC Produced Fluid 11.00 Bbl Injection Disposal Well 34-007-23262
2015 CEDAR VALLEY ENERGY INC Produced Fluid 37.00 Bbl Injection Disposal Well 34-007-23262
2015 CEDAR VALLEY ENERGY INC Produced Fluid 19.00 Bbl Injection Disposal Well 34-133-22736
2016 L & B ENERGY LLP Produced Fluid 73.00 Bbl Injection Disposal Well 34-007-20919
2017 L & B ENERGY LLP Produced Fluid 61.00 Bbl Injection Disposal Well 34-007-20919
2018 L & B ENERGY LLP Produced Fluid 39.00 Bbl Injection Disposal Well 34-155-23196
2018 L & B ENERGY LLP Produced Fluid 57.00 Bbl ROAD SPREADING
2019 L & B ENERGY LLP Produced Fluid 35.00 Bbl Injection Disposal Well 34-007-21847
2019 L & B ENERGY LLP Produced Fluid 64.00 Bbl Injection Disposal Well 34-007-20919

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1483172 Primary Facility 2005-09-29 Drilling/Alteration No Violations Noted
1488072 Primary Facility 2005-10-14 Drilling/Alteration No Violations Noted
1496620 Primary Facility 2005-11-22 Administrative/File Review No Violations Noted well record review
2011268 Primary Facility 2011-10-17 Routine/Complete Inspection No Violations Noted
2400887 Primary Facility 2015-08-20 Routine/Partial Inspection No Violations Noted
2709307 Primary Facility 2018-03-23 Routine/Partial Inspection No Violations Noted Tubing is open to separator unit. Weekly chart with production on the meter in the separator unit. Production casing is shut. Surface casi g is vented to atmosphere.

For data sources see[7]

References