X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24572"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24572
 
| Well ID: 37-125-24572
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.132278, -80.305806 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.132278, -80.305806 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: JAMES D COOPER 2
 
| Farm/Lease Name: JAMES D COOPER 2
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2011-12-06
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-11-16
 
| Permit Date: 2011-11-16
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.132278
 
| Latitude: 40.132278
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-11-16
 +
| New Permit Application
 +
|-
 +
| 2011-12-06
 +
| Performed Spud Operation
 +
|-
 +
| 2011-12-13
 +
| Drilling Completion
 +
|-
 +
| 2011-12-27
 +
| Perforation
 +
|-
 +
| 2011-12-27
 +
| Performed Stimulation 
 +
|-
 +
| 2012-06-15
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 74: Line 107:
 
|}-->
 
|}-->
  
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2011-12-27
 +
| style="text-align: right;" |
 +
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 86: Line 142:
 
|-
 
|-
 
| 2011
 
| 2011
| style="text-align: right;" |
+
| [[JESMAR ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 151: Line 207:
 
| [[JESMAR ENERGY INC]]
 
| [[JESMAR ENERGY INC]]
 
| style="text-align: right;" | 5,314.00
 
| style="text-align: right;" | 5,314.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 4,792.00
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 167: Line 232:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 172: Line 238:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-A00
+
| 2011
| Drilling Fluid Waste (in Barrels)
+
| [[JESMAR ENERGY INC]]
 +
| Drilling Fluid Waste
 
| style="text-align: right;" | 385.00 Bbl
 
| style="text-align: right;" | 385.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2016-A00
+
| 2016
| Waste Water Treatment Sludge (in Tons) RWC 804
+
| [[JESMAR ENERGY INC]]
 +
| Waste Water Treatment Sludge
 
| style="text-align: right;" | 19.25 Tons
 
| style="text-align: right;" | 19.25 Tons
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[JESMAR ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 92.00 Bbl
 
| style="text-align: right;" | 92.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2014-4
 
| ODNR 2014-4
 +
|-
 +
| 2019
 +
|
 +
| Produced Fluid
 +
| style="text-align: right;" | 9,240.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE004
 
|-
 
|-
 
|}
 
|}

Latest revision as of 10:54, 15 May 2020

Well Details

Well ID: 37-125-24572
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: South Franklin Township
Operator Name: JESMAR ENERGY INC
Well Pad ID:
Farm/Lease Name: JAMES D COOPER 2
License Status:
Spud Date:
Permit Date: 2011-11-16
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.132278
Longitude: -80.305806

For data sources see[1][2][3]

Well History

Date Event
2011-11-16 New Permit Application
2011-12-06 Performed Spud Operation
2011-12-13 Drilling Completion
2011-12-27 Perforation
2011-12-27 Performed Stimulation
2012-06-15 NEWLY DRILLED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-12-27 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 JESMAR ENERGY INC 0.00 0 0.00 0 0.00 0
2012 JESMAR ENERGY INC 3,421.00 244 0.00 0 0.00 0
2013 JESMAR ENERGY INC 6,034.00 365 0.00 0 0.00 0
2014 JESMAR ENERGY INC 1,858.00 360 0.00 0 0.00 0
2015 JESMAR ENERGY INC 5,816.00 360 0.00 0 0.00 0
2016 JESMAR ENERGY INC 5,662.00 360 0.00 0 0.00 0
2017 JESMAR ENERGY INC 5,985.00 360 0.00 0 0.00 0
2018 JESMAR ENERGY INC 5,314.00 360 0.00 0 0.00 0
2019 4,792.00 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 JESMAR ENERGY INC Drilling Fluid Waste 385.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2016 JESMAR ENERGY INC Waste Water Treatment Sludge 19.25 Tons CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 JESMAR ENERGY INC Produced Fluid 92.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2014-4
2019 Produced Fluid 9,240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2026617 Primary Facility 2011-12-06 Drilling/Alteration No Violations Noted Well Spud - E&S in place, site and Location good

For data sources see[8]

References