X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-27240"

m
m
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-27240
 
| Well ID: 37-125-27240
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.077188, -80.062819 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.077258, -80.062931 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[North Bethlehem Township,_Washington_County,_Pennsylvania|North Bethlehem Township]]
 
|-
 
|-
 
| Operator Name: [[RICE DRILLING B LLC]]
 
| Operator Name: [[RICE DRILLING B LLC]]
Line 8: Line 17:
 
| Well Pad ID: [[146838]]
 
| Well Pad ID: [[146838]]
 
|-
 
|-
| First Permit Date: 2013-12-04
+
| Farm/Lease Name: ZORRO
 +
|-
 +
| License Status: Active
 +
|-
 +
| Spud Date: 2014-03-29
 +
|-
 +
| Permit Date: 2013-12-04
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 40.077258
 +
|-
 +
| Longitude: -80.062931
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-12-04
 +
| New Permit Application
 +
|-
 +
| 2014-01-05
 +
| Performed Spud Operation
 +
|-
 +
| 2014-01-12
 +
| Drilling Completion
 +
|-
 +
| 2014-10-01
 +
| Drilling Completion
 +
|-
 +
| 2014-12-05
 +
| Perforation
 +
|-
 +
| 2015-01-11
 +
| Perforation
 +
|-
 +
| 2015-01-11
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2015-01-12
 +
| Perforation
 +
|-
 +
| 2015-01-12
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2015-01-13
 +
| Perforation
 +
|-
 +
| 2015-01-13
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2015-01-13
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2015-01-14
 +
| Perforation
 +
|-
 +
| 2015-01-14
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2015-01-14
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2015-01-14
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2015-01-15
 +
| Perforation
 +
|-
 +
| 2015-01-15
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2015-01-15
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2015-01-15
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2015-01-16
 +
| Perforation
 +
|-
 +
| 2015-01-16
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2015-01-16
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2015-01-17
 +
| Perforation
 +
|-
 +
| 2015-01-17
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2015-01-17
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2015-01-18
 +
| Perforation
 +
|-
 +
| 2015-01-18
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2015-01-18
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2015-01-18
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2015-01-18
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2015-01-19
 +
| Perforation
 +
|-
 +
| 2015-01-19
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2015-01-19
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2015-01-19
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2015-01-19
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2015-01-20
 +
| Perforation
 +
|-
 +
| 2015-01-20
 +
| Performed Stage 23 of Stimulation
 +
|-
 +
| 2015-01-21
 +
| Perforation
 +
|-
 +
| 2015-01-21
 +
| Performed Stage 24 of Stimulation
 +
|-
 +
| 2015-01-21
 +
| Performed Stage 25 of Stimulation
 +
|-
 +
| 2015-01-21
 +
| Performed Stage 26 of Stimulation
 +
|-
 +
| 2015-01-22
 +
| Perforation
 +
|-
 +
| 2015-01-22
 +
| Performed Stage 27 of Stimulation
 +
|-
 +
| 2015-01-22
 +
| Performed Stage 28 of Stimulation
 +
|-
 +
| 2015-01-22
 +
| Performed Stage 29 of Stimulation
 +
|-
 +
| 2015-01-23
 +
| Perforation
 +
|-
 +
| 2015-01-23
 +
| Performed Stage 30 of Stimulation
 +
|-
 +
| 2015-01-23
 +
| Performed Stage 31 of Stimulation
 +
|-
 +
| 2015-01-24
 +
| Perforation
 +
|-
 +
| 2015-01-24
 +
| Performed Stage 32 of Stimulation
 +
|-
 +
| 2015-01-24
 +
| Performed Stage 33 of Stimulation
 +
|-
 +
| 2015-01-25
 +
| Performed Stage 34 of Stimulation
 +
|-
 +
| 2015-01-26
 +
| Perforation
 +
|-
 +
| 2015-01-26
 +
| Performed Stage 35 of Stimulation
 +
|-
 +
| 2015-01-27
 +
| Perforation
 +
|-
 +
| 2015-01-27
 +
| Performed Stage 36 of Stimulation
 +
|-
 +
| 2015-01-27
 +
| Performed Stage 37 of Stimulation
 +
|-
 +
| 2015-01-27
 +
| Performed Stage 38 of Stimulation
 +
|-
 +
| 2015-01-28
 +
| Perforation
 +
|-
 +
| 2015-01-28
 +
| Performed Stage 39 of Stimulation
 +
|-
 +
| 2015-01-28
 +
| Performed Stage 40 of Stimulation
 +
|-
 +
| 2015-01-29
 +
| Perforation
 +
|-
 +
| 2015-01-29
 +
| Performed Stage 41 of Stimulation
 +
|-
 +
| 2015-01-29
 +
| Performed Stage 42 of Stimulation
 +
|-
 +
| 2015-01-30
 +
| Performed Stage 43 of Stimulation
 +
|-
 +
| 2015-02-01
 +
| Perforation
 +
|-
 +
| 2015-02-02
 +
| Performed Stage 44 of Stimulation
 +
|-
 +
| 2018-05-22
 +
| Deviated
 +
|-
 +
| 2018-05-22
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2015-01-09
 +
| 2015-02-02
 +
| style="text-align: right;" | 7,794
 +
| style="text-align: right;" | 14,182,600
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="31"| 1
 +
| rowspan="5"|
 +
| rowspan="5"|
 +
| rowspan="5"| Other Chemicals
 +
| Acetaldehyde
 +
| 75-07-0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00000550
 +
| style="text-align: right;" | 0
 +
|-
 +
| Dioxane
 +
| 123-91-1
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00000550
 +
| style="text-align: right;" | 0
 +
|-
 +
| Cinnamaldehyde
 +
| 104-55-2
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 0
 +
|-
 +
| Ethylene Oxide
 +
| 75-21-8
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00000550
 +
| style="text-align: right;" | 0
 +
|-
 +
| Phosphonic acid ammonium salt
 +
| Proprietary
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.000592283
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="9"| WAI-251LC
 +
| rowspan="9"| WFT
 +
| rowspan="9"| Inhibitor
 +
| Triethylphosphate
 +
| 78-40-0
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 37.6596
 +
|-
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00005496
 +
| style="text-align: right;" | 75.3193
 
|-
 
|-
| Last Permit Date: 2013-12-04
+
| N,N-Dimethylformamide
 +
| 68-12-2
 +
| style="text-align: right;" | 20
 +
| style="text-align: right;" | 0.000109922
 +
| style="text-align: right;" | 150.638
 
|-
 
|-
| Spud Date: 2014-01-05
+
| Isopropyl Alcohol
 +
| 67-63-0
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 37.6596
 
|-
 
|-
| Unconventional: Yes
+
| Tar bases, quinoline derivs, benzyl chloride-quaternized
 +
| 72480-70-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00005496
 +
| style="text-align: right;" | 75.3192
 
|-
 
|-
| Horizontal: No
+
| Ethoxylated Nonylphenol
 +
| 68412-54-4
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 37.6596
 
|-
 
|-
| Violations: None
+
| 1-Octanol
 +
| 111-87-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 37.6596
 
|-
 
|-
| Latitude: 40.077188
+
| 1-Decanol
 +
| 112-30-1
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00002748
 +
| style="text-align: right;" | 37.6596
 
|-
 
|-
| Longitude: -80.062819
+
| Ethylene Glycol
 +
| 111-76-2
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.000219845
 +
| style="text-align: right;" | 301.277
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| Rice Energy
 +
| rowspan="1"| Carrier / Base Fluid
 +
| Carrier / Base Fluid - Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 86.2088
 +
| style="text-align: right;" | 118,141,000.0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Friction Reducers
 +
| rowspan="2"| WFT
 +
| rowspan="2"| Friction Reducers
 +
| Petroleum distillates, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.241427
 +
| style="text-align: right;" | 330854
 +
|-
 +
| Ammonium acetate
 +
| 631-61-8
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00301784
 +
| style="text-align: right;" | 4135.67
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| WSI-685L
 +
| rowspan="3"| WFT
 +
| rowspan="3"| Inhibitor
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.0039577
 +
| style="text-align: right;" | 5423.67
 +
|-
 +
| Methyl Alcohol
 +
| 67-56-1
 +
| style="text-align: right;" | 2.5
 +
| style="text-align: right;" | 0.000659617
 +
| style="text-align: right;" | 903.945
 +
|-
 +
| Monoethanolamine Hydrochloride
 +
| 2002-24-6
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.0039577
 +
| style="text-align: right;" | 5423.67
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| WIC-641L
 +
| rowspan="1"| WFT
 +
| rowspan="1"| Iron Control
 +
| Citric acid
 +
| 77-92-9
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.0019108
 +
| style="text-align: right;" | 2618.58
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% HCL
 +
| rowspan="1"| WFT
 +
| rowspan="1"| Acid
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.0500585
 +
| style="text-align: right;" | 10290.1
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Ottawa Sand 40/70  (2.63 sg)
 +
| rowspan="1"| WFT
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica in the form of Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 2.76535
 +
| style="text-align: right;" | 3,789,660.0
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Bio-
 +
| rowspan="4"| WFT
 +
| rowspan="4"| Bactericide
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 0.5
 +
| style="text-align: right;" | 0.000119479
 +
| style="text-align: right;" | 163.734
 +
|-
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 65
 +
| style="text-align: right;" | 0.0155322
 +
| style="text-align: right;" | 21285.5
 +
|-
 +
| 2,2-dibromo-3-nitriloproppionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00119479
 +
| style="text-align: right;" | 1637.43
 +
|-
 +
| Sodium Bromide
 +
| 7647-15-6
 +
| style="text-align: right;" | 1.5
 +
| style="text-align: right;" | 0.000358436
 +
| style="text-align: right;" | 491.203
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 100 Mesh
 +
| rowspan="1"| WFT
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica in the form of Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 10.3071
 +
| style="text-align: right;" | 14,124,900.0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| FlowPlus DR-5018
 +
| rowspan="3"| Champion Technologies
 +
| rowspan="3"| Friction Reducer
 +
| Acrylamide
 +
| 79-06-1
 +
| style="text-align: right;" | 0.1
 +
| style="text-align: right;" | 0.00001111
 +
| style="text-align: right;" | 15.23
 +
|-
 +
| Sorbitan Monoleate
 +
| 1338-43-8
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.000555679
 +
| style="text-align: right;" | 761.507
 +
|-
 +
| hydrotreated light distillates
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00333408
 +
| style="text-align: right;" | 4569.05
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2015-01-11
 +
| style="text-align: right;" | 1
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,083
 +
| style="text-align: right;" | 9,317
 +
|-
 +
| 2015-01-12
 +
| style="text-align: right;" | 2
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,012
 +
| style="text-align: right;" | 9,377
 +
|-
 +
| 2015-01-13
 +
| style="text-align: right;" | 3
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,004
 +
| style="text-align: right;" | 9,291
 +
|-
 +
| 2015-01-13
 +
| style="text-align: right;" | 4
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,019
 +
| style="text-align: right;" | 9,245
 +
|-
 +
| 2015-01-14
 +
| style="text-align: right;" | 5
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,015
 +
| style="text-align: right;" | 9,234
 +
|-
 +
| 2015-01-14
 +
| style="text-align: right;" | 6
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,989
 +
| style="text-align: right;" | 9,220
 +
|-
 +
| 2015-01-14
 +
| style="text-align: right;" | 7
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,110
 +
| style="text-align: right;" | 9,266
 +
|-
 +
| 2015-01-15
 +
| style="text-align: right;" | 8
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,877
 +
| style="text-align: right;" | 9,276
 +
|-
 +
| 2015-01-15
 +
| style="text-align: right;" | 9
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,053
 +
| style="text-align: right;" | 9,241
 +
|-
 +
| 2015-01-15
 +
| style="text-align: right;" | 10
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,086
 +
| style="text-align: right;" | 9,284
 +
|-
 +
| 2015-01-16
 +
| style="text-align: right;" | 11
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,021
 +
| style="text-align: right;" | 9,248
 +
|-
 +
| 2015-01-16
 +
| style="text-align: right;" | 12
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,064
 +
| style="text-align: right;" | 9,258
 +
|-
 +
| 2015-01-17
 +
| style="text-align: right;" | 13
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,050
 +
| style="text-align: right;" | 9,187
 +
|-
 +
| 2015-01-17
 +
| style="text-align: right;" | 14
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,095
 +
| style="text-align: right;" | 9,402
 +
|-
 +
| 2015-01-18
 +
| style="text-align: right;" | 15
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,071
 +
| style="text-align: right;" | 9,251
 +
|-
 +
| 2015-01-18
 +
| style="text-align: right;" | 16
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,123
 +
| style="text-align: right;" | 9,291
 +
|-
 +
| 2015-01-18
 +
| style="text-align: right;" | 17
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,126
 +
| style="text-align: right;" | 9,338
 +
|-
 +
| 2015-01-18
 +
| style="text-align: right;" | 18
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,006
 +
| style="text-align: right;" | 9,287
 +
|-
 +
| 2015-01-19
 +
| style="text-align: right;" | 19
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,968
 +
| style="text-align: right;" | 9,201
 +
|-
 +
| 2015-01-19
 +
| style="text-align: right;" | 20
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,783
 +
| style="text-align: right;" | 9,359
 +
|-
 +
| 2015-01-19
 +
| style="text-align: right;" | 21
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,907
 +
| style="text-align: right;" | 9,323
 +
|-
 +
| 2015-01-19
 +
| style="text-align: right;" | 22
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,022
 +
| style="text-align: right;" | 9,270
 +
|-
 +
| 2015-01-20
 +
| style="text-align: right;" | 23
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,846
 +
| style="text-align: right;" | 9,123
 +
|-
 +
| 2015-01-21
 +
| style="text-align: right;" | 24
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,056
 +
| style="text-align: right;" | 9,427
 +
|-
 +
| 2015-01-21
 +
| style="text-align: right;" | 25
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,869
 +
| style="text-align: right;" | 9,373
 +
|-
 +
| 2015-01-21
 +
| style="text-align: right;" | 26
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,012
 +
| style="text-align: right;" | 9,277
 +
|-
 +
| 2015-01-22
 +
| style="text-align: right;" | 27
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,004
 +
| style="text-align: right;" | 9,258
 +
|-
 +
| 2015-01-22
 +
| style="text-align: right;" | 28
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,970
 +
| style="text-align: right;" | 9,280
 +
|-
 +
| 2015-01-22
 +
| style="text-align: right;" | 29
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,964
 +
| style="text-align: right;" | 9,359
 +
|-
 +
| 2015-01-23
 +
| style="text-align: right;" | 30
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,941
 +
| style="text-align: right;" | 9,123
 +
|-
 +
| 2015-01-23
 +
| style="text-align: right;" | 31
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,033
 +
| style="text-align: right;" | 9,294
 +
|-
 +
| 2015-01-24
 +
| style="text-align: right;" | 32
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,803
 +
| style="text-align: right;" | 9,359
 +
|-
 +
| 2015-01-24
 +
| style="text-align: right;" | 33
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,585
 +
| style="text-align: right;" | 9,041
 +
|-
 +
| 2015-01-25
 +
| style="text-align: right;" | 34
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,046
 +
| style="text-align: right;" | 9,252
 +
|-
 +
| 2015-01-26
 +
| style="text-align: right;" | 35
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,096
 +
| style="text-align: right;" | 9,341
 +
|-
 +
| 2015-01-27
 +
| style="text-align: right;" | 36
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,103
 +
| style="text-align: right;" | 9,313
 +
|-
 +
| 2015-01-27
 +
| style="text-align: right;" | 37
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,105
 +
| style="text-align: right;" | 9,280
 +
|-
 +
| 2015-01-27
 +
| style="text-align: right;" | 38
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,101
 +
| style="text-align: right;" | 9,331
 +
|-
 +
| 2015-01-28
 +
| style="text-align: right;" | 39
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,111
 +
| style="text-align: right;" | 9,384
 +
|-
 +
| 2015-01-28
 +
| style="text-align: right;" | 40
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,044
 +
| style="text-align: right;" | 9,302
 +
|-
 +
| 2015-01-29
 +
| style="text-align: right;" | 41
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,024
 +
| style="text-align: right;" | 9,263
 +
|-
 +
| 2015-01-29
 +
| style="text-align: right;" | 42
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 9,095
 +
| style="text-align: right;" | 9,309
 +
|-
 +
| 2015-01-30
 +
| style="text-align: right;" | 43
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 8,065
 +
| style="text-align: right;" | 9,201
 +
|-
 +
| 2015-02-02
 +
| style="text-align: right;" | 44
 +
| Silica Sand
 +
| style="text-align: right;" | 13,002,654
 +
| style="text-align: right;" | 7,101
 +
| style="text-align: right;" | 7,950
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 2,835,755.00
 +
| style="text-align: right;" | 262
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 2,343,817.54
 +
| style="text-align: right;" | 353
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 1,569,311.27
 +
| style="text-align: right;" | 305
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 978,883.00
 +
| style="text-align: right;" | 253
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| style="text-align: right;" | 850,087.00
 +
| style="text-align: right;" | 231
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2014
!scope="col" | FACILITY STATE
+
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 430.20 Tons
 +
| LANDFILL
 +
| PAD059087072
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 27.50 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW010
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,034.04 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 215.50 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 171.65 Tons
 +
| LANDFILL
 +
| 100277
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 215.50 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0254185
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 57.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-157-25511
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Spent Lubricant
 +
| style="text-align: right;" | 12.25 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 301353
 +
|-
 +
| 2014
 +
| [[RICE DRILLING B LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 194.55 Tons
 +
| LANDFILL
 +
| 301071
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 13.75 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 9.67 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 671.88 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 5.94 Tons
 +
| LANDFILL
 +
| 100663
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 15.49 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 8,883.38 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 44.41 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2015
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 23,593.26 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 263.89 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 8.75 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 13.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 184.57 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 38.52 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 408.75 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW010
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,489.92 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 295.55 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Filter Socks
 +
| style="text-align: right;" | 0.01 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301280
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 1.96 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 208.64 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 317.25 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 627.56 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 796.11 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 58.74 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 0.35 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 13.76 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 68.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 3.59 Tons
 +
| LANDFILL
 +
| 06-08438
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 387.60 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 23.75 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5.98 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 15.04 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 164.39 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 76.25 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 15.04 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2018
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 506.43 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 22.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 12.27 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 18.23 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 7.43 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 227.96 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[RICE DRILLING B LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 523.97 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2238526
 
| 2238526
 +
| Primary Facility
 
| 2014-01-09
 
| 2014-01-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2246927
 
| 2246927
 +
| Primary Facility
 
| 2014-02-19
 
| 2014-02-19
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Id sign in place. Rig up and drilling.
 
| Id sign in place. Rig up and drilling.
|  
+
|-
 +
| 2260091
 +
| Primary Facility
 +
| 2014-04-04
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Falcon Drilling Rig 23
 +
|-
 +
| 2261620
 +
| Primary Facility
 +
| 2014-04-10
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Falcon Drilling Rig 23.  Depth is currently at 6527 ft. MD, 6482 ft. TVD.
 +
|-
 +
| 2308992
 +
| Primary Facility
 +
| 2014-10-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson Rig 288
 +
|-
 +
| 2315719
 +
| Primary Facility
 +
| 2014-10-24
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson Rig 288
 +
|-
 +
| 2400940
 +
| Primary Facility
 +
| 2015-08-21
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| 6 wells drilled and equipped for production. 2 additional cellars onsite. several upright and trailer tanks on location.
 +
|-
 +
| 2474071
 +
| Primary Facility
 +
| 2016-03-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well is operating and properly identified.  Well is equipped with a production unit.  Six 400 barrel production tanks on site.  Production tanks are located in a diked area.  Diked area contains no standing water.
 +
|-
 +
| 2493069
 +
| Primary Facility
 +
| 2016-05-27
 +
| Incident- Response to Accident or Event
 +
| In Compliance with Policy
 +
| On Friday May 27, 2016, I received notification of a spill that had occurred earlier in the day at the Zorro Well Site located in North Bethlehem Township, Washington County.
 +
A dehydration unit was being flushed to remove glycol residue.  Two waste tanks were staged on the well pad, each within containment, to collect and dispose of the spent fluid.  Approximately 30 gallons of the freshwater, glycol and degreaser mixture was spilled to containment.  It was estimated that at least half of the fluid had impacted the well pad due to a number of small breaches in the containment. 
 +
Moody and Associates, Inc. were retained by Rice to complete the delineation and remediation work.  Results from the confirmatory samples collected following site remediation will be forwarded to the Department upon receipt.  The release was confined to a relatively small area of the pad, the vertical and horizontal extent of impact was defined and the area remediated.  There were no impacts to off-site receptors or Waters of the Com
 +
|-
 +
| 2682461
 +
| Primary Facility
 +
| 2018-01-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Today I conducted a routine inspection at the Zorro well pad and the following was observed.
 +
 
 +
Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained.
 +
|-
 +
| 2714423
 +
| Primary Facility
 +
| 2018-04-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well has been completed and is producing.  Well site and equipment appears to be well maintained.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:31, 15 May 2020

Well Details

Well ID: 37-125-27240
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Bethlehem Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 146838
Farm/Lease Name: ZORRO
License Status: Active
Spud Date: 2014-03-29
Permit Date: 2013-12-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.077258
Longitude: -80.062931

For data sources see[1][2][3]

Well History

Date Event
2013-12-04 New Permit Application
2014-01-05 Performed Spud Operation
2014-01-12 Drilling Completion
2014-10-01 Drilling Completion
2014-12-05 Perforation
2015-01-11 Perforation
2015-01-11 Performed Stage 1 of Stimulation
2015-01-12 Perforation
2015-01-12 Performed Stage 2 of Stimulation
2015-01-13 Perforation
2015-01-13 Performed Stage 3 of Stimulation
2015-01-13 Performed Stage 4 of Stimulation
2015-01-14 Perforation
2015-01-14 Performed Stage 5 of Stimulation
2015-01-14 Performed Stage 6 of Stimulation
2015-01-14 Performed Stage 7 of Stimulation
2015-01-15 Perforation
2015-01-15 Performed Stage 10 of Stimulation
2015-01-15 Performed Stage 8 of Stimulation
2015-01-15 Performed Stage 9 of Stimulation
2015-01-16 Perforation
2015-01-16 Performed Stage 11 of Stimulation
2015-01-16 Performed Stage 12 of Stimulation
2015-01-17 Perforation
2015-01-17 Performed Stage 13 of Stimulation
2015-01-17 Performed Stage 14 of Stimulation
2015-01-18 Perforation
2015-01-18 Performed Stage 15 of Stimulation
2015-01-18 Performed Stage 16 of Stimulation
2015-01-18 Performed Stage 17 of Stimulation
2015-01-18 Performed Stage 18 of Stimulation
2015-01-19 Perforation
2015-01-19 Performed Stage 19 of Stimulation
2015-01-19 Performed Stage 20 of Stimulation
2015-01-19 Performed Stage 21 of Stimulation
2015-01-19 Performed Stage 22 of Stimulation
2015-01-20 Perforation
2015-01-20 Performed Stage 23 of Stimulation
2015-01-21 Perforation
2015-01-21 Performed Stage 24 of Stimulation
2015-01-21 Performed Stage 25 of Stimulation
2015-01-21 Performed Stage 26 of Stimulation
2015-01-22 Perforation
2015-01-22 Performed Stage 27 of Stimulation
2015-01-22 Performed Stage 28 of Stimulation
2015-01-22 Performed Stage 29 of Stimulation
2015-01-23 Perforation
2015-01-23 Performed Stage 30 of Stimulation
2015-01-23 Performed Stage 31 of Stimulation
2015-01-24 Perforation
2015-01-24 Performed Stage 32 of Stimulation
2015-01-24 Performed Stage 33 of Stimulation
2015-01-25 Performed Stage 34 of Stimulation
2015-01-26 Perforation
2015-01-26 Performed Stage 35 of Stimulation
2015-01-27 Perforation
2015-01-27 Performed Stage 36 of Stimulation
2015-01-27 Performed Stage 37 of Stimulation
2015-01-27 Performed Stage 38 of Stimulation
2015-01-28 Perforation
2015-01-28 Performed Stage 39 of Stimulation
2015-01-28 Performed Stage 40 of Stimulation
2015-01-29 Perforation
2015-01-29 Performed Stage 41 of Stimulation
2015-01-29 Performed Stage 42 of Stimulation
2015-01-30 Performed Stage 43 of Stimulation
2015-02-01 Perforation
2015-02-02 Performed Stage 44 of Stimulation
2018-05-22 Deviated
2018-05-22 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-09 2015-02-02 7,794 14,182,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemicals Acetaldehyde 75-07-0 0 0.00000550 0
Dioxane 123-91-1 0 0.00000550 0
Cinnamaldehyde 104-55-2 0 0.00002748 0
Ethylene Oxide 75-21-8 0 0.00000550 0
Phosphonic acid ammonium salt Proprietary 0 0.000592283 0
WAI-251LC WFT Inhibitor Triethylphosphate 78-40-0 5 0.00002748 37.6596
2-Butoxyethanol 111-76-2 10 0.00005496 75.3193
N,N-Dimethylformamide 68-12-2 20 0.000109922 150.638
Isopropyl Alcohol 67-63-0 5 0.00002748 37.6596
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00005496 75.3192
Ethoxylated Nonylphenol 68412-54-4 5 0.00002748 37.6596
1-Octanol 111-87-5 5 0.00002748 37.6596
1-Decanol 112-30-1 5 0.00002748 37.6596
Ethylene Glycol 111-76-2 40 0.000219845 301.277
Water Rice Energy Carrier / Base Fluid Carrier / Base Fluid - Water 7732-18-5 100 86.2088 118,141,000.0
Friction Reducers WFT Friction Reducers Petroleum distillates, hydrotreated light 64742-47-8 40 0.241427 330854
Ammonium acetate 631-61-8 5 0.00301784 4135.67
WSI-685L WFT Inhibitor Ammonium Chloride 12125-02-9 15 0.0039577 5423.67
Methyl Alcohol 67-56-1 2.5 0.000659617 903.945
Monoethanolamine Hydrochloride 2002-24-6 15 0.0039577 5423.67
WIC-641L WFT Iron Control Citric acid 77-92-9 60 0.0019108 2618.58
15% HCL WFT Acid Hydrochloric Acid 7647-01-0 15 0.0500585 10290.1
Ottawa Sand 40/70 (2.63 sg) WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 2.76535 3,789,660.0
Bio- WFT Bactericide Dibromoacetonitrile 3252-43-5 0.5 0.000119479 163.734
Polyethylene Glycol 25322-68-3 65 0.0155322 21285.5
2,2-dibromo-3-nitriloproppionamide 10222-01-2 5 0.00119479 1637.43
Sodium Bromide 7647-15-6 1.5 0.000358436 491.203
100 Mesh WFT Proppant Crystalline Silica in the form of Quartz 14808-60-7 100 10.3071 14,124,900.0
FlowPlus DR-5018 Champion Technologies Friction Reducer Acrylamide 79-06-1 0.1 0.00001111 15.23
Sorbitan Monoleate 1338-43-8 5 0.000555679 761.507
hydrotreated light distillates 64742-47-8 30 0.00333408 4569.05

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-01-11 1 Silica Sand 13,002,654 9,083 9,317
2015-01-12 2 Silica Sand 13,002,654 9,012 9,377
2015-01-13 3 Silica Sand 13,002,654 9,004 9,291
2015-01-13 4 Silica Sand 13,002,654 9,019 9,245
2015-01-14 5 Silica Sand 13,002,654 9,015 9,234
2015-01-14 6 Silica Sand 13,002,654 8,989 9,220
2015-01-14 7 Silica Sand 13,002,654 9,110 9,266
2015-01-15 8 Silica Sand 13,002,654 8,877 9,276
2015-01-15 9 Silica Sand 13,002,654 9,053 9,241
2015-01-15 10 Silica Sand 13,002,654 9,086 9,284
2015-01-16 11 Silica Sand 13,002,654 9,021 9,248
2015-01-16 12 Silica Sand 13,002,654 9,064 9,258
2015-01-17 13 Silica Sand 13,002,654 9,050 9,187
2015-01-17 14 Silica Sand 13,002,654 9,095 9,402
2015-01-18 15 Silica Sand 13,002,654 9,071 9,251
2015-01-18 16 Silica Sand 13,002,654 9,123 9,291
2015-01-18 17 Silica Sand 13,002,654 9,126 9,338
2015-01-18 18 Silica Sand 13,002,654 9,006 9,287
2015-01-19 19 Silica Sand 13,002,654 8,968 9,201
2015-01-19 20 Silica Sand 13,002,654 8,783 9,359
2015-01-19 21 Silica Sand 13,002,654 8,907 9,323
2015-01-19 22 Silica Sand 13,002,654 9,022 9,270
2015-01-20 23 Silica Sand 13,002,654 8,846 9,123
2015-01-21 24 Silica Sand 13,002,654 9,056 9,427
2015-01-21 25 Silica Sand 13,002,654 8,869 9,373
2015-01-21 26 Silica Sand 13,002,654 9,012 9,277
2015-01-22 27 Silica Sand 13,002,654 9,004 9,258
2015-01-22 28 Silica Sand 13,002,654 8,970 9,280
2015-01-22 29 Silica Sand 13,002,654 8,964 9,359
2015-01-23 30 Silica Sand 13,002,654 8,941 9,123
2015-01-23 31 Silica Sand 13,002,654 9,033 9,294
2015-01-24 32 Silica Sand 13,002,654 8,803 9,359
2015-01-24 33 Silica Sand 13,002,654 8,585 9,041
2015-01-25 34 Silica Sand 13,002,654 9,046 9,252
2015-01-26 35 Silica Sand 13,002,654 9,096 9,341
2015-01-27 36 Silica Sand 13,002,654 9,103 9,313
2015-01-27 37 Silica Sand 13,002,654 9,105 9,280
2015-01-27 38 Silica Sand 13,002,654 9,101 9,331
2015-01-28 39 Silica Sand 13,002,654 9,111 9,384
2015-01-28 40 Silica Sand 13,002,654 9,044 9,302
2015-01-29 41 Silica Sand 13,002,654 9,024 9,263
2015-01-29 42 Silica Sand 13,002,654 9,095 9,309
2015-01-30 43 Silica Sand 13,002,654 8,065 9,201
2015-02-02 44 Silica Sand 13,002,654 7,101 7,950

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2015 RICE DRILLING B LLC 2,835,755.00 262 0.00 0 0.00 0
2016 RICE DRILLING B LLC 2,343,817.54 353 0.00 0 0.00 0
2017 RICE DRILLING B LLC 1,569,311.27 305 0.00 0 0.00 0
2018 RICE DRILLING B LLC 978,883.00 253 0.00 0 0.00 0
2019 RICE DRILLING B LLC 850,087.00 231 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 RICE DRILLING B LLC Drill Cuttings 430.20 Tons LANDFILL PAD059087072
2014 RICE DRILLING B LLC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2014 RICE DRILLING B LLC Drill Cuttings 1,034.04 Tons LANDFILL 100172
2014 RICE DRILLING B LLC Produced Fluid 215.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 RICE DRILLING B LLC Drill Cuttings 171.65 Tons LANDFILL 100277
2014 RICE DRILLING B LLC Produced Fluid 215.50 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 RICE DRILLING B LLC Produced Fluid 57.50 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014 RICE DRILLING B LLC Spent Lubricant 12.25 Bbl RESIDUAL WASTE TRANSFER FACILITY 301353
2014 RICE DRILLING B LLC Drill Cuttings 194.55 Tons LANDFILL 301071
2015 RICE DRILLING B LLC Fracing Fluid Waste 13.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Fracturing Fluid Waste 9.67 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2015 RICE DRILLING B LLC Fracing Fluid Waste 671.88 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RICE DRILLING B LLC Fracturing Fluid Waste 5.94 Tons LANDFILL 100663
2015 RICE DRILLING B LLC Fracturing Fluid Waste 15.49 Tons LANDFILL 100172
2015 RICE DRILLING B LLC Produced Fluid 8,883.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Fracturing Fluid Waste 44.41 Tons LANDFILL 100592
2015 RICE DRILLING B LLC Produced Fluid 23,593.26 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 263.89 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 8.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Fracturing Fluid Waste 13.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 184.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 38.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 408.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2016 RICE DRILLING B LLC Produced Fluid 6,489.92 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 295.55 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Filter Socks 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 1.96 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Produced Fluid 208.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 317.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 627.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Produced Fluid 796.11 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 58.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Waste Water Treatment Sludge 0.35 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Produced Fluid 13.76 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 68.67 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 3.59 Tons LANDFILL 06-08438
2018 RICE DRILLING B LLC Produced Fluid 387.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 23.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 5.98 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Soil Contaminated by Oil 15.04 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 164.39 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 76.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 15.04 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 RICE DRILLING B LLC Produced Fluid 506.43 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 22.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 12.27 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 18.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 RICE DRILLING B LLC Produced Fluid 7.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 227.96 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 523.97 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2238526 Primary Facility 2014-01-09 Drilling/Alteration No Violations Noted
2246927 Primary Facility 2014-02-19 Complaint Inspection No Violations Noted Id sign in place. Rig up and drilling.
2260091 Primary Facility 2014-04-04 Drilling/Alteration No Violations Noted Falcon Drilling Rig 23
2261620 Primary Facility 2014-04-10 Drilling/Alteration No Violations Noted Falcon Drilling Rig 23. Depth is currently at 6527 ft. MD, 6482 ft. TVD.
2308992 Primary Facility 2014-10-01 Drilling/Alteration No Violations Noted Patterson Rig 288
2315719 Primary Facility 2014-10-24 Drilling/Alteration No Violations Noted Patterson Rig 288
2400940 Primary Facility 2015-08-21 Complaint Inspection No Violations Noted 6 wells drilled and equipped for production. 2 additional cellars onsite. several upright and trailer tanks on location.
2474071 Primary Facility 2016-03-10 Routine/Complete Inspection No Violations Noted Well is operating and properly identified. Well is equipped with a production unit. Six 400 barrel production tanks on site. Production tanks are located in a diked area. Diked area contains no standing water.
2493069 Primary Facility 2016-05-27 Incident- Response to Accident or Event In Compliance with Policy On Friday May 27, 2016, I received notification of a spill that had occurred earlier in the day at the Zorro Well Site located in North Bethlehem Township, Washington County.

A dehydration unit was being flushed to remove glycol residue. Two waste tanks were staged on the well pad, each within containment, to collect and dispose of the spent fluid. Approximately 30 gallons of the freshwater, glycol and degreaser mixture was spilled to containment. It was estimated that at least half of the fluid had impacted the well pad due to a number of small breaches in the containment. Moody and Associates, Inc. were retained by Rice to complete the delineation and remediation work. Results from the confirmatory samples collected following site remediation will be forwarded to the Department upon receipt. The release was confined to a relatively small area of the pad, the vertical and horizontal extent of impact was defined and the area remediated. There were no impacts to off-site receptors or Waters of the Com

2682461 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted Today I conducted a routine inspection at the Zorro well pad and the following was observed.

Proper signs were displayed identifying the site. The site was stabilized with thick vegetation no erosion observed outside of the LOD. The well heads were maintained, no leaks or fluids around well head. The production tanks were in good condition no leaks , rust or defects observed. Secondary containment for the site was intact and maintained.

2714423 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted This well has been completed and is producing. Well site and equipment appears to be well maintained.

For data sources see[9]

References