If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-125-27278 | | Well ID: 37-125-27278 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.116508, -80.074467 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Washington_County,_Pennsylvania|Washington]] | ||
+ | |- | ||
+ | | Municipality: [[Somerset Township,_Washington_County,_Pennsylvania|Somerset Township]] | ||
|- | |- | ||
| Operator Name: [[RICE DRILLING B LLC]] | | Operator Name: [[RICE DRILLING B LLC]] | ||
Line 9: | Line 17: | ||
| Well Pad ID: [[145010]] | | Well Pad ID: [[145010]] | ||
|- | |- | ||
− | | | + | | Farm/Lease Name: BIG DADDY SHAW |
+ | |- | ||
+ | | License Status: Active | ||
+ | |- | ||
+ | | Spud Date: 2014-01-14 | ||
|- | |- | ||
− | | | + | | Permit Date: 2014-01-29 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | Unconventional: | + | | Unconventional Well: Y |
|- | |- | ||
− | | Horizontal | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: Yes |
|- | |- | ||
| Latitude: 40.116508 | | Latitude: 40.116508 | ||
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.074467 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2014-01-29 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2014-02-11 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2014-04-04 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-05-19 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-08-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | Performed Stage 1 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | Performed Stage 2 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | Performed Stage 3 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | Performed Stage 4 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | Performed Stage 5 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | Performed Stage 6 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | Performed Stage 7 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | Performed Stage 10 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | Performed Stage 11 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | Performed Stage 8 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | Performed Stage 9 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | Performed Stage 12 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | Performed Stage 13 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | Performed Stage 14 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | Performed Stage 15 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | Performed Stage 16 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | Performed Stage 17 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | Performed Stage 18 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-15 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-15 | ||
+ | | Performed Stage 19 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-26 | ||
+ | | Performed Stage 20 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-27 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-27 | ||
+ | | Performed Stage 21 of Stimulation | ||
+ | |- | ||
+ | | 2014-08-31 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-08-31 | ||
+ | | Performed Stage 22 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-01 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-01 | ||
+ | | Performed Stage 23 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-02 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-02 | ||
+ | | Performed Stage 24 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-03 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-03 | ||
+ | | Performed Stage 25 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-03 | ||
+ | | Performed Stage 26 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-04 | ||
+ | | Performed Stage 27 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-05 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-05 | ||
+ | | Performed Stage 28 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | Performed Stage 29 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | Performed Stage 30 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | Performed Stage 31 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | Performed Stage 32 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Performed Stage 33 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | Performed Stage 34 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Performed Stage 35 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Performed Stage 36 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | Performed Stage 37 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Performed Stage 38 of Stimulation | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | Performed Stage 39 of Stimulation | ||
+ | |- | ||
+ | | 2018-07-09 | ||
+ | | Deviated | ||
+ | |- | ||
+ | | 2018-07-09 | ||
+ | | Newly Drilled | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | style="text-align: right;" | 1 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,526 | ||
+ | | style="text-align: right;" | 8,950 | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | style="text-align: right;" | 2 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,856 | ||
+ | | style="text-align: right;" | 9,150 | ||
+ | |- | ||
+ | | 2014-08-10 | ||
+ | | style="text-align: right;" | 3 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,713 | ||
+ | | style="text-align: right;" | 8,845 | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | style="text-align: right;" | 4 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,816 | ||
+ | | style="text-align: right;" | 9,077 | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | style="text-align: right;" | 5 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,681 | ||
+ | | style="text-align: right;" | 9,006 | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | style="text-align: right;" | 6 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,268 | ||
+ | | style="text-align: right;" | 8,790 | ||
+ | |- | ||
+ | | 2014-08-11 | ||
+ | | style="text-align: right;" | 7 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,519 | ||
+ | | style="text-align: right;" | 8,963 | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | style="text-align: right;" | 8 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,774 | ||
+ | | style="text-align: right;" | 9,077 | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | style="text-align: right;" | 9 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,456 | ||
+ | | style="text-align: right;" | 9,052 | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | style="text-align: right;" | 10 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,573 | ||
+ | | style="text-align: right;" | 8,794 | ||
+ | |- | ||
+ | | 2014-08-12 | ||
+ | | style="text-align: right;" | 11 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,362 | ||
+ | | style="text-align: right;" | 8,873 | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | style="text-align: right;" | 12 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,429 | ||
+ | | style="text-align: right;" | 8,675 | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | style="text-align: right;" | 13 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,784 | ||
+ | | style="text-align: right;" | 9,105 | ||
+ | |- | ||
+ | | 2014-08-13 | ||
+ | | style="text-align: right;" | 14 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,634 | ||
+ | | style="text-align: right;" | 8,783 | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | style="text-align: right;" | 15 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,725 | ||
+ | | style="text-align: right;" | 8,905 | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | style="text-align: right;" | 16 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,559 | ||
+ | | style="text-align: right;" | 8,740 | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,479 | ||
+ | | style="text-align: right;" | 8,662 | ||
+ | |- | ||
+ | | 2014-08-14 | ||
+ | | style="text-align: right;" | 18 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,375 | ||
+ | | style="text-align: right;" | 8,499 | ||
+ | |- | ||
+ | | 2014-08-15 | ||
+ | | style="text-align: right;" | 19 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,664 | ||
+ | | style="text-align: right;" | 8,861 | ||
+ | |- | ||
+ | | 2014-08-26 | ||
+ | | style="text-align: right;" | 20 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,997 | ||
+ | | style="text-align: right;" | 9,324 | ||
+ | |- | ||
+ | | 2014-08-27 | ||
+ | | style="text-align: right;" | 21 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,387 | ||
+ | | style="text-align: right;" | 9,236 | ||
+ | |- | ||
+ | | 2014-08-31 | ||
+ | | style="text-align: right;" | 22 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,146 | ||
+ | | style="text-align: right;" | 9,101 | ||
+ | |- | ||
+ | | 2014-09-01 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,235 | ||
+ | | style="text-align: right;" | 8,840 | ||
+ | |- | ||
+ | | 2014-09-02 | ||
+ | | style="text-align: right;" | 24 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,868 | ||
+ | | style="text-align: right;" | 8,618 | ||
+ | |- | ||
+ | | 2014-09-03 | ||
+ | | style="text-align: right;" | 25 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,405 | ||
+ | | style="text-align: right;" | 9,084 | ||
+ | |- | ||
+ | | 2014-09-03 | ||
+ | | style="text-align: right;" | 26 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,517 | ||
+ | | style="text-align: right;" | 9,121 | ||
+ | |- | ||
+ | | 2014-09-04 | ||
+ | | style="text-align: right;" | 27 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,539 | ||
+ | | style="text-align: right;" | 9,248 | ||
+ | |- | ||
+ | | 2014-09-05 | ||
+ | | style="text-align: right;" | 28 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,094 | ||
+ | | style="text-align: right;" | 8,573 | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | style="text-align: right;" | 29 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,246 | ||
+ | | style="text-align: right;" | 8,927 | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,601 | ||
+ | | style="text-align: right;" | 8,227 | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | style="text-align: right;" | 31 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,183 | ||
+ | | style="text-align: right;" | 9,027 | ||
+ | |- | ||
+ | | 2014-09-11 | ||
+ | | style="text-align: right;" | 32 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,465 | ||
+ | | style="text-align: right;" | 9,034 | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | style="text-align: right;" | 33 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,603 | ||
+ | | style="text-align: right;" | 8,782 | ||
+ | |- | ||
+ | | 2014-09-12 | ||
+ | | style="text-align: right;" | 34 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,591 | ||
+ | | style="text-align: right;" | 8,356 | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | style="text-align: right;" | 35 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,774 | ||
+ | | style="text-align: right;" | 8,446 | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | style="text-align: right;" | 36 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 8,002 | ||
+ | | style="text-align: right;" | 9,187 | ||
+ | |- | ||
+ | | 2014-09-13 | ||
+ | | style="text-align: right;" | 37 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,499 | ||
+ | | style="text-align: right;" | 8,743 | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | style="text-align: right;" | 38 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,699 | ||
+ | | style="text-align: right;" | 9,115 | ||
+ | |- | ||
+ | | 2014-09-14 | ||
+ | | style="text-align: right;" | 39 | ||
+ | | Silica Sand | ||
+ | | style="text-align: right;" | 62,497 | ||
+ | | style="text-align: right;" | 7,140 | ||
+ | | style="text-align: right;" | 8,804 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 768,951.00 | ||
+ | | style="text-align: right;" | 70 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 2,837,836.00 | ||
+ | | style="text-align: right;" | 364 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 1,679,413.07 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 1,214,470.03 | ||
+ | | style="text-align: right;" | 337 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 974,449.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | style="text-align: right;" | 268,401.00 | ||
+ | | style="text-align: right;" | 114 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | WASTE FACILITY PERMIT | + | !scope="col" | Waste Facility ID |
− | + | |- | |
− | + | | 2014 | |
− | + | | [[RICE DRILLING B LLC]] | |
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 135.72 Tons | ||
+ | | LANDFILL | ||
+ | | PAD059087072 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 18.57 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 7.50 Bbl | ||
+ | | LANDFILL | ||
+ | | CID # 28726 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 153.45 Tons | ||
+ | | LANDFILL | ||
+ | | 100172 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 6,986.29 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES DISCHARGE | ||
+ | | PA0254185 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 27.85 Tons | ||
+ | | LANDFILL | ||
+ | | 100172 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 6,986.29 Bbl | ||
+ | | CENT WASTE TRT FAC NPDES | ||
+ | | PA0254185 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,951.43 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drill Cuttings | ||
+ | | style="text-align: right;" | 467.91 Tons | ||
+ | | LANDFILL | ||
+ | | 301071 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 2.36 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 68.05 Bbl | ||
+ | | LANDFILL | ||
+ | | 100592 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 2.85 Tons | ||
+ | | LANDFILL | ||
+ | | 100172 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 157.14 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 15.71 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-013-20609 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 122.57 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-157-25511 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4,360.71 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 2.00 Tons | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 42-003-38495 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Fracturing Fluid Waste | ||
+ | | style="text-align: right;" | 5.53 Tons | ||
+ | | LANDFILL | ||
+ | | 100592 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 12,327.76 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 305.86 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 9.14 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 173.19 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 9.57 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 496.44 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 4,876.88 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Filter Socks | ||
+ | | style="text-align: right;" | 0.02 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Waste Water Treatment Sludge | ||
+ | | style="text-align: right;" | 2.88 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 123.60 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 178.57 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1.07 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 2014-541 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Filter Socks | ||
+ | | style="text-align: right;" | 0.04 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301280 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 115.32 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 15.71 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 612.21 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 44.12 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 425.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 173.61 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 57.62 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 38.56 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 12.86 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 781.03 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 32.86 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 104.55 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 587.13 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 25.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 10.83 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes | ||
+ | | style="text-align: right;" | 100.53 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
+ | !scope="col" | Inspection Comments | ||
+ | |- | ||
+ | | 2268175 | ||
+ | | Primary Facility | ||
+ | | 2014-05-05 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Northeast Energy Rig 14 | ||
+ | |- | ||
+ | | 2272359 | ||
+ | | Primary Facility | ||
+ | | 2014-05-20 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson Rig 349 | ||
+ | |- | ||
+ | | 2274286 | ||
+ | | Primary Facility | ||
+ | | 2014-05-28 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson Rig 349 | ||
+ | |- | ||
+ | | 2768814 | ||
+ | | Primary Facility | ||
+ | | 2018-08-29 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appears to be maintained and producing. Water in cellar. | ||
+ | |- | ||
+ | | 2824373 | ||
+ | | Primary Facility | ||
+ | | 2019-01-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed: | ||
+ | |||
+ | >>The operator representative reported plans to revisit the site to drill further wells. | ||
+ | |||
+ | >>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review. | ||
+ | |||
+ | >>The site was in generally good condition with no noted violations or concerns. | ||
+ | |- | ||
+ | | 2837704 | ||
+ | | Primary Facility | ||
+ | | 2019-02-08 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well appears to be well maintained and producing. | ||
+ | |||
+ | Cellar Tech/NOV auger rig on location to spud 7 new wells. | ||
+ | |- | ||
+ | | 2838458 | ||
+ | | Primary Facility | ||
+ | | 2019-02-07 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well tag present. | ||
+ | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-125-27278 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.116508,"lon":-80.074467,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Somerset Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 145010 | |
Farm/Lease Name: BIG DADDY SHAW | |
License Status: Active | |
Spud Date: 2014-01-14 | |
Permit Date: 2014-01-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.116508 | |
Longitude: -80.074467 |
Date | Event |
---|---|
2014-01-29 | New Permit Application |
2014-02-11 | Performed Spud Operation |
2014-04-04 | Drilling Completion |
2014-05-19 | Drilling Completion |
2014-08-04 | Perforation |
2014-08-10 | Perforation |
2014-08-10 | Performed Stage 1 of Stimulation |
2014-08-10 | Performed Stage 2 of Stimulation |
2014-08-10 | Performed Stage 3 of Stimulation |
2014-08-11 | Perforation |
2014-08-11 | Performed Stage 4 of Stimulation |
2014-08-11 | Performed Stage 5 of Stimulation |
2014-08-11 | Performed Stage 6 of Stimulation |
2014-08-11 | Performed Stage 7 of Stimulation |
2014-08-12 | Perforation |
2014-08-12 | Performed Stage 10 of Stimulation |
2014-08-12 | Performed Stage 11 of Stimulation |
2014-08-12 | Performed Stage 8 of Stimulation |
2014-08-12 | Performed Stage 9 of Stimulation |
2014-08-13 | Perforation |
2014-08-13 | Performed Stage 12 of Stimulation |
2014-08-13 | Performed Stage 13 of Stimulation |
2014-08-13 | Performed Stage 14 of Stimulation |
2014-08-14 | Perforation |
2014-08-14 | Performed Stage 15 of Stimulation |
2014-08-14 | Performed Stage 16 of Stimulation |
2014-08-14 | Performed Stage 17 of Stimulation |
2014-08-14 | Performed Stage 18 of Stimulation |
2014-08-15 | Perforation |
2014-08-15 | Performed Stage 19 of Stimulation |
2014-08-26 | Performed Stage 20 of Stimulation |
2014-08-27 | Perforation |
2014-08-27 | Performed Stage 21 of Stimulation |
2014-08-31 | Perforation |
2014-08-31 | Performed Stage 22 of Stimulation |
2014-09-01 | Perforation |
2014-09-01 | Performed Stage 23 of Stimulation |
2014-09-02 | Perforation |
2014-09-02 | Performed Stage 24 of Stimulation |
2014-09-03 | Perforation |
2014-09-03 | Performed Stage 25 of Stimulation |
2014-09-03 | Performed Stage 26 of Stimulation |
2014-09-04 | Perforation |
2014-09-04 | Performed Stage 27 of Stimulation |
2014-09-05 | Perforation |
2014-09-05 | Performed Stage 28 of Stimulation |
2014-09-10 | Perforation |
2014-09-10 | Performed Stage 29 of Stimulation |
2014-09-10 | Performed Stage 30 of Stimulation |
2014-09-11 | Perforation |
2014-09-11 | Performed Stage 31 of Stimulation |
2014-09-11 | Performed Stage 32 of Stimulation |
2014-09-12 | Perforation |
2014-09-12 | Performed Stage 33 of Stimulation |
2014-09-12 | Performed Stage 34 of Stimulation |
2014-09-13 | Perforation |
2014-09-13 | Performed Stage 35 of Stimulation |
2014-09-13 | Performed Stage 36 of Stimulation |
2014-09-13 | Performed Stage 37 of Stimulation |
2014-09-14 | Perforation |
2014-09-14 | Performed Stage 38 of Stimulation |
2014-09-14 | Performed Stage 39 of Stimulation |
2018-07-09 | Deviated |
2018-07-09 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-08-10 | 1 | Silica Sand | 62,497 | 8,526 | 8,950 |
2014-08-10 | 2 | Silica Sand | 62,497 | 8,856 | 9,150 |
2014-08-10 | 3 | Silica Sand | 62,497 | 8,713 | 8,845 |
2014-08-11 | 4 | Silica Sand | 62,497 | 8,816 | 9,077 |
2014-08-11 | 5 | Silica Sand | 62,497 | 8,681 | 9,006 |
2014-08-11 | 6 | Silica Sand | 62,497 | 8,268 | 8,790 |
2014-08-11 | 7 | Silica Sand | 62,497 | 8,519 | 8,963 |
2014-08-12 | 8 | Silica Sand | 62,497 | 8,774 | 9,077 |
2014-08-12 | 9 | Silica Sand | 62,497 | 8,456 | 9,052 |
2014-08-12 | 10 | Silica Sand | 62,497 | 8,573 | 8,794 |
2014-08-12 | 11 | Silica Sand | 62,497 | 8,362 | 8,873 |
2014-08-13 | 12 | Silica Sand | 62,497 | 8,429 | 8,675 |
2014-08-13 | 13 | Silica Sand | 62,497 | 8,784 | 9,105 |
2014-08-13 | 14 | Silica Sand | 62,497 | 8,634 | 8,783 |
2014-08-14 | 15 | Silica Sand | 62,497 | 8,725 | 8,905 |
2014-08-14 | 16 | Silica Sand | 62,497 | 8,559 | 8,740 |
2014-08-14 | 17 | Silica Sand | 62,497 | 8,479 | 8,662 |
2014-08-14 | 18 | Silica Sand | 62,497 | 8,375 | 8,499 |
2014-08-15 | 19 | Silica Sand | 62,497 | 8,664 | 8,861 |
2014-08-26 | 20 | Silica Sand | 62,497 | 8,997 | 9,324 |
2014-08-27 | 21 | Silica Sand | 62,497 | 8,387 | 9,236 |
2014-08-31 | 22 | Silica Sand | 62,497 | 8,146 | 9,101 |
2014-09-01 | 23 | Silica Sand | 62,497 | 8,235 | 8,840 |
2014-09-02 | 24 | Silica Sand | 62,497 | 7,868 | 8,618 |
2014-09-03 | 25 | Silica Sand | 62,497 | 8,405 | 9,084 |
2014-09-03 | 26 | Silica Sand | 62,497 | 8,517 | 9,121 |
2014-09-04 | 27 | Silica Sand | 62,497 | 8,539 | 9,248 |
2014-09-05 | 28 | Silica Sand | 62,497 | 8,094 | 8,573 |
2014-09-10 | 29 | Silica Sand | 62,497 | 8,246 | 8,927 |
2014-09-10 | 30 | Silica Sand | 62,497 | 7,601 | 8,227 |
2014-09-11 | 31 | Silica Sand | 62,497 | 8,183 | 9,027 |
2014-09-11 | 32 | Silica Sand | 62,497 | 8,465 | 9,034 |
2014-09-12 | 33 | Silica Sand | 62,497 | 7,603 | 8,782 |
2014-09-12 | 34 | Silica Sand | 62,497 | 7,591 | 8,356 |
2014-09-13 | 35 | Silica Sand | 62,497 | 7,774 | 8,446 |
2014-09-13 | 36 | Silica Sand | 62,497 | 8,002 | 9,187 |
2014-09-13 | 37 | Silica Sand | 62,497 | 7,499 | 8,743 |
2014-09-14 | 38 | Silica Sand | 62,497 | 7,699 | 9,115 |
2014-09-14 | 39 | Silica Sand | 62,497 | 7,140 | 8,804 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | 768,951.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 2,837,836.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 1,679,413.07 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 1,214,470.03 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 974,449.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 268,401.00 | 114 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | RICE DRILLING B LLC | Drill Cuttings | 135.72 Tons | LANDFILL | PAD059087072 |
2014 | RICE DRILLING B LLC | Produced Fluid | 18.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2014 | RICE DRILLING B LLC | Produced Fluid | 7.50 Bbl | LANDFILL | CID # 28726 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 153.45 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | RICE DRILLING B LLC | Fracturing Fluid Waste | 27.85 Tons | LANDFILL | 100172 |
2014 | RICE DRILLING B LLC | Produced Fluid | 6,986.29 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | RICE DRILLING B LLC | Produced Fluid | 1,951.43 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014 | RICE DRILLING B LLC | Drill Cuttings | 467.91 Tons | LANDFILL | 301071 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.36 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | RICE DRILLING B LLC | Drilling Fluid Waste | 68.05 Bbl | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.85 Tons | LANDFILL | 100172 |
2015 | RICE DRILLING B LLC | Produced Fluid | 157.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015 | RICE DRILLING B LLC | Produced Fluid | 15.71 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | RICE DRILLING B LLC | Produced Fluid | 122.57 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | RICE DRILLING B LLC | Produced Fluid | 4,360.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 2.00 Tons | INJECTION DISPOSAL WELL | 42-003-38495 |
2015 | RICE DRILLING B LLC | Fracturing Fluid Waste | 5.53 Tons | LANDFILL | 100592 |
2015 | RICE DRILLING B LLC | Produced Fluid | 12,327.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 305.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 173.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 9.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 496.44 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | RICE DRILLING B LLC | Produced Fluid | 4,876.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | RICE DRILLING B LLC | Filter Socks | 0.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2016 | RICE DRILLING B LLC | Waste Water Treatment Sludge | 2.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | RICE DRILLING B LLC | Produced Fluid | 123.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 178.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | RICE DRILLING B LLC | Produced Fluid | 1.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | RICE DRILLING B LLC | Filter Socks | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.32 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | RICE DRILLING B LLC | Produced Fluid | 612.21 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 44.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Produced Fluid | 425.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 173.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 57.62 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 38.56 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 12.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 781.03 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 32.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 104.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | RICE DRILLING B LLC | Produced Fluid | 587.13 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 25.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 10.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 100.53 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2268175 | Primary Facility | 2014-05-05 | Drilling/Alteration | No Violations Noted | Northeast Energy Rig 14 |
2272359 | Primary Facility | 2014-05-20 | Drilling/Alteration | No Violations Noted | Patterson Rig 349 |
2274286 | Primary Facility | 2014-05-28 | Drilling/Alteration | No Violations Noted | Patterson Rig 349 |
2768814 | Primary Facility | 2018-08-29 | Routine/Complete Inspection | No Violations Noted | Well appears to be maintained and producing. Water in cellar. |
2824373 | Primary Facility | 2019-01-09 | Routine/Complete Inspection | No Violations Noted | On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed:
>>The operator representative reported plans to revisit the site to drill further wells. >>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review. >>The site was in generally good condition with no noted violations or concerns. |
2837704 | Primary Facility | 2019-02-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be well maintained and producing.
Cellar Tech/NOV auger rig on location to spud 7 new wells. |
2838458 | Primary Facility | 2019-02-07 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. |
For data sources see[8]