X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-113-20157"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-113-20157
 
| Well ID: 37-113-20157
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.517131, -76.466428 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.517131, -76.466428 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: R&N N SUL 3H
 
| Farm/Lease Name: R&N N SUL 3H
 
|-
 
|-
| License Status: Regulatory Inactive Status
+
| License Status: INACTIVE
 
|-
 
|-
| Spud Date: 05/21/2012
+
| Spud Date: 2012-05-22
 
|-
 
|-
| Permit Date: 5/10/2012
+
| Permit Date: 2012-05-10
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.517131
 
| Latitude: 41.517131
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Deviated
 +
|-
 +
| 2012-05-10
 +
| New Permit Application
 +
|-
 +
| 2012-05-21
 +
| Performed Spud Operation
 +
|-
 +
| 2012-08-08
 +
| Drilling Completion
 +
|-
 +
| 2014-12-03
 +
| New Permit Application
 +
|-
 +
| 2018-11-27
 +
| Inactive Well Request Granted
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 106: Line 175:
 
|-
 
|-
 
| 2017
 
| 2017
| [[CHESAPEAKE APPALACHIA LLC]]
+
| [[CHIEF OIL & GAS LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 133: Line 202:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 138: Line 208:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-2
+
| 2012
| Drill Cuttings (in Tons)
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align: right;" | 995.80 Tons
+
| Drill Cuttings
| LANDFILL
 
| 8-0728-0004/013
 
|-
 
| 2012-2
 
| Drill Cuttings (in Tons)
 
 
| style="text-align: right;" | 341.85 Tons
 
| style="text-align: right;" | 341.85 Tons
 
| LANDFILL
 
| LANDFILL
 
| THR029
 
| THR029
 
|-
 
|-
| 2012-2
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 92.91 Bbl
 
| style="text-align: right;" | 92.91 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018-11
+
| 2012
| Produced Fluid (in Barrels) RWC 802
+
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 995.80 Tons
 +
| LANDFILL
 +
| 8-0728-0004/013
 +
|-
 +
| 2018
 +
| [[CHIEF OIL & GAS LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2018-11
+
| 2018
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CHIEF OIL & GAS LLC]]
 +
| Synthetic Liner Materials
 
| style="text-align: right;" | 6.63 Tons
 
| style="text-align: right;" | 6.63 Tons
 
| LANDFILL
 
| LANDFILL
Line 187: Line 262:
 
| 2065310
 
| 2065310
 
| Primary Facility
 
| Primary Facility
| 05/02/2012
+
| 2012-05-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 194: Line 269:
 
| 2090705
 
| 2090705
 
| Primary Facility
 
| Primary Facility
| 08/09/2012
+
| 2012-08-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 201: Line 276:
 
| 2154980
 
| 2154980
 
| Primary Facility
 
| Primary Facility
| 03/29/2013
+
| 2013-03-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 208: Line 283:
 
| 2214206
 
| 2214206
 
| Primary Facility
 
| Primary Facility
| 10/09/2013
+
| 2013-10-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 215: Line 290:
 
| 2230503
 
| 2230503
 
| Primary Facility
 
| Primary Facility
| 12/18/2013
+
| 2013-12-18
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 222: Line 297:
 
| 2426863
 
| 2426863
 
| Primary Facility
 
| Primary Facility
| 11/18/2015
+
| 2015-11-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 311: Line 386:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 19:08, 15 May 2020

Well Details

Well ID: 37-113-20157
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Cherry Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 149137
Farm/Lease Name: R&N N SUL 3H
License Status: INACTIVE
Spud Date: 2012-05-22
Permit Date: 2012-05-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.517131
Longitude: -76.466428

For data sources see[1][2][3]

Well History

Date Event
Deviated
2012-05-10 New Permit Application
2012-05-21 Performed Spud Operation
2012-08-08 Drilling Completion
2014-12-03 New Permit Application
2018-11-27 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHESAPEAKE APPALACHIA LLC Drill Cuttings 341.85 Tons LANDFILL THR029
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 92.91 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Drill Cuttings 995.80 Tons LANDFILL 8-0728-0004/013
2018 CHIEF OIL & GAS LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials 6.63 Tons LANDFILL 301358

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2065310 Primary Facility 2012-05-02 Routine/Complete Inspection No Violations Noted
2090705 Primary Facility 2012-08-09 Drilling/Alteration No Violations Noted
2154980 Primary Facility 2013-03-29 Routine/Complete Inspection No Violations Noted
2214206 Primary Facility 2013-10-09 Routine/Complete Inspection No Violations Noted
2230503 Primary Facility 2013-12-18 Routine/Partial Inspection No Violations Noted
2426863 Primary Facility 2015-11-18 Routine/Complete Inspection No Violations Noted Arrived @ 14:20. Weather cloudy, cold and windy. There were two TD’d wells: R&N SW Sul 4H (regulatory inactive status), R&N N Sul 3H (regulatory inactive status). There was also a plugged conductor-only well: the R&N SE Sul 1H, and an additional 3 water-filled cellars.
2553022 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted Routine inspection conducted to assess general site conditions. No Chesapeake representatives were present.

Vegetative cover on site is greater than 70%, and temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

As indicated in Chesapeake's response to the Department's June 26, 2015 letter requesting the status of all facilities, a restoration extension request is to be filed for this location. As of the date of this inspection, no request for a restoration extension has been received by the Department of Environmental Protection.

No violations were cited during this inspection.

2657902 Primary Facility 2017-11-07 Routine/Complete Inspection No Violations Noted Two wells remain covered under regulatory Inactive Status. One well plugged. No production equipment on location. Pipeline run to location. Site not restored. No PCSM controls on location.
2696288 Primary Facility 2018-02-21 Routine/Complete Inspection No Violations Noted Arrived at 11:00. Weather: sunny and warm. This location recently changed ownership from Chesapeake to Chief as reflected by pad signs. There two TD'edwells: R&N SW Sul 4H (regulatory inactive status), R&N N Sul 3H (regulatory inactive status). There was also a plugged conductor-only well: the R&N SE Sul 1H, and an additional 3 water-filled cellars.

Sul 4H: 13-3/8" x 9-5/8": no combustible gas detected, 9-5/8" x 5-1/2": no combustible gas detected. Sul 1H:13-3/8" x 9-5/8": no combustible gas detected, 9-5/8" x 5-1/2": no combustible gas detected. Sul 1H:

2792006 Primary Facility 2018-10-18 Routine/Complete Inspection No Violations Noted Weather was 40° and sunny what time inspection. There were no chief representatives on location. We had no pressure gauges attached at time of inspection. Allied horizontal wireline was on location to perform bond logs. There were 2 annulus vents plumbed to surface. One was closed in and one (20x13) was open to atmosphere at time of inspection. 0% combustible gas was detected on the annulus vent or in the area immediately surrounding the well. The well tag was removed at time of inspection due to the work being performed however it did not have the wells corresponding API number on it. No violations were noted at time of inspection.
2803144 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 13:15; the weather was ~30°F and calm.

There was 1 plugged well and 2 regulatory inactive wells onsite. There were a total of 6 well cellars onsite. One cellar was filled with gravel while the others were filled with water; no bubbling was observed.

There was a pipeline run to the pad but no other production equipment was onsite. The pad was well vegetated and no E&S issues were noted.

According to Department records the ESCGP for this site expired on 3/20/17 and no NOT has been submitted. However, at the time of this inspection it appeared there were pending well permits.

It is recommended that the well tags be placed on the wells themselves.

No violations were noted at the time of inspection.

For data sources see[7]

References