X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-29860"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-29860
 
| Well ID: 37-063-29860
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.867804, -79.160348 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.867804, -79.160348 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[West Mahoning Township,_Indiana_County,_Pennsylvania|West Mahoning Township]]
 
| Municipality: [[West Mahoning Township,_Indiana_County,_Pennsylvania|West Mahoning Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 19: Line 19:
 
| Farm/Lease Name: EMMA E. YODER ETAL FM JAMES M. AUL 3
 
| Farm/Lease Name: EMMA E. YODER ETAL FM JAMES M. AUL 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 09/27/1989
+
| Spud Date: 1989-09-27
 
|-
 
|-
| Permit Date: 9/18/1989
+
| Permit Date: 1989-09-18
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.867804
 
| Latitude: 40.867804
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1989-09-18
 +
| New Permit Application
 +
|-
 +
| 1989-09-27
 +
| Performed Spud Operation
 +
|-
 +
| 1989-10-01
 +
| Drilling Completion
 +
|-
 +
| 1989-10-06
 +
| Perforation
 +
|-
 +
| 1989-11-29
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 59: Line 125:
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
!scope="col" | Water Production Days
 +
|-
 +
| 1991
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 4389.00
 +
| style="text-align: right;" | 63
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 6,772.00
+
| style="text-align: right;" | 6772.00
 
| style="text-align: right;" | 112
 
| style="text-align: right;" | 112
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 1994
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 13870.00
 +
| style="text-align: right;" | 266
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 6864.00
 +
| style="text-align: right;" | 131
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 12,463.00
+
| style="text-align: right;" | 12463
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 7,483.00
+
| style="text-align: right;" | 7483
 
| style="text-align: right;" | 194
 
| style="text-align: right;" | 194
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
Line 92: Line 185:
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 7,999.00
+
| style="text-align: right;" | 7999
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
Line 110: Line 203:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 5,610.00
+
| style="text-align: right;" | 5610
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 5,487.00
+
| style="text-align: right;" | 5487
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 357
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 5,351.00
+
| style="text-align: right;" | 5351
 +
| style="text-align: right;" | 252
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |
+
| style="text-align: right;" | 0
| style="text-align: right;" | 0.00
 
| style="text-align: right;" |
 
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 6,019.00
+
| style="text-align: right;" | 6019
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 333
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 155: Line 248:
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 321
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 164: Line 257:
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 362
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 4,314.00
+
| style="text-align: right;" | 4314.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 4,729.00
+
| style="text-align: right;" | 4729.00
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[PHILLIPS EXPLORATION INC]]
 
| [[PHILLIPS EXPLORATION INC]]
| style="text-align: right;" | 3,947.00
+
| style="text-align: right;" | 3947.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 293:
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 344
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 302:
 
| style="text-align: right;" | 263
 
| style="text-align: right;" | 263
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 311:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 320:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 329:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 338:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 254: Line 347:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 1,651.00
 
| style="text-align: right;" | 1,651.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
| [[ALLIANCE PETROLEUM CO LLC]]
+
| [[ALLIANCE PETRO CO LLC]]
 
| style="text-align: right;" | 2,569.00
 
| style="text-align: right;" | 2,569.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 274: Line 367:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 286: Line 379:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 291: Line 385:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[PHILLIPS EXPLORATION INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 297: Line 392:
 
|  
 
|  
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 62 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 62.00 Bbl
 
| style="text-align: right;" | 62.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2016-0
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 11.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 11 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 9.00 Bbl
 
| style="text-align: right;" | 9.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 9 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0095273
 
| PA0095273
 
|-
 
|-
Line 377: Line 502:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 19:26, 15 May 2020

Well Details

Well ID: 37-063-29860
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: EMMA E. YODER ETAL FM JAMES M. AUL 3
License Status: ACTIVE
Spud Date: 1989-09-27
Permit Date: 1989-09-18
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.867804
Longitude: -79.160348

For data sources see[1][2][3]

Well History

Date Event
1989-09-18 New Permit Application
1989-09-27 Performed Spud Operation
1989-10-01 Drilling Completion
1989-10-06 Perforation
1989-11-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 PHILLIPS EXPLORATION INC 4389.00 63 0.00 0 0.00 0
1993 PHILLIPS EXPLORATION INC 6772.00 112 0.00 0 0.00 0
1994 PHILLIPS EXPLORATION INC 13870.00 266 0.00 0 0.00 0
1995 PHILLIPS EXPLORATION INC 6864.00 131 0.00 0 0.00 0
1996 PHILLIPS EXPLORATION INC 12463 365 0.00 0 0.00 0
1997 PHILLIPS EXPLORATION INC 7483 194 0.00 0 0.00 0
1998 PHILLIPS EXPLORATION INC 10,544.00 333 0.00 0 0.00 0
1999 PHILLIPS EXPLORATION INC 7999 333 0.00 0 0.00 0
2000 PHILLIPS EXPLORATION INC 6,386.00 365 0.00 0 0.00 0
2001 PHILLIPS EXPLORATION INC 5610 334 0.00 0 0.00 0
2002 PHILLIPS EXPLORATION INC 5487 357 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 5351 252 0 252 0.00 0
2004 PHILLIPS EXPLORATION INC 6019 333 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 5,389.00 321 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 5,061.00 362 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 4314.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 4729.00 344 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 3947.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 4,459.00 344 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 3,623.00 263 0.00 0 0.00 0
2012 XTO ENERGY INC 3,767.00 361 0.00 0 0.00 0
2013 XTO ENERGY INC 3,062.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 2,666.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 2,773.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 2,575.80 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,651.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 2,569.00 365 9.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 PHILLIPS EXPLORATION INC Brine 60.00 Bbl Brine or Industrial Waste Treatment Plt
2013 XTO ENERGY INC Produced Fluid 62 Bbl CENT WASTE TRT FAC NPDES PA0095443
2013 XTO ENERGY INC Produced Fluid 62.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 XTO ENERGY INC Produced Fluid 11.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 XTO ENERGY INC Produced Fluid 11 Bbl CENT WASTE TRT FAC NPDES PA0095443
2016 XTO ENERGY INC Produced Fluid 9.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 XTO ENERGY INC Produced Fluid 9 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
539905 Primary Facility 1989-11-16 Routine/Complete Inspection No Violations Noted RESTORING; E&S OK
553823 Primary Facility 1990-11-23 Site Restoration No Violations Noted SITE RESTORED; TANK
554628 Primary Facility 1991-01-18 Routine/Complete Inspection No Violations Noted NOT DRILLED; CANCEL

For data sources see[7]

References