X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-33049"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-33049
 
| Well ID: 37-063-33049
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.877648, -79.208518 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.877648, -79.208518 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BRICKLEMYER 2
 
| Farm/Lease Name: BRICKLEMYER 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 05/30/2002
+
| Spud Date: 2002-05-31
 
|-
 
|-
| Permit Date: 3/22/2002
+
| Permit Date: 2002-03-22
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.877648
 
| Latitude: 40.877648
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-03-22
 +
| New Permit Application
 +
|-
 +
| 2002-05-30
 +
| Performed Spud Operation
 +
|-
 +
| 2002-06-02
 +
| Drilling Completion
 +
|-
 +
| 2002-06-19
 +
| Perforation
 +
|-
 +
| 2003-02-27
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 2001
 
| 2001
| style="text-align: right;" |
+
| [[DANNIC ENERGY CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| style="text-align: right;" | 7,884.00
+
| style="text-align: right;" | 7884
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 83: Line 149:
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 182
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 92: Line 158:
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 245
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 101: Line 167:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[DANNIC ENERGY CORP]]
 
| [[DANNIC ENERGY CORP]]
| style="text-align: right;" | 5,458.00
+
| style="text-align: right;" | 5457.58
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 119: Line 185:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 128: Line 194:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 137: Line 203:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 146: Line 212:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 155: Line 221:
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 305
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 164: Line 230:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 173: Line 239:
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 182: Line 248:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 191: Line 257:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 200: Line 266:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 275:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[DANNIC ENERGY CORP]]
 +
| style="text-align: right;" | 2,708.99
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 298:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 304:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2003-0
+
| 2003
 +
| [[DANNIC ENERGY CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 234: Line 311:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2010-0
+
| 2010
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2012-0
+
| 2012
| Produced Fluid (in Barrels)
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PA0020346
 
| PA0020346
 
|-
 
|-
| 2017-0
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[DANNIC ENERGY CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 291: Line 371:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 23:13, 15 May 2020

Well Details

Well ID: 37-063-33049
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Mahoning Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: BRICKLEMYER 2
License Status: ACTIVE
Spud Date: 2002-05-31
Permit Date: 2002-03-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.877648
Longitude: -79.208518

For data sources see[1][2][3]

Well History

Date Event
2002-03-22 New Permit Application
2002-05-30 Performed Spud Operation
2002-06-02 Drilling Completion
2002-06-19 Perforation
2003-02-27 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2003 DANNIC ENERGY CORP 7884 365 0.00 0 0.00 0
2004 DANNIC ENERGY CORP 3,121.00 182 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 4,943.00 245 0.00 0 0.00 0
2006 DANNIC ENERGY CORP 4,751.00 365 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 5457.58 365 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 4,036.66 365 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 3,638.36 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 3,422.33 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 2,674.73 304 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 2,598.68 305 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 2,374.98 304 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 1,922.00 304 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 1,977.56 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 2,815.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 2,217.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 2,639.85 365 0.00 0 0.00 0
2019 DANNIC ENERGY CORP 2,708.99 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 DANNIC ENERGY CORP Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2010 DANNIC ENERGY CORP Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2012 DANNIC ENERGY CORP Produced Fluid 40.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2017 DANNIC ENERGY CORP Produced Fluid 40.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

References