X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22509"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-22509
 
| Well ID: 37-115-22509
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.772003, -75.675975 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.772003, -75.675975 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PAYNE D 14
 
| Farm/Lease Name: PAYNE D 14
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 08/06/2018
+
| Spud Date: 2018-08-07
 
|-
 
|-
| Permit Date: 4/25/2018
+
| Permit Date: 2018-04-25
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.772003
 
| Latitude: 41.772003
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|
 +
| Deviated
 +
|-
 +
| 2018-04-25
 +
| New Permit Application
 +
|-
 +
| 2018-08-06
 +
| Performed Spud Operation
 +
|-
 +
| 2019-03-20
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 125:
 
| 2019
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 361,790.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 163
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 79: Line 142:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 84: Line 148:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-08
+
| 2018
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 4.01 Tons
+
| Synthetic Liner Materials
 +
| style="text-align: right;" | 5.23 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-09
+
| 2018
| Drill Cuttings (in Tons) RWC 810
+
| [[CABOT OIL & GAS CORP]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 378.02 Tons
 
| style="text-align: right;" | 378.02 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-09
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.88 Tons
+
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 33.75 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 835.21 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2018-10
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.34 Tons
+
| Synthetic Liner Materials
 +
| style="text-align: right;" | 18.62 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2019-01
+
| 2019
| Synthetic Liner Materials (in Tons) RWC 806
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 0.34 Tons
+
| Produced Fluid
 +
| style="text-align: right;" | 15,929.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE004
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Unused Fracturing Fluid Waste
 +
| style="text-align: right;" | 4.74 Tons
 
| LANDFILL
 
| LANDFILL
 
| 101247
 
| 101247
 
|-
 
|-
| 2019-03
+
| 2019
| Drill Cuttings (in Tons) RWC 810
+
| [[CABOT OIL & GAS CORP]]
| style="text-align: right;" | 835.21 Tons
+
| Produced Fluid
| LANDFILL
+
| style="text-align: right;" | 7,239.82 Bbl
| 101247
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 0.09 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301333
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 0.67 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101714
 
|-
 
|-
 
|}
 
|}
Line 201: Line 299:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 00:20, 16 May 2020

Well Details

Well ID: 37-115-22509
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149723
Farm/Lease Name: PAYNE D 14
License Status:
Spud Date: 2018-08-07
Permit Date: 2018-04-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.772003
Longitude: -75.675975

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-04-25 New Permit Application
2018-08-06 Performed Spud Operation
2019-03-20 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 361,790.00 163 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 5.23 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 378.02 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 33.75 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Drill Cuttings 835.21 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 18.62 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 15,929.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 4.74 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 7,239.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.67 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2762387 Primary Facility 2018-08-10 Drilling/Alteration No Violations Noted At time of inspection.

On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and set the conductor pipe on the 1H, 4H, 5H, 6H, 7H, 9H, 10H, 12H and 14H wells. All the conductor pipes were set at 92' and Halliburton was on site and cementing them in. The 4H and 5H were cemented and they were on the 6H when I arrived on site. They plan to cement all the wells today. There was a new sign with the permit numbers put at the entrance, the new permit numbers were correct. There are three existing wells on site, the 2H, 3H and 8H. The permit number for the 2H was correct, the 3H was incorrect and there was no permit number for the 8H. The permit numbers were on the entrance sign and correct during prier inspections. David updated the sign before I left the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted

2778754 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Will Dean. 03:41 PD 181 was on site to drill and set the surface and intermediate casings. There are three existing wells on site that are temporarily plugged and there are nine new wells on site to be drilled. They are on the fifth of the nine wells. They were rigged up on the 10H and waiting on cement for the surface casing. They bumped the plug at 03:41 a.m., mandatory 8hrs will be 11:41 a.m. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[7]

References