If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-115-22554 | | Well ID: 37-115-22554 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.727717, -75.989231 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: POWERS M 006 | | Farm/Lease Name: POWERS M 006 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2018-10-02 | | Permit Date: 2018-10-02 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
|- | |- | ||
| Configuration: Horizontal Well | | Configuration: Horizontal Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 41.727717 | | Latitude: 41.727717 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2018-10-02 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2019-02-27 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2019-06-06 | ||
+ | | MOD | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 95: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 104: | Line 139: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 109: | Line 145: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2019- | + | | 2019 |
− | | Synthetic Liner Materials | + | | [[CABOT OIL & GAS CORP]] |
− | | style="text-align: right;" | | + | | Drill Cuttings |
+ | | style="text-align: right;" | 1,886.03 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 276.25 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | Synthetic Liner Materials | ||
+ | | style="text-align: right;" | 11.56 Tons | ||
| LANDFILL | | LANDFILL | ||
| 101247 | | 101247 |
Well ID: 37-115-22554 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.727717,"lon":-75.989231,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155477 | |
Farm/Lease Name: POWERS M 006 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-10-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.727717 | |
Longitude: -75.989231 |
Date | Event |
---|---|
2018-10-02 | New Permit Application |
2019-02-27 | Performed Spud Operation |
2019-06-06 | MOD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,886.03 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 276.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 11.56 Tons | LANDFILL | 101247 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2850813 | Primary Facility | 2019-03-08 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection, accompanied by Eric Miller (OGI trainee for the Department). There were 8 wells on site with conductors drilled and set at 92'. Minichi Contracting Group was on site and drilled the 1H, 10H, 12H and 14H wells. United drilling was on site and drilled the 2H, 4H, 6H and 8H wells. We took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2851073 | Primary Facility | 2019-02-26 | Preoperation Inspection | No Violations Noted | I arrived onsite at 1315 to perform a pre-operational inspection of the well pad and tank farm. The purpose of this inspection was to ensure all perimeter BMPs were installed onsite before earth disturbance activities began the following day. Upon my arrival onsite, I was greeted by Mike Murnin (Cabot Oil and Gas-Construction Foreman).
Mr. Murnin stated that grading and tracking of the well pad site was in progress during the inspection. Construction of the nearby tank farm had just started; equipment had been mobilized the previous day and topsoil stripping was underway at the time of inspection. Mr. Murnin also stated that the tank pad LOD and well pad LOD will eventually be joined, however the stream encroachment permit is still being reviewed. Until that permit is approved, the LODs remain separate. Furthermore, the plan indicates that a filter sock should be installed in the area of the stream encroachment where the two LODs will eventually join. However, since the encroachment permit has not yet bee |
For data sources see[7]