X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-23441"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-23441
 
| Well ID: 37-129-23441
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.529880, -79.520703 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.529880, -79.520703 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: DOVERSPIKE/P.N.G. 1
 
| Farm/Lease Name: DOVERSPIKE/P.N.G. 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1991-11-19
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 1991-10-30
 
| Permit Date: 1991-10-30
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.529880
 
| Latitude: 40.529880
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1991-01-16
 +
| Drilling Completion
 +
|-
 +
| 1991-10-30
 +
| New Permit Application
 +
|-
 +
| 1991-11-19
 +
| Performed Spud Operation
 +
|-
 +
| 1992-03-18
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 84: Line 122:
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
!scope="col" | Water Production Days
 +
|-
 +
| 1994
 +
| [[VICTORY DEV CO]]
 +
| style="text-align: right;" | 2843.00
 +
| style="text-align: right;" | 245
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 1,594.00
+
| style="text-align: right;" | 1594
 
| style="text-align: right;" | 188
 
| style="text-align: right;" | 188
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 143:
 
| 1997
 
| 1997
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,564.00
+
| style="text-align: right;" | 2564
 
| style="text-align: right;" | 282
 
| style="text-align: right;" | 282
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 152:
 
| 1998
 
| 1998
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,831.00
+
| style="text-align: right;" | 2831
 
| style="text-align: right;" | 313
 
| style="text-align: right;" | 313
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 161:
 
| 1999
 
| 1999
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,242.00
+
| style="text-align: right;" | 2242
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 123: Line 170:
 
| 2001
 
| 2001
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 1,939.00
+
| style="text-align: right;" | 1939
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 132: Line 179:
 
| 2002
 
| 2002
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 1,135.95
+
| style="text-align: right;" | 1135.95
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 141: Line 188:
 
| 2003
 
| 2003
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 1,442.88
+
| style="text-align: right;" | 1442.88
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 150: Line 197:
 
| 2004
 
| 2004
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,513.41
+
| style="text-align: right;" | 2513.41
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 159: Line 206:
 
| 2005
 
| 2005
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,779.37
+
| style="text-align: right;" | 2779.37
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 168: Line 215:
 
| 2006
 
| 2006
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 3,310.00
+
| style="text-align: right;" | 3310.00
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 177: Line 224:
 
| 2007
 
| 2007
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 3,418.00
+
| style="text-align: right;" | 3418
 
| style="text-align: right;" | 348
 
| style="text-align: right;" | 348
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 186: Line 233:
 
| 2008
 
| 2008
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 2,776.10
+
| style="text-align: right;" | 2776.10
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 346
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 195: Line 242:
 
| 2009
 
| 2009
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| style="text-align: right;" | 1,999.51
+
| style="text-align: right;" | 1999.51
 
| style="text-align: right;" | 319
 
| style="text-align: right;" | 319
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 315: Line 362:
 
| 2011
 
| 2011
 
| [[VICTORY ENERGY CORP]]
 
| [[VICTORY ENERGY CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 52.00 Bbl
 
| style="text-align: right;" | 52.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
| STORAGE PENDING DISPOSAL OR REUSE

Latest revision as of 04:34, 16 May 2020

Well Details

Well ID: 37-129-23441
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Bell Township
Operator Name: VEC ENERGY LLC
Well Pad ID:
Farm/Lease Name: DOVERSPIKE/P.N.G. 1
License Status: ACTIVE
Spud Date:
Permit Date: 1991-10-30
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.529880
Longitude: -79.520703

For data sources see[1][2][3]

Well History

Date Event
1991-01-16 Drilling Completion
1991-10-30 New Permit Application
1991-11-19 Performed Spud Operation
1992-03-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1994 VICTORY DEV CO 2843.00 245 0.00 0 0.00 0
1996 VICTORY ENERGY CORP 1594 188 0.00 0 0.00 0
1997 VICTORY ENERGY CORP 2564 282 0.00 0 0.00 0
1998 VICTORY ENERGY CORP 2831 313 0.00 0 0.00 0
1999 VICTORY ENERGY CORP 2242 330 0.00 0 0.00 0
2001 VICTORY ENERGY CORP 1939 365 0.00 0 0.00 0
2002 VICTORY ENERGY CORP 1135.95 365 0.00 0 0.00 0
2003 VICTORY ENERGY CORP 1442.88 365 0.00 0 0.00 0
2004 VICTORY ENERGY CORP 2513.41 365 0.00 0 0.00 0
2005 VICTORY ENERGY CORP 2779.37 360 0.00 0 0.00 0
2006 VICTORY ENERGY CORP 3310.00 300 0.00 0 0.00 0
2007 VICTORY ENERGY CORP 3418 348 0.00 0 0.00 0
2008 VICTORY ENERGY CORP 2776.10 346 0.00 0 0.00 0
2009 VICTORY ENERGY CORP 1999.51 319 0.00 0 0.00 0
2010 VICTORY ENERGY CORP 1,970.26 267 0.00 0 0.00 0
2011 VICTORY ENERGY CORP 2,665.15 243 0.00 0 0.00 0
2012 SNYDER BROS INC 2,424.00 270 0.00 0 0.00 0
2013 SNYDER BROS INC 2,125.60 291 0.00 0 0.00 0
2014 SNYDER BROS INC 1,734.63 257 0.00 0 0.00 0
2015 SNYDER BROS INC 1,149.98 208 0.00 0 0.00 0
2016 SNYDER BROS INC 849.83 137 0.00 0 0.00 0
2017 SNYDER BROS INC 905.83 122 0.00 0 0.00 0
2018 VEC ENERGY LLC 767.00 317 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1999 VICTORY ENERGY CORP Brine 70.00 Bbl Road Spreading UNK
2005 VICTORY ENERGY CORP Brine 40.00 Bbl Road Spreading
2011 VICTORY ENERGY CORP Produced Fluid 52.00 Bbl STORAGE PENDING DISPOSAL OR REUSE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2481596 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears structurally sound. No E&S issues in relation to site and/or access road.

For data sources see[7]

References