X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24543"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24543
 
| Well ID: 37-129-24543
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.228424, -79.382574 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.228424, -79.382574 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: M A W C 1-R-2
 
| Farm/Lease Name: M A W C 1-R-2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 09/23/2001
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 8/9/2001
+
| Permit Date: 2001-08-09
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.228424
 
| Latitude: 40.228424
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2001-08-09
 +
| New Permit Application
 +
|-
 +
| 2001-09-23
 +
| Performed Spud Operation
 +
|-
 +
| 2001-10-15
 +
| Drilling Completion
 +
|-
 +
| 2001-11-07
 +
| Perforation
 +
|-
 +
| 2002-09-16
 +
| NEWLY DRILLED
 +
|-
 +
| 2002-11-20
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 130:
 
|-
 
|-
 
| 2001
 
| 2001
| style="text-align: right;" |
+
| [[OIL & GAS MGMT INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[OIL & GAS MGMT INC]]
 
| [[OIL & GAS MGMT INC]]
| style="text-align: right;" | 6,633.00
+
| style="text-align: right;" | 6633
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[OIL & GAS MGMT INC]]
 
| [[OIL & GAS MGMT INC]]
| style="text-align: right;" | 1,255.00
+
| style="text-align: right;" | 1255
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[OIL & GAS MGMT INC]]
 
| [[OIL & GAS MGMT INC]]
| style="text-align: right;" | 733.00
+
| style="text-align: right;" | 733
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[OIL & GAS MGMT INC]]
 
| [[OIL & GAS MGMT INC]]
| style="text-align: right;" | 604.00
+
| style="text-align: right;" | 604
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 110: Line 179:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 119: Line 188:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 128: Line 197:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 137: Line 206:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 146: Line 215:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 155: Line 224:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 164: Line 233:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 173: Line 242:
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 210
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 182: Line 251:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 191: Line 260:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 200: Line 269:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 278:
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 275
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 292:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 298:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2001-A00
+
| 2001
 +
| [[OIL & GAS MGMT INC]]
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 1,658.00 Bbl
 
| style="text-align: right;" | 1,658.00 Bbl
Line 234: Line 305:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2001-A00
+
| 2001
 +
| [[OIL & GAS MGMT INC]]
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 107.00 Bbl
 
| style="text-align: right;" | 107.00 Bbl
Line 240: Line 312:
 
| PA0026034
 
| PA0026034
 
|-
 
|-
| 2002-A00
+
| 2002
 +
| [[OIL & GAS MGMT INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 253.50 Bbl
 
| style="text-align: right;" | 253.50 Bbl
Line 246: Line 319:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2003-A00
+
| 2003
 +
| [[OIL & GAS MGMT INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 344.00 Bbl
 
| style="text-align: right;" | 344.00 Bbl
Line 252: Line 326:
 
|  
 
|  
 
|-
 
|-
| 2003-A00
+
| 2003
 +
| [[OIL & GAS MGMT INC]]
 
| Fracking Fluid
 
| Fracking Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 258: Line 333:
 
|  
 
|  
 
|-
 
|-
| 2010-A00
+
| 2010
| Produced Fluid (in Barrels)
+
| [[OIL & GAS MGMT INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 50.00 Bbl
 
| style="text-align: right;" | 50.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 283: Line 359:
 
| 1050925
 
| 1050925
 
| Primary Facility
 
| Primary Facility
| 07/30/2001
+
| 2001-07-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 290: Line 366:
 
| 1062695
 
| 1062695
 
| Primary Facility
 
| Primary Facility
| 09/25/2001
+
| 2001-09-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Administratively Closed
 
| Administratively Closed
Line 297: Line 373:
 
| 1062788
 
| 1062788
 
| Primary Facility
 
| Primary Facility
| 09/26/2001
+
| 2001-09-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 304: Line 380:
 
| 1064164
 
| 1064164
 
| Primary Facility
 
| Primary Facility
| 10/02/2001
+
| 2001-10-02
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 311: Line 387:
 
| 1081754
 
| 1081754
 
| Primary Facility
 
| Primary Facility
| 12/06/2001
+
| 2001-12-06
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 318: Line 394:
 
| 1116882
 
| 1116882
 
| Primary Facility
 
| Primary Facility
| 04/18/2002
+
| 2002-04-18
 
| Complaint Inspection
 
| Complaint Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 325: Line 401:
 
| 1116946
 
| 1116946
 
| Primary Facility
 
| Primary Facility
| 04/19/2002
+
| 2002-04-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 332: Line 408:
 
| 1120200
 
| 1120200
 
| Primary Facility
 
| Primary Facility
| 05/03/2002
+
| 2002-05-03
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 339: Line 415:
 
| 1157056
 
| 1157056
 
| Primary Facility
 
| Primary Facility
| 08/05/2002
+
| 2002-08-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 346: Line 422:
 
| 1184539
 
| 1184539
 
| Primary Facility
 
| Primary Facility
| 11/04/2002
+
| 2002-11-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 353: Line 429:
 
| 1195532
 
| 1195532
 
| Primary Facility
 
| Primary Facility
| 12/20/2002
+
| 2002-12-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 360: Line 436:
 
| 1223441
 
| 1223441
 
| Primary Facility
 
| Primary Facility
| 04/03/2003
+
| 2003-04-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 367: Line 443:
 
| 1254221
 
| 1254221
 
| Primary Facility
 
| Primary Facility
| 07/17/2003
+
| 2003-07-17
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 374: Line 450:
 
| 1268225
 
| 1268225
 
| Primary Facility
 
| Primary Facility
| 09/09/2003
+
| 2003-09-09
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 381: Line 457:
 
| 1268254
 
| 1268254
 
| Primary Facility
 
| Primary Facility
| 08/20/2003
+
| 2003-08-20
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 388: Line 464:
 
| 1930290
 
| 1930290
 
| Primary Facility
 
| Primary Facility
| 11/03/2010
+
| 2010-11-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 395: Line 471:
 
| 2369025
 
| 2369025
 
| Primary Facility
 
| Primary Facility
| 05/01/2015
+
| 2015-05-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 414: Line 490:
 
| 285800
 
| 285800
 
| 09/26/2001
 
| 09/26/2001
| 12/06/2001
+
| 2001-09-26
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 422: Line 498:
 
| 285801
 
| 285801
 
| 09/26/2001
 
| 09/26/2001
| 12/06/2001
+
| 2001-09-26
 
| 201E - Failure to comply with terms and conditions of permit
 
| 201E - Failure to comply with terms and conditions of permit
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 430: Line 506:
 
| 303214
 
| 303214
 
| 04/18/2002
 
| 04/18/2002
| 05/03/2002
+
| 2002-04-18
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 438: Line 514:
 
| 303215
 
| 303215
 
| 04/18/2002
 
| 04/18/2002
| 05/03/2002
+
| 2002-04-18
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 446: Line 522:
 
| 303231
 
| 303231
 
| 04/19/2002
 
| 04/19/2002
| 05/03/2002
+
| 2002-04-19
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 454: Line 530:
 
| 330773
 
| 330773
 
| 12/20/2002
 
| 12/20/2002
| 01/21/2003
+
| 2002-12-20
 
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
| Administrative
 
| Administrative
Line 462: Line 538:
 
| 344972
 
| 344972
 
| 04/03/2003
 
| 04/03/2003
| 09/09/2003
+
| 2003-04-03
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 470: Line 546:
 
| 344973
 
| 344973
 
| 04/03/2003
 
| 04/03/2003
| 08/20/2003
+
| 2003-04-03
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 478: Line 554:
 
| 358096
 
| 358096
 
| 07/17/2003
 
| 07/17/2003
| 09/09/2003
+
| 2003-07-17
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 486: Line 562:
 
| 358097
 
| 358097
 
| 07/17/2003
 
| 07/17/2003
| 09/09/2003
+
| 2003-07-17
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 494: Line 570:
 
| 358098
 
| 358098
 
| 07/17/2003
 
| 07/17/2003
| 08/20/2003
+
| 2003-07-17
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 502: Line 578:
 
| 364046
 
| 364046
 
| 08/20/2003
 
| 08/20/2003
| 09/09/2003
+
| 2003-08-20
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 523: Line 599:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/06/2002
+
| 2002-12-06
| 12/13/2002
+
| 2002-12-13
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
Line 533: Line 609:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/06/2001
+
| 2001-12-06
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 541: Line 617:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/06/2002
+
| 2002-12-06
| 12/13/2002
+
| 2002-12-13
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
Line 551: Line 627:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/06/2001
+
| 2001-12-06
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 559: Line 635:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/06/2002
+
| 2002-12-06
| 12/13/2002
+
| 2002-12-13
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
Line 569: Line 645:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/03/2002
+
| 2002-05-03
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 577: Line 653:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/06/2002
+
| 2002-12-06
| 12/13/2002
+
| 2002-12-13
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
Line 587: Line 663:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 05/03/2002
+
| 2002-05-03
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 595: Line 671:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/06/2002
+
| 2002-12-06
| 12/13/2002
+
| 2002-12-13
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
 
| style="text-align: right;" | $4,700.00
Line 605: Line 681:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/21/2003
+
| 2003-01-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 614: Line 690:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 622: Line 698:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 632: Line 708:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 640: Line 716:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 650: Line 726:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 658: Line 734:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 668: Line 744:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 676: Line 752:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 686: Line 762:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 694: Line 770:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 703: Line 779:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/21/2004
+
| 2004-04-21
| 04/22/2004
+
| 2004-04-22
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
 
| style="text-align: right;" | $3,200.00
Line 715: Line 791:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 06:30, 16 May 2020

Well Details

Well ID: 37-129-24543
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Unity Township
Operator Name: OIL & GAS MGMT INC
Well Pad ID:
Farm/Lease Name: M A W C 1-R-2
License Status: ACTIVE
Spud Date:
Permit Date: 2001-08-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.228424
Longitude: -79.382574

For data sources see[1][2][3]

Well History

Date Event
2001-08-09 New Permit Application
2001-09-23 Performed Spud Operation
2001-10-15 Drilling Completion
2001-11-07 Perforation
2002-09-16 NEWLY DRILLED
2002-11-20 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 OIL & GAS MGMT INC 0.00 0 0.00 0 0.00 0
2002 OIL & GAS MGMT INC 6633 365 0.00 0 0.00 0
2003 OIL & GAS MGMT INC 1255 365 0.00 0 0.00 0
2004 OIL & GAS MGMT INC 733 365 0.00 0 0.00 0
2005 OIL & GAS MGMT INC 604 365 0.00 0 0.00 0
2006 OIL & GAS MGMT INC 610.00 365 0.00 0 0.00 0
2007 OIL & GAS MGMT INC 516.00 365 0.00 0 0.00 0
2008 OIL & GAS MGMT INC 369.00 365 0.00 0 0.00 0
2009 OIL & GAS MGMT INC 474.00 365 0.00 0 0.00 0
2010 OIL & GAS MGMT INC 410.00 365 0.00 0 0.00 0
2011 OIL & GAS MGMT INC 430.00 365 0.00 0 0.00 0
2012 OIL & GAS MGMT INC 330.00 366 0.00 0 0.00 0
2014 OIL & GAS MGMT INC 179.00 210 0.00 0 0.00 0
2015 OIL & GAS MGMT INC 191.00 365 0.00 0 0.00 0
2016 OIL & GAS MGMT INC 184.00 335 0.00 0 0.00 0
2017 OIL & GAS MGMT INC 113.00 335 0.00 0 0.00 0
2018 OIL & GAS MGMT INC 112.00 275 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2001 OIL & GAS MGMT INC Drilling 1,658.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2001 OIL & GAS MGMT INC Drilling 107.00 Bbl Municipal Sewage Treatment Plant PA0026034
2002 OIL & GAS MGMT INC Brine 253.50 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2003 OIL & GAS MGMT INC Brine 344.00 Bbl Brine or Industrial Waste Treatment Plt
2003 OIL & GAS MGMT INC Fracking Fluid 80.00 Bbl Brine or Industrial Waste Treatment Plt
2010 OIL & GAS MGMT INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1050925 Primary Facility 2001-07-30 Routine/Complete Inspection No Violations Noted Staked/stream waiver review - ok
1062695 Primary Facility 2001-09-25 Drilling/Alteration Administratively Closed Well spudded by Union Drilling Co., rig 45, on 9/23/01. Drilling 17 1/2" hole at 176'. Communication between hole and 25' rat hole! Failure to implement E & S plan (waiver)., refered to Ed Renwick, water quality specialist.
1062788 Primary Facility 2001-09-26 Routine/Complete Inspection Violation(s) Noted drilling/pit&ID ok/E&S plan ok/plan not implemented
1064164 Primary Facility 2001-10-02 Drilling/Alteration No Violations Noted Replacing BOP at 1566'. I.D., pit, E & S, ok.
1081754 Primary Facility 2001-12-06 Compliance Evaluation No Violations Noted drilling complete - not equipped/site backfilling in progress/E&S controls in place
1116882 Primary Facility 2002-04-18 Complaint Inspection Violation(s) Noted equipped/tanks&ID ok/E&S inadequate - silt discharge to stream
1116946 Primary Facility 2002-04-19 Routine/Complete Inspection Outstanding Violations - Viols Req'd temporary E&S measures installed - more permanent controls needed ASAP
1120200 Primary Facility 2002-05-03 Compliance Evaluation No Violations Noted equipped/tank&tag ok/site graded - seeded - mulched
1157056 Primary Facility 2002-08-05 Routine/Complete Inspection No Violations Noted equipped/E&S advice/tank&tag ok
1184539 Primary Facility 2002-11-04 Routine/Complete Inspection No Violations Noted on-site meeting with operator&consultant/E&S plan - waiver review - ok'd with no tophole H2O disch.
1195532 Primary Facility 2002-12-20 Drilling/Alteration Violation(s) Noted Union Drilling Co., drilling 8 3/4" diverted ( 15 degrees) at 5602'. No 24 hour notification. I.D., pit ( 10 ml), E & S, ok.
1223441 Primary Facility 2003-04-03 Routine/Complete Inspection Violation(s) Noted Less 2' of freesboard maintained. E & S controls not maintained.
1254221 Primary Facility 2003-07-17 Compliance Evaluation Violation(s) Noted equipped/tank ok/<2ft freeboard - pit/E&S well site/no well tag
1268225 Primary Facility 2003-09-09 Compliance Evaluation No Violations Noted equipped/E&S ok/tank ok/tag advice - wrong #
1268254 Primary Facility 2003-08-20 Compliance Evaluation Violation(s) Noted on-site meeting with operator to discuss E&S measures needed to stabilize site - will contact DEP upon completion
1930290 Primary Facility 2010-11-03 Routine/Complete Inspection No Violations Noted RECLAIMED, VEGETATED, AND 100BBL ON SITE
2369025 Primary Facility 2015-05-01 Routine/Complete Inspection No Violations Noted RECLAIMED, VEGETATED, AND 100BBL ON SITE

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1062788 285800 09/26/2001 2001-09-26 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1062788 285801 09/26/2001 2001-09-26 201E - Failure to comply with terms and conditions of permit Environmental Health & Safety
1116882 303214 04/18/2002 2002-04-18 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1116882 303215 04/18/2002 2002-04-18 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety
1116946 303231 04/19/2002 2002-04-19 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1195532 330773 12/20/2002 2002-12-20 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative
1223441 344972 04/03/2003 2003-04-03 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1223441 344973 04/03/2003 2003-04-03 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1254221 358096 07/17/2003 2003-07-17 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1254221 358097 07/17/2003 2003-07-17 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1254221 358098 07/17/2003 2003-07-17 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1268254 364046 08/20/2003 2003-08-20 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
285800 113963 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-12-06 2002-12-13 $4,700.00 $4,700.00
285800 82898 NOV - Notice of Violation Comply/Closed 2001-12-06
285801 113963 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-12-06 2002-12-13 $4,700.00 $4,700.00
285801 82898 NOV - Notice of Violation Comply/Closed 2001-12-06
303214 113963 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-12-06 2002-12-13 $4,700.00 $4,700.00
303214 95176 NOV - Notice of Violation Comply/Closed 2002-05-03
303215 113963 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-12-06 2002-12-13 $4,700.00 $4,700.00
303215 95176 NOV - Notice of Violation Comply/Closed 2002-05-03
303231 113963 CACP - Consent Assessment of Civil Penalty Comply/Closed 2002-12-06 2002-12-13 $4,700.00 $4,700.00
330773 107363 NOV - Notice of Violation Comply/Closed 2003-01-21
344972 116712 NOV - Notice of Violation Comply/Closed 2003-09-09
344972 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00
344973 116712 NOV - Notice of Violation Comply/Closed 2003-09-09
344973 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00
358096 122798 NOV - Notice of Violation Comply/Closed 2003-09-09
358096 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00
358097 122798 NOV - Notice of Violation Comply/Closed 2003-09-09
358097 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00
358098 122798 NOV - Notice of Violation Comply/Closed 2003-09-09
358098 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00
364046 142896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-21 2004-04-22 $3,200.00 $3,200.00

For data sources see[7]

References