If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-21149 | | Well ID: 37-051-21149 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.894583, -79.560833 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: SPRUELL HEIRS UNIT 1 | | Farm/Lease Name: SPRUELL HEIRS UNIT 1 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2000-03-30 | | Permit Date: 2000-03-30 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 39.894583 | | Latitude: 39.894583 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2000-03-30 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2000-06-08 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 92: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 86: | Line 118: | ||
|- | |- | ||
| 2004 | | 2004 | ||
− | | | + | | [[LINN OPR LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 95: | Line 127: | ||
|- | |- | ||
| 2006 | | 2006 | ||
− | | | + | | [[LINN OPR INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 104: | Line 136: | ||
|- | |- | ||
| 2007 | | 2007 | ||
− | | | + | | [[LINN OPR INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 113: | Line 145: | ||
|- | |- | ||
| 2008 | | 2008 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 122: | Line 154: | ||
|- | |- | ||
| 2009 | | 2009 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 131: | Line 163: | ||
|- | |- | ||
| 2010 | | 2010 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 140: | Line 172: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 149: | Line 181: | ||
|- | |- | ||
| 2012 | | 2012 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 158: | Line 190: | ||
|- | |- | ||
| 2013 | | 2013 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 167: | Line 199: | ||
|- | |- | ||
| 2014 | | 2014 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 176: | Line 208: | ||
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 185: | Line 217: | ||
|- | |- | ||
| 2016 | | 2016 | ||
− | | | + | | [[XTO ENERGY INC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 203: | Line 235: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 208: | Line 241: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
− | | Servicing Fluid | + | | [[XTO ENERGY INC]] |
+ | | Servicing Fluid | ||
| style="text-align: right;" | 2,975.00 Bbl | | style="text-align: right;" | 2,975.00 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY |
Well ID: 37-051-21149 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.894583,"lon":-79.560833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Stewart Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: SPRUELL HEIRS UNIT 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2000-03-30 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 39.894583 | |
Longitude: -79.560833 |
Date | Event |
---|---|
2000-03-30 | New Permit Application |
2000-06-08 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2004 | LINN OPR LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | LINN OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | XTO ENERGY INC | Servicing Fluid | 2,975.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1814085 | Primary Facility | 2009-07-15 | Compliance Evaluation | No Violations Noted | well was never produced. site ID sign was showing the original permit #21060. This permit expired on 12/4/98 for the spruell heirs unit 1. the permit was renewed as 21149 spruell unit 1 |
2532570 | Primary Facility | 2016-09-30 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Installing 2nd (BOP) this morning to pull hanger trough. |
2532575 | Primary Facility | 2016-10-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | After pulling 6 - joints of 4 1/2 " casing the well bore showing tight zones. Operator concerns getting hung in well with casing. Planning to cement casing in well (10/13/2015).. |
2532583 | Primary Facility | 2016-10-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | The operator cut casing @ 6000’, and still can only move casing up and down 8'.Operator requesting to cut at 5000'. And after discussion the operator agreed to cut at 5650’. The casing is moving but still tight. Moved up to 5300’ and cut casing, casing is free at this point. |
2532587 | Primary Facility | 2016-10-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | The well .is plugged and site being reclaimed. |
2665426 | Primary Facility | 2017-11-29 | Site Restoration | No Violations Noted | Inspection conducted in response to Well Site Restoration Report received by Department.
At time of inspection well is plugged. According to Department records well was plugged on 10-19-16. Landowner present during inspection. According to landowner, a buried plate was installed over plugged well. This Well Site Restoration Report is approved. |
945730 | Primary Facility | 2000-06-12 | Routine/Complete Inspection | No Violations Noted | cementing casing |
For data sources see[7]