X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-25102"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-25102
 
| Well ID: 37-129-25102
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.273633, -79.520111 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.273633, -79.520111 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BLACK/TODARO 1
 
| Farm/Lease Name: BLACK/TODARO 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 10/21/2003
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 8/22/2003
+
| Permit Date: 2003-08-22
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.273633
 
| Latitude: 40.273633
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-08-22
 +
| New Permit Application
 +
|-
 +
| 2003-10-21
 +
| Performed Spud Operation
 +
|-
 +
| 2003-11-04
 +
| Drilling Completion
 +
|-
 +
| 2003-11-12
 +
| Perforation
 +
|-
 +
| 2004-03-01
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 127:
 
|-
 
|-
 
| 2003
 
| 2003
| style="text-align: right;" |
+
| [[NATURAL ENERGY DEV CORP]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 23,839.57
+
| style="text-align: right;" | 23839.57
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 18,683.09
+
| style="text-align: right;" | 18683.09
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 13,832.51
+
| style="text-align: right;" | 13832.51
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 10,962.00
+
| style="text-align: right;" | 10962
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 9,663.31
+
| style="text-align: right;" | 9663.31
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[NATURAL ENERGY DEV CORP]]
 
| [[NATURAL ENERGY DEV CORP]]
| style="text-align: right;" | 8,635.70
+
| style="text-align: right;" | 8635.70
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 128: Line 194:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 137: Line 203:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 146: Line 212:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 155: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 164: Line 230:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 173: Line 239:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 182: Line 248:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 191: Line 257:
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 200: Line 266:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 214: Line 280:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 219: Line 286:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2004-A00
+
| 2004
 +
| [[NATURAL ENERGY DEV CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 225: Line 293:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2005-A00
+
| 2005
 +
| [[NATURAL ENERGY DEV CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 231: Line 300:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2006-A00
+
| 2006
 +
| [[NATURAL ENERGY DEV CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
Line 237: Line 307:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2009-A00
+
| 2009
 +
| [[NATURAL ENERGY DEV CORP]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
Line 243: Line 314:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2012-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[NATURAL ENERGY DEV CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[NATURAL ENERGY DEV CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 274: Line 347:
 
| 1281681
 
| 1281681
 
| Primary Facility
 
| Primary Facility
| 10/24/2003
+
| 2003-10-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 281: Line 354:
 
| 1282553
 
| 1282553
 
| Primary Facility
 
| Primary Facility
| 10/29/2003
+
| 2003-10-29
 
| Complaint Inspection
 
| Complaint Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 288: Line 361:
 
| 1283709
 
| 1283709
 
| Primary Facility
 
| Primary Facility
| 10/30/2003
+
| 2003-10-30
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 295: Line 368:
 
| 1288266
 
| 1288266
 
| Primary Facility
 
| Primary Facility
| 11/17/2003
+
| 2003-11-17
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 302: Line 375:
 
| 1437850
 
| 1437850
 
| Primary Facility
 
| Primary Facility
| 04/06/2005
+
| 2005-04-06
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 321: Line 394:
 
| 370247
 
| 370247
 
| 10/29/2003
 
| 10/29/2003
| 11/17/2003
+
| 2003-10-29
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 329: Line 402:
 
| 370248
 
| 370248
 
| 10/29/2003
 
| 10/29/2003
| 11/17/2003
+
| 2003-10-29
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 337: Line 410:
 
| 370761
 
| 370761
 
| 10/30/2003
 
| 10/30/2003
| 11/17/2003
+
| 2003-10-30
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 345: Line 418:
 
| 370762
 
| 370762
 
| 10/30/2003
 
| 10/30/2003
| 11/17/2003
+
| 2003-10-30
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 367: Line 440:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 11/17/2003
+
| 2003-11-17
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 375: Line 448:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/05/2004
+
| 2004-04-05
| 04/09/2004
+
| 2004-04-09
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
Line 385: Line 458:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 11/17/2003
+
| 2003-11-17
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 393: Line 466:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/05/2004
+
| 2004-04-05
| 04/09/2004
+
| 2004-04-09
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
Line 402: Line 475:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/05/2004
+
| 2004-04-05
| 04/09/2004
+
| 2004-04-09
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
Line 411: Line 484:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 04/05/2004
+
| 2004-04-05
| 04/09/2004
+
| 2004-04-09
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
 
| style="text-align: right;" | $3,690.00
Line 423: Line 496:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 07:29, 16 May 2020

Well Details

Well ID: 37-129-25102
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Hempfield Township
Operator Name: NATURAL ENERGY DEV CORP
Well Pad ID:
Farm/Lease Name: BLACK/TODARO 1
License Status: ACTIVE
Spud Date:
Permit Date: 2003-08-22
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.273633
Longitude: -79.520111

For data sources see[1][2][3]

Well History

Date Event
2003-08-22 New Permit Application
2003-10-21 Performed Spud Operation
2003-11-04 Drilling Completion
2003-11-12 Perforation
2004-03-01 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 NATURAL ENERGY DEV CORP 0.00 0 0.00 0 0.00 0
2004 NATURAL ENERGY DEV CORP 23839.57 365 0.00 0 0.00 0
2005 NATURAL ENERGY DEV CORP 18683.09 365 0.00 0 0.00 0
2006 NATURAL ENERGY DEV CORP 13832.51 365 0.00 0 0.00 0
2007 NATURAL ENERGY DEV CORP 10962 360 0.00 0 0.00 0
2008 NATURAL ENERGY DEV CORP 9663.31 360 0.00 0 0.00 0
2009 NATURAL ENERGY DEV CORP 8635.70 360 0.00 0 0.00 0
2010 NATURAL ENERGY DEV CORP 7,281.00 365 0.00 0 0.00 0
2011 NATURAL ENERGY DEV CORP 7,534.00 365 0.00 0 0.00 0
2012 NATURAL ENERGY DEV CORP 5,141.00 365 0.00 0 0.00 0
2013 NATURAL ENERGY DEV CORP 5,019.00 365 0.00 0 0.00 0
2014 NATURAL ENERGY DEV CORP 4,100.00 330 0.00 0 0.00 0
2015 NATURAL ENERGY DEV CORP 2,902.00 360 0.00 0 0.00 0
2016 NATURAL ENERGY DEV CORP 1,529.00 330 0.00 0 0.00 0
2017 NATURAL ENERGY DEV CORP 1,631.00 360 0.00 0 0.00 0
2018 NATURAL ENERGY DEV CORP 1,819.00 330 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2004 NATURAL ENERGY DEV CORP Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2005 NATURAL ENERGY DEV CORP Brine 80.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2006 NATURAL ENERGY DEV CORP Brine 45.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2009 NATURAL ENERGY DEV CORP Brine 75.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2012 NATURAL ENERGY DEV CORP Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2017 NATURAL ENERGY DEV CORP Produced Fluid 75.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1281681 Primary Facility 2003-10-24 Drilling/Alteration No Violations Noted 8 3/4" hole drilled to 1525'. Killing gas with brine. I.D., pit ( 10ml), E & S, ok.
1282553 Primary Facility 2003-10-29 Complaint Inspection Violation(s) Noted drilling/inadeq E&S - site&road unstable - mud carried offsite onto state road/inadeq E&S plan/plan not implemented as designed
1283709 Primary Facility 2003-10-30 Compliance Evaluation Outstanding Violations - Viols Req'd reinspection & meeting with operator to discuss corrective actions needed to bring site&road into compliance
1288266 Primary Facility 2003-11-17 Compliance Evaluation No Violations Noted reinspection - violations corrected - E&S ok/well drilled&frac'd/pits >2ft freeboard/plan&ID ok
1437850 Primary Facility 2005-04-06 Site Restoration No Violations Noted equipped/restored/tank&tag ok/E&S road&fabric advice

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1282553 370247 10/29/2003 2003-10-29 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1282553 370248 10/29/2003 2003-10-29 102.4INADPLN - E&S Plan not adequate Administrative
1283709 370761 10/30/2003 2003-10-30 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1283709 370762 10/30/2003 2003-10-30 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
370247 127971 NOV - Notice of Violation Comply/Closed 2003-11-17
370247 139895 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-05 2004-04-09 $3,690.00 $3,690.00
370248 127971 NOV - Notice of Violation Comply/Closed 2003-11-17
370248 139895 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-05 2004-04-09 $3,690.00 $3,690.00
370761 139895 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-05 2004-04-09 $3,690.00 $3,690.00
370762 139895 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-04-05 2004-04-09 $3,690.00 $3,690.00

For data sources see[7]

References