If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-27632 | | Well ID: 37-129-27632 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.387431, -79.325516 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 13: | Line 13: | ||
| Municipality: [[Derry Township,_Westmoreland_County,_Pennsylvania|Derry Township]] | | Municipality: [[Derry Township,_Westmoreland_County,_Pennsylvania|Derry Township]] | ||
|- | |- | ||
− | | Operator Name: [[ALLIANCE | + | | Operator Name: [[ALLIANCE PETRO CO LLC]] |
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: L J FEASEL 7 | | Farm/Lease Name: L J FEASEL 7 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2008-09-17 |
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.387431 | | Latitude: 40.387431 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2008-09-17 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2009-08-28 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2009-09-03 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2009-09-09 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2013-04-12 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 61: | Line 127: | ||
|- | |- | ||
| 2008 | | 2008 | ||
− | | | + | | [[CONSOL GAS CO]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2009 | | 2009 | ||
− | | [[ | + | | [[CONSOL GAS CO]] |
| style="text-align: right;" | 471.97 | | style="text-align: right;" | 471.97 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 85: | Line 151: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
− | | | + | | [[CONSOL GAS CO]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 101: | Line 167: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
Line 110: | Line 176: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 119: | Line 185: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 128: | Line 194: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 137: | Line 203: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 146: | Line 212: | ||
| style="text-align: right;" | 213 | | style="text-align: right;" | 213 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
Line 155: | Line 221: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 169: | Line 235: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 174: | Line 241: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2009 | + | | 2009 |
+ | | [[CONSOL GAS CO]] | ||
| Brine | | Brine | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 50.00 Bbl |
| Brine or Industrial Waste Treatment Plt | | Brine or Industrial Waste Treatment Plt | ||
− | | | + | | PA0095273 |
|- | |- | ||
− | | 2009 | + | | 2009 |
+ | | [[CONSOL GAS CO]] | ||
| Brine | | Brine | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 112.00 Bbl |
| Brine or Industrial Waste Treatment Plt | | Brine or Industrial Waste Treatment Plt | ||
− | | | + | | PA0091472 |
|- | |- | ||
− | | 2009 | + | | 2009 |
+ | | [[CONSOL GAS CO]] | ||
| Fracking Fluid | | Fracking Fluid | ||
| style="text-align: right;" | 440.00 Bbl | | style="text-align: right;" | 440.00 Bbl | ||
Line 192: | Line 262: | ||
| 37-129-27631 | | 37-129-27631 | ||
|- | |- | ||
− | | 2010- | + | | 2010 |
− | | Produced Fluid | + | | [[CONSOL GAS CO]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 74.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[CONSOL GAS CO]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 392.00 Bbl | | style="text-align: right;" | 392.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | | + | | [[CONSOL GAS CO]] |
− | + | | Produced Fluid | |
− | |||
− | |||
− | |||
− | |||
− | | Produced Fluid | ||
| style="text-align: right;" | 40.00 Bbl | | style="text-align: right;" | 40.00 Bbl | ||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
− | | | + | | style="text-align: right;" | 86.00 Bbl |
− | | | + | | INJECTION DISPOSAL WELL |
+ | | PAS2D912BSOM | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
+ | | Produced Fluid | ||
| style="text-align: right;" | 41.00 Bbl | | style="text-align: right;" | 41.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2011- | + | | 2011 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 60.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 34-099-23127 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[CNX GAS CO LLC]] | ||
+ | | Produced Fluid | ||
| style="text-align: right;" | 60.00 Bbl | | style="text-align: right;" | 60.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | | + | | 2012 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 167.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D912BSOM | | PAS2D912BSOM | ||
|- | |- | ||
− | | | + | | 2013 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 42.48 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D912BSOM | | PAS2D912BSOM | ||
|- | |- | ||
− | | | + | | 2015 |
− | | Produced Fluid | + | | [[CNX GAS CO LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid |
+ | | style="text-align: right;" | 66.00 Bbl | ||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
− | | | + | | 34-157-25511 |
|- | |- | ||
|} | |} | ||
Line 265: | Line 351: | ||
| 1826726 | | 1826726 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2009-09-03 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 272: | Line 358: | ||
| 1878374 | | 1878374 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2010-01-22 |
| Compliance Evaluation | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
Line 279: | Line 365: | ||
| 2084232 | | 2084232 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2012-07-19 |
| Incident- Response to Accident or Event | | Incident- Response to Accident or Event | ||
| In Compliance with Policy | | In Compliance with Policy | ||
Line 286: | Line 372: | ||
| 2091871 | | 2091871 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2012-08-01 |
| Incident- Response to Accident or Event | | Incident- Response to Accident or Event | ||
| No Violations Noted | | No Violations Noted | ||
Line 335: | Line 421: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-129-27632 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.387431,"lon":-79.325516,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: L J FEASEL 7 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-09-17 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.387431 | |
Longitude: -79.325516 |
Date | Event |
---|---|
2008-09-17 | New Permit Application |
2009-08-28 | Performed Spud Operation |
2009-09-03 | Drilling Completion |
2009-09-09 | Perforation |
2013-04-12 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | CONSOL GAS CO | 471.97 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 4,211.00 | 365 | 29.00 | 365 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 2,575.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 1,984.80 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 1,565.49 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 1,253.55 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 1,191.05 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 390.00 | 213 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 487.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CONSOL GAS CO | Brine | 50.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | CONSOL GAS CO | Brine | 112.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Fracking Fluid | 440.00 Bbl | Other | 37-129-27631 |
2010 | CONSOL GAS CO | Produced Fluid | 74.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | CONSOL GAS CO | Produced Fluid | 392.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Produced Fluid | 40.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CNX GAS CO LLC | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | PAS2D912BSOM |
2011 | CNX GAS CO LLC | Produced Fluid | 41.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CNX GAS CO LLC | Produced Fluid | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2011 | CNX GAS CO LLC | Produced Fluid | 60.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | CNX GAS CO LLC | Produced Fluid | 167.00 Bbl | INJECTION DISPOSAL WELL | PAS2D912BSOM |
2013 | CNX GAS CO LLC | Produced Fluid | 42.48 Bbl | INJECTION DISPOSAL WELL | PAS2D912BSOM |
2015 | CNX GAS CO LLC | Produced Fluid | 66.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1826726 | Primary Facility | 2009-09-03 | Drilling/Alteration | No Violations Noted | FALCON 19 DRILLING AHEAD, EVERYTHING OK. NO SIGN AT POINT OF ACCESS ROAD |
1878374 | Primary Facility | 2010-01-22 | Compliance Evaluation | No Violations Noted | ED GAMBLE FROM DOMINION REPORTED A SMALL SPILL. TRUCK DRIVER LEFT AN EQUILIBRIUM VALVE SHUT AND THE TANK OVERFLOWED. IT WAS CONTAINED BY THE DIKE. |
2084232 | Primary Facility | 2012-07-19 | Incident- Response to Accident or Event | In Compliance with Policy | Well inspected as a follow-up to an incident on 07/18/12 which resulted in the production fluid tank located onsite catching on fire. Met onsite with operator representative Doug Manners. CONSOL Gas Company personnel disconnected the well after the fire was extinguished on 07/18/12. Fire was reported shortly after 3PM 07/18/12, to CONSOL Gas Company and by 4PM CONSOL GAS Company had contacted the Department. Fire did not appear to have affected the ancillary well equipment located onsite. Tank and diked area had been covered by plastic to prevent precipitation from collecting in the diked area. There was no evidence observed to indicate that the production fluid released to the diked area had made its way outside of the diked area. Well had been disconnected from the flow line and production tank and shut in. McCutcheon is tentatively scheduled to be onsite at 8AM on 07/20/12 to begin site remediation. |
2091871 | Primary Facility | 2012-08-01 | Incident- Response to Accident or Event | No Violations Noted | Well inspected as a follow-up to an incident on 07/18/12 which resulted in the production fluid tank located onsite catching on fire. Brine tank had been removed and the affected diking material had been excavated and contained in a covered roll-off box located onsite. The well was still disconnected and not in production. At this time the Department is requesting that the operator forward the following documentation no later than 09/22/12: 1) Sample results showing all affected media had been exacavated, this should include background sample results to compare the excavated area sample results to. 2) Documentation outlining how the incident began, at time the incident was reported to the Department, and what actions have been undertaken to remediate the well site. |
2518723 | Primary Facility | 2016-09-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was open. Well head casing-equipment-100 bbl steel tank-dike looked ok. |
2755523 | Primary Facility | 2018-07-24 | Routine/Complete Inspection | In Compliance with Policy | At the time of inspection well equipped for production. Well tag present but illegible. Department requests Operator address well tag legibility. Brine tank within earthen dike and appears structurally sound. No E&S issues. |
For data sources see[7]