Difference between revisions of "37-129-28610"

m
 
(15 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 129-28610
+
| Well ID: 37-129-28610
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.134722, -79.364172 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.134722, -79.364172 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Donegal Township,_Westmoreland_County,_Pennsylvania|Donegal Township]]
 +
|-
 +
| Operator Name: [[XPR RESOURCES LLC]]
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Well Pad ID:  
 
|-
 
|-
| Municipality: [[Donegal Township, Westmoreland County, Pennsylvania|Donegal Township]]
+
| Farm/Lease Name: KALP 1-7H
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC]]
+
| License Status:  
 
|-
 
|-
| First Permit Date: 2011-06-06
+
| Spud Date:  
 
|-
 
|-
| Last Permit Date: 2011-06-06
+
| Permit Date: 2011-06-06
 
|-
 
|-
| Spud Date: None
+
| Well Type: GAS
 
|-
 
|-
| Unconventional: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Horizontal: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.134722
 
| Latitude: 40.134722
 
|-
 
|-
 
| Longitude: -79.364172
 
| Longitude: -79.364172
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-06-06
 +
| New Permit Application
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[XPR RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1994376
 
| 1994376
 +
| Primary Facility
 
| 2011-06-21
 
| 2011-06-21
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.  Road, pad and pits were under construction.
 
| Site visit was part of routine inspection.  Road, pad and pits were under construction.
Heavy rains had compromised some BMPs.  HRI (construction contractor) was actively upgrading or adding additional measures to prevent erosion from the site.  It was suggested to add diversion ditches and sediment traps to deal with the water from the site.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2012821
 
| 2012821
 +
| Primary Facility
 
| 2011-10-21
 
| 2011-10-21
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.  Patterson-UTI Rig #480 was on site.  Spoke with Joe Ray Company Man on site.
 
| Site visit was part of routine inspection.  Patterson-UTI Rig #480 was on site.  Spoke with Joe Ray Company Man on site.
Haliburton was on site.  Cementing taking place.
 
BMPs around drill pad and impoundment were sound.  Pits had adequate freeboard.  Secondary containment was in place.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2026798
 
| 2026798
 +
| Primary Facility
 
| 2011-12-05
 
| 2011-12-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL PERMITED BUT NOT DRILLED.  E&S AND PITS, GOOD
 
| WELL PERMITED BUT NOT DRILLED.  E&S AND PITS, GOOD
|
 
|-
 
 
|-
 
|-
 
| 2034566
 
| 2034566
 +
| Primary Facility
 
| 2012-01-11
 
| 2012-01-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspectiion.
 
| Site visit was part of routine inspectiion.
One well was drilled on the pad.
 
Rig had been removed.
 
BMPs in place.  A rock lined ditch and sediment trap were being installed on far slope (north) of pad.  This will eleviate the erosion issues on this side of the pad.  All changes should be red marked on the e&s plan.
 
All other BMPs were in place and appeared to be working properly.
 
Three potential spills were spotted on the pad.  One appeared to be an oil based mud.  Two others appeared to be a fuel sourec, possibly diesel.  These areas need to be exavated, and removed.
 
Spoke to Mike Cribbs (WPX).
 
Water quality specialist Rich Thomas was present during inpection.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2100439
 
| 2100439
 +
| Primary Facility
 
| 2012-09-18
 
| 2012-09-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Company drained impoundment. No issues noted.
 
| Company drained impoundment. No issues noted.
|  
+
|-
 +
| 2438916
 +
| Primary Facility
 +
| 2015-12-15
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well.  Removed production tree and set BOP.  CIBP was set at 7500 feet.  On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet.  Pulled casing to first collar and removed casing of 27 joints.
 +
|-
 +
| 2438939
 +
| Primary Facility
 +
| 2015-12-17
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS).  On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement.
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
 
|-
 
|-
| 2012-1
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Violation ID
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty ID
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty Code
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
|-
+
|}-->
| 2011-2
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title =Oil and Gas Compliance Report
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-05-20
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
| style="text-align:right;" | 0.0
+
==References==
|-
+
<references/>
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:26, 16 May 2020

Well Details

Well ID: 37-129-28610
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID:
Farm/Lease Name: KALP 1-7H
License Status:
Spud Date:
Permit Date: 2011-06-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.134722
Longitude: -79.364172

For data sources see[1][2][3]

Well History

Date Event
2011-06-06 New Permit Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2012 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1994376 Primary Facility 2011-06-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Road, pad and pits were under construction.
2012821 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site.
2026798 Primary Facility 2011-12-05 Drilling/Alteration No Violations Noted WELL PERMITED BUT NOT DRILLED. E&S AND PITS, GOOD
2034566 Primary Facility 2012-01-11 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspectiion.
2100439 Primary Facility 2012-09-18 Routine/Complete Inspection No Violations Noted Company drained impoundment. No issues noted.
2438916 Primary Facility 2015-12-15 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well. Removed production tree and set BOP. CIBP was set at 7500 feet. On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet. Pulled casing to first collar and removed casing of 27 joints.
2438939 Primary Facility 2015-12-17 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS). On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement.

For data sources see[6]

References