X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-123-37288"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-123-37288
 
| Well ID: 37-123-37288
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.810861, -79.190150 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.810861, -79.190150 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 17: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name: PRATT 3
+
| Farm/Lease Name: PRATT
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1984-11-15
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 1985-02-22
 
| Permit Date: 1985-02-22
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.810861
 
| Latitude: 41.810861
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1984-11-15
 +
| Performed Spud Operation
 +
|-
 +
| 1984-11-17
 +
| Drilling Completion
 +
|-
 +
| 1985-02-22
 +
| New Permit Application
 +
|-
 +
| 1992-01-01
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 113: Line 151:
 
|-
 
|-
 
| 2010
 
| 2010
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 32.25
 
| style="text-align: right;" | 32.25
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 122: Line 160:
 
|-
 
|-
 
| 2011
 
| 2011
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 3.48
 
| style="text-align: right;" | 3.48
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 131: Line 169:
 
|-
 
|-
 
| 2012
 
| 2012
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 24.25
 
| style="text-align: right;" | 24.25
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 140: Line 178:
 
|-
 
|-
 
| 2013
 
| 2013
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.98
 
| style="text-align: right;" | 15.98
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 149: Line 187:
 
|-
 
|-
 
| 2014
 
| 2014
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.62
 
| style="text-align: right;" | 15.62
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 158: Line 196:
 
|-
 
|-
 
| 2015
 
| 2015
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.59
 
| style="text-align: right;" | 15.59
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 167: Line 205:
 
|-
 
|-
 
| 2016
 
| 2016
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.41
 
| style="text-align: right;" | 15.41
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 176: Line 214:
 
|-
 
|-
 
| 2017
 
| 2017
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.59
 
| style="text-align: right;" | 15.59
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 185: Line 223:
 
|-
 
|-
 
| 2018
 
| 2018
| [[MCCOOL JOHN E]]
+
| style="text-align: right;" |
 
| style="text-align: right;" | 15.18
 
| style="text-align: right;" | 15.18
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 210: Line 248:
 
|-
 
|-
 
| 2010
 
| 2010
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 9.92 Bbl
 
| style="text-align: right;" | 9.92 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 217: Line 255:
 
|-
 
|-
 
| 2011
 
| 2011
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1.10 Bbl
 
| style="text-align: right;" | 1.10 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 224: Line 262:
 
|-
 
|-
 
| 2012
 
| 2012
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 8.35 Bbl
 
| style="text-align: right;" | 8.35 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 231: Line 269:
 
|-
 
|-
 
| 2013
 
| 2013
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1.88 Bbl
 
| style="text-align: right;" | 1.88 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 238: Line 276:
 
|-
 
|-
 
| 2014
 
| 2014
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 1.94 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2015
 +
|
 +
| Produced Fluid
 
| style="text-align: right;" | 1.94 Bbl
 
| style="text-align: right;" | 1.94 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 245: Line 290:
 
|-
 
|-
 
| 2016
 
| 2016
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2.24 Bbl
 
| style="text-align: right;" | 2.24 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 252: Line 297:
 
|-
 
|-
 
| 2017
 
| 2017
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2.47 Bbl
 
| style="text-align: right;" | 2.47 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 259: Line 304:
 
|-
 
|-
 
| 2018
 
| 2018
| [[MCCOOL JOHN E]]
+
|  
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2.35 Bbl
 
| style="text-align: right;" | 2.35 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Revision as of 03:58, 17 May 2020

Well Details

Well ID: 37-123-37288
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Pleasant Township
Operator Name: MCCOOL JOHN E
Well Pad ID:
Farm/Lease Name: PRATT
License Status: ACTIVE
Spud Date:
Permit Date: 1985-02-22
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.810861
Longitude: -79.190150

For data sources see[1][2][3]

Well History

Date Event
1984-11-15 Performed Spud Operation
1984-11-17 Drilling Completion
1985-02-22 New Permit Application
1992-01-01 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 0.00 0 25.65 25 0.00 0
2001 0.00 0 18.53 30 0.00 0
2002 0.00 0 9.12 365 0.00 0
2010 32.25 365 12.44 365 0.00 0
2011 3.48 365 1.36 365 0.00 0
2012 24.25 365 10.32 365 0.01 1
2013 15.98 365 7.99 365 0.00 0
2014 15.62 365 7.89 365 0.00 0
2015 15.59 365 7.88 365 0.00 0
2016 15.41 365 5.76 365 0.00 0
2017 15.59 365 5.94 365 0.00 0
2018 15.18 365 5.94 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 Produced Fluid 9.92 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 Produced Fluid 1.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 Produced Fluid 8.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2013 Produced Fluid 1.88 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 Produced Fluid 1.94 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 Produced Fluid 1.94 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016 Produced Fluid 2.24 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017 Produced Fluid 2.47 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 Produced Fluid 2.35 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[6]

References