| Well ID: 37-003-22074
 
| Well ID: 37-003-22074
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.486769, -79.823703 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.486770, -79.823704 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Penn Hills Township,_Allegheny_County,_Pennsylvania|Penn Hills Township]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 
|-
 
|-
| First Permit Date: 2009-08-21
+
| Well Pad ID:  
 
|-
 
|-
| Last Permit Date: 2009-08-21
+
| Farm/Lease Name: KICKLER 1
 
|-
 
|-
| Spud Date: 2010-05-19
+
| License Status:  
 
|-
 
|-
| Unconventional: No
+
| Spud Date:  
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 2009-08-21
 
|-
 
|-
| Violations: None
+
| Well Type: GAS
 
|-
 
|-
| Latitude: 40.486769
+
| Unconventional Well: N
 
|-
 
|-
| Longitude: -79.823703
+
| Configuration: Vertical Well
 
|-
 
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 40.486770
 +
|-
 +
| Longitude: -79.823704
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-08-21
 +
| New Permit Application
 +
|-
 +
| 2010-05-19
 +
| Performed Spud Operation
 +
|-
 +
| 2010-06-01
 +
| Drilling Completion
 +
|-
 +
| 2010-06-09
 +
| Perforation
 +
|-
 +
| 2013-04-22
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 2,397.00
 +
| style="text-align: right;" | 153
 +
| style="text-align: right;" | 299.51
 +
| style="text-align: right;" | 153
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 8,423.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 480.36
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 11,578.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 304.64
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-0
+
| 2013
| style="text-align:right;" | 9249.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 9,249.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 311.42
| style="text-align:right;" | 311.42
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 7,851.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 203.11
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2015
| style="text-align:right;" | 11578.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 7,103.34
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 164.14
| style="text-align:right;" | 304.64
+
| style="text-align: right;" | 61
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 8,058.70
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 220.87
 +
| style="text-align: right;" | 62
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2017
| style="text-align:right;" | 8423.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 7,524.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 223.97
| style="text-align:right;" | 480.36
+
| style="text-align: right;" | 365
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 12,958.77
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 257.15
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2019
| style="text-align:right;" | 2397.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 153.0
+
| style="text-align: right;" | 13,910.53
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 168.75
| style="text-align:right;" | 299.51
+
| style="text-align: right;" | 61
| style="text-align:right;" | 153.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2010-0
+
| 2010
| FRACING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 930.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 930.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
 
|-
 
|-
 +
| 2010
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,140.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 
|-
 
|-
| 2010-0
+
| 2010
| DRILLING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 1140.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 365.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 33.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 
|-
 
|-
| 2010-0
+
| 2019
| PRODUCED FLUID
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 38.67 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| CENT WASTE TRT FAC NPDES DISCHARGE
| PA0091472
+
| PA0095273
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1890256
 
| 1890256
 +
| Primary Facility
 
| 2010-05-27
 
| 2010-05-27
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On May 27 2010, I conducted a routine inspection of the above site.  Drilling was taking place at the time of inspection.  Site ID and E&S plan were posted.  Access road was in good condition.  Pits appeared to be in good condition. The operator should continue to inspect and maintain E&S controls routinely and after each significant rainfall event.
 
| On May 27 2010, I conducted a routine inspection of the above site.  Drilling was taking place at the time of inspection.  Site ID and E&S plan were posted.  Access road was in good condition.  Pits appeared to be in good condition. The operator should continue to inspect and maintain E&S controls routinely and after each significant rainfall event.
|
 
|-
 
 
|-
 
|-
 
| 1893074
 
| 1893074
 +
| Primary Facility
 
| 2010-06-10
 
| 2010-06-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 10th, 2010 I conducted a routine inspection of the above site.  Drilling was completed at the time of the inspection.  A swabbing rig was on site.  The frac pit had been constructed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition. The pits appeared to be in good condition.  All E&S controls were in place and constructed according to the plan at site.  The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
 
| On June 10th, 2010 I conducted a routine inspection of the above site.  Drilling was completed at the time of the inspection.  A swabbing rig was on site.  The frac pit had been constructed.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition. The pits appeared to be in good condition.  All E&S controls were in place and constructed according to the plan at site.  The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
|
 
|-
 
 
|-
 
|-
 
| 1894549
 
| 1894549
 +
| Primary Facility
 
| 2010-06-28
 
| 2010-06-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 28th, 2010, I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. Site ID and E&S plan were posted on site.  The drilling pits had begun to be filled. No spills, leaks, or accelerated erosion was observed at the time of inspection. The operator should continue to inspect and maintain the E&S controls until the site is fully restored and 70% uniform vegetative cover is established.
 
| On June 28th, 2010, I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. Site ID and E&S plan were posted on site.  The drilling pits had begun to be filled. No spills, leaks, or accelerated erosion was observed at the time of inspection. The operator should continue to inspect and maintain the E&S controls until the site is fully restored and 70% uniform vegetative cover is established.
|
 
|-
 
 
|-
 
|-
 
| 1894767
 
| 1894767
 +
| Primary Facility
 
| 2010-05-18
 
| 2010-05-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| e&s ok  no rig yet
 
| e&s ok  no rig yet
|
 
|-
 
 
|-
 
|-
 
| 1895083
 
| 1895083
 +
| Primary Facility
 
| 2010-06-15
 
| 2010-06-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. PIT LEVEL OK.CITE IS CLEAN AND DOZED.THE ACCESS ROAD IS STONED. WELL IS SHUT IN.
 
| DRILLING COMPLETE. PIT LEVEL OK.CITE IS CLEAN AND DOZED.THE ACCESS ROAD IS STONED. WELL IS SHUT IN.
|
 
|-
 
 
|-
 
|-
 
| 1895121
 
| 1895121
 +
| Primary Facility
 
| 2010-05-25
 
| 2010-05-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HILL DRILLING@1862 FT. SITE,E&S,AND ACCESS,OK.
 
| HILL DRILLING@1862 FT. SITE,E&S,AND ACCESS,OK.
|
 
|-
 
 
|-
 
|-
 
| 1895126
 
| 1895126
 +
| Primary Facility
 
| 2010-05-28
 
| 2010-05-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HILL DRILLING AT 3811 FT. SITE,PIT,E&S,AND ACCESS,OK.
 
| HILL DRILLING AT 3811 FT. SITE,PIT,E&S,AND ACCESS,OK.
|
 
|-
 
 
|-
 
|-
 
| 1912804
 
| 1912804
 +
| Primary Facility
 
| 2010-08-18
 
| 2010-08-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On August 18th, 2010 I conducted a routine inspection of the above site.  Drilling was completed at the time of the inspection.  The well was in production.  The site was seeded and mulched and growth was coming in well.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Some sediment was beginning to lay against the silt fence.  The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
 
| On August 18th, 2010 I conducted a routine inspection of the above site.  Drilling was completed at the time of the inspection.  The well was in production.  The site was seeded and mulched and growth was coming in well.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  Some sediment was beginning to lay against the silt fence.  The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
|
 
|-
 
 
|-
 
|-
 
| 1957914
 
| 1957914
 +
| Primary Facility
 
| 2011-02-08
 
| 2011-02-08
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On February 8th, 2011 I conducted a routine inspection of the above site.  Drilling was completed and the well was in production.  A wel tag was present.  The access road was in good condition.  Two tanks were onsite surrounded by an earthen dike.  No spills/leaks or accelerated erosion were observed at the time of inspection.
 
| On February 8th, 2011 I conducted a routine inspection of the above site.  Drilling was completed and the well was in production.  A wel tag was present.  The access road was in good condition.  Two tanks were onsite surrounded by an earthen dike.  No spills/leaks or accelerated erosion were observed at the time of inspection.
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:31, 20 May 2020

Well Details

Well ID: 37-003-22074
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Penn Hills Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: KICKLER 1
License Status:
Spud Date:
Permit Date: 2009-08-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.486770
Longitude: -79.823704

For data sources see[1][2][3]

Well History

Date Event
2009-08-21 New Permit Application
2010-05-19 Performed Spud Operation
2010-06-01 Drilling Completion
2010-06-09 Perforation
2013-04-22 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 2,397.00 153 299.51 153 0.00 0
2011 PENNECO OIL CO INC 8,423.00 365 480.36 365 0.00 0
2012 PENNECO OIL CO INC 11,578.00 366 304.64 366 0.00 0
2013 PENNECO OIL CO INC 9,249.00 365 311.42 365 0.00 0
2014 PENNECO OIL CO INC 7,851.00 365 203.11 365 0.00 0
2015 PENNECO OIL CO INC 7,103.34 365 164.14 61 0.00 0
2016 PENNECO OIL CO INC 8,058.70 366 220.87 62 0.00 0
2017 PENNECO OIL CO INC 7,524.00 365 223.97 365 0.00 0
2018 PENNECO OIL CO INC 12,958.77 365 257.15 92 0.00 0
2019 PENNECO OIL CO INC 13,910.53 365 168.75 61 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Fracing Fluid Waste 930.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PENNECO OIL CO INC Drilling Fluid Waste 1,140.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Produced Fluid 365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2018 PENNECO OIL CO INC Produced Fluid 33.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PENNECO OIL CO INC Produced Fluid 38.67 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1890256 Primary Facility 2010-05-27 Routine/Complete Inspection No Violations Noted On May 27 2010, I conducted a routine inspection of the above site. Drilling was taking place at the time of inspection. Site ID and E&S plan were posted. Access road was in good condition. Pits appeared to be in good condition. The operator should continue to inspect and maintain E&S controls routinely and after each significant rainfall event.
1893074 Primary Facility 2010-06-10 Routine/Complete Inspection No Violations Noted On June 10th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. A swabbing rig was on site. The frac pit had been constructed. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The pits appeared to be in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
1894549 Primary Facility 2010-06-28 Routine/Complete Inspection No Violations Noted On June 28th, 2010, I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. Site ID and E&S plan were posted on site. The drilling pits had begun to be filled. No spills, leaks, or accelerated erosion was observed at the time of inspection. The operator should continue to inspect and maintain the E&S controls until the site is fully restored and 70% uniform vegetative cover is established.
1894767 Primary Facility 2010-05-18 Drilling/Alteration No Violations Noted e&s ok no rig yet
1895083 Primary Facility 2010-06-15 Drilling/Alteration No Violations Noted DRILLING COMPLETE. PIT LEVEL OK.CITE IS CLEAN AND DOZED.THE ACCESS ROAD IS STONED. WELL IS SHUT IN.
1895121 Primary Facility 2010-05-25 Drilling/Alteration No Violations Noted HILL DRILLING@1862 FT. SITE,E&S,AND ACCESS,OK.
1895126 Primary Facility 2010-05-28 Drilling/Alteration No Violations Noted HILL DRILLING AT 3811 FT. SITE,PIT,E&S,AND ACCESS,OK.
1912804 Primary Facility 2010-08-18 Routine/Complete Inspection No Violations Noted On August 18th, 2010 I conducted a routine inspection of the above site. Drilling was completed at the time of the inspection. The well was in production. The site was seeded and mulched and growth was coming in well. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Some sediment was beginning to lay against the silt fence. The operator should continue to inspect and maintain the E&S controls routinely and after each significant runoff event.
1957914 Primary Facility 2011-02-08 Routine/Complete Inspection No Violations Noted On February 8th, 2011 I conducted a routine inspection of the above site. Drilling was completed and the well was in production. A wel tag was present. The access road was in good condition. Two tanks were onsite surrounded by an earthen dike. No spills/leaks or accelerated erosion were observed at the time of inspection.

For data sources see[7]