X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22103"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22103
 
| Well ID: 37-003-22103
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.490575, -79.716978 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.490575, -79.716978 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: DOUDS 1
 
| Farm/Lease Name: DOUDS 1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-02-16
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2010-01-27
 
| Permit Date: 2010-01-27
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.490575
 
| Latitude: 40.490575
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-01-27
 +
| New Permit Application
 +
|-
 +
| 2010-02-16
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-26
 +
| Drilling Completion
 +
|-
 +
| 2010-03-09
 +
| Perforation
 +
|-
 +
| 2010-12-03
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 163: Line 204:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 761.96
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 94.38
 +
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 184: Line 234:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 1,000.00 Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 101674
+
| PA0091472
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 1,000.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| 101674
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 240.00 Bbl
+
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
Line 205: Line 255:
 
| 2010
 
| 2010
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 212: Line 262:
 
| 2012
 
| 2012
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 219: Line 269:
 
| 2014
 
| 2014
 
| [[PENNECO OIL CO INC]]
 
| [[PENNECO OIL CO INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 10 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 13:33, 20 May 2020

Well Details

Well ID: 37-003-22103
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: DOUDS 1
License Status:
Spud Date:
Permit Date: 2010-01-27
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.490575
Longitude: -79.716978

For data sources see[1][2][3]

Well History

Date Event
2010-01-27 New Permit Application
2010-02-16 Performed Spud Operation
2010-02-26 Drilling Completion
2010-03-09 Perforation
2010-12-03 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 1,140.00 214 116.92 214 0.00 0
2011 PENNECO OIL CO INC 1,918.00 365 239.14 365 0.00 0
2012 PENNECO OIL CO INC 1,528.00 366 238.72 366 0.00 0
2013 PENNECO OIL CO INC 1,640.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 833.00 365 230.79 365 0.00 0
2015 PENNECO OIL CO INC 1,116.19 365 0.00 0 0.00 0
2016 PENNECO OIL CO INC 922.74 335 118.41 30 0.00 0
2017 PENNECO OIL CO INC 880.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 795.52 365 0.00 0 0.00 0
2019 PENNECO OIL CO INC 761.96 365 94.38 31 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Fracing Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Fracing Fluid Waste 1,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010 PENNECO OIL CO INC Drilling Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Produced Fluid 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 PENNECO OIL CO INC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2014 PENNECO OIL CO INC Produced Fluid 10 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 10.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865549 Primary Facility 2010-02-17 Drilling/Alteration No Violations Noted MOVING EQUIPTMENT ONTO SITE. NO RIG. PIT IS NOT LINED.
1865550 Primary Facility 2010-02-19 Drilling/Alteration No Violations Noted 133/8" CASING IS CEMENTED. DRILLING AT 284'.
1865591 Primary Facility 2010-02-23 Drilling/Alteration No Violations Noted HILL DRILLIG. BIT AT 1767'. SITE AND ACCESS BEING RESTONED.
1869581 Primary Facility 2010-03-03 Drilling/Alteration No Violations Noted DRILLING COMPLETE. SITE CLEAN. PIT GONE.
1882824 Primary Facility 2010-04-02 Drilling/Alteration No Violations Noted WELL COMPLETE. E&S, AND ACCESS OK.
1884480 Primary Facility 2010-04-30 Drilling/Alteration No Violations Noted TANKS ARE SET. SITE RESTORED
1927773 Primary Facility 2010-10-05 Routine/Complete Inspection No Violations Noted COMBO OIL AND GAS WELL. TANKS ARE DIKED. SITE AND ACCESS STONED. ALL EQUIPTMENT FENCED.
1983169 Primary Facility 2011-05-18 Routine/Complete Inspection No Violations Noted COMBO OIL AND GAS WELL.
1984910 Primary Facility 2011-06-01 Routine/Complete Inspection No Violations Noted On June 1st , 2010 I conducted a routine inspection of the above site. The well was in production. The site was restored. The access road was in good condition. A well tag was secured to the well. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. The site was well vegetated.

For data sources see[7]

References