If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-003-22168 | | Well ID: 37-003-22168 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.534375, -80.119433 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: CHARLES LENZNER UNIT 2 | | Farm/Lease Name: CHARLES LENZNER UNIT 2 | ||
|- | |- | ||
− | | License Status: | + | | License Status: PLUGGED & ABANDONED |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2011-03-14 |
+ | |- | ||
+ | | Well Type: OIL | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: No | ||
|- | |- | ||
| Latitude: 40.534375 | | Latitude: 40.534375 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2011-03-14 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2011-05-05 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2011-05-11 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-02-12 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2014-04-08 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | | 2016-06-28 | ||
+ | | FULLY PLUGGED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 61: | Line 130: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | | + | | [[AMER NATURAL RESOURCES LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
− | | | + | | [[AMER NATURAL RESOURCES LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
− | | | + | | [[AMER NATURAL RESOURCES LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
− | | | + | | [[AMER NATURAL RESOURCES LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 106: | Line 175: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 111: | Line 181: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | Drilling Fluid Waste | + | | [[AMER NATURAL RESOURCES LLC]] |
+ | | Drilling Fluid Waste | ||
| style="text-align: right;" | 420.00 Bbl | | style="text-align: right;" | 420.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
− | | Drilling Fluid Waste | + | | [[AMER NATURAL RESOURCES LLC]] |
+ | | Drilling Fluid Waste | ||
| style="text-align: right;" | 568.00 Bbl | | style="text-align: right;" | 568.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 142: | Line 214: | ||
| 1976559 | | 1976559 | ||
| Primary Facility | | Primary Facility | ||
− | | 04 | + | | 2011-04-18 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 149: | Line 221: | ||
| 1979464 | | 1979464 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-10 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 156: | Line 228: | ||
| 1979466 | | 1979466 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-09 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 163: | Line 235: | ||
| 1979496 | | 1979496 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-09 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 170: | Line 242: | ||
| 1983161 | | 1983161 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-12 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 177: | Line 249: | ||
| 1983732 | | 1983732 | ||
| Primary Facility | | Primary Facility | ||
− | | 04 | + | | 2011-04-20 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 184: | Line 256: | ||
| 1983807 | | 1983807 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-04 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 191: | Line 263: | ||
| 1983812 | | 1983812 | ||
| Primary Facility | | Primary Facility | ||
− | | 05 | + | | 2011-05-11 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 198: | Line 270: | ||
| 2018481 | | 2018481 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2011-10-05 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 205: | Line 277: | ||
| 2027979 | | 2027979 | ||
| Primary Facility | | Primary Facility | ||
− | | 12 | + | | 2011-12-08 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 212: | Line 284: | ||
| 2051738 | | 2051738 | ||
| Primary Facility | | Primary Facility | ||
− | | 03 | + | | 2012-03-20 |
| Administrative/File Review | | Administrative/File Review | ||
| No Violations Noted | | No Violations Noted | ||
Line 219: | Line 291: | ||
| 2065239 | | 2065239 | ||
| Primary Facility | | Primary Facility | ||
− | | 04 | + | | 2012-04-03 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 226: | Line 298: | ||
| 2086051 | | 2086051 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2012-07-24 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 233: | Line 305: | ||
| 2100596 | | 2100596 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2012-09-06 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 240: | Line 312: | ||
| 2247336 | | 2247336 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2014-01-22 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 247: | Line 319: | ||
| 2247425 | | 2247425 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2014-01-21 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 254: | Line 326: | ||
| 2251811 | | 2251811 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2014-01-24 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 261: | Line 333: | ||
| 2251812 | | 2251812 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2014-01-28 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 268: | Line 340: | ||
| 2251849 | | 2251849 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2014-02-12 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 275: | Line 347: | ||
| 2251853 | | 2251853 | ||
| Primary Facility | | Primary Facility | ||
− | | 03 | + | | 2014-03-04 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
Line 310: | Line 382: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-003-22168 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.534375,"lon":-80.119433,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Kilbuck Township | |
Operator Name: AMER NATURAL RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: CHARLES LENZNER UNIT 2 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2011-03-14 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.534375 | |
Longitude: -80.119433 |
Date | Event |
---|---|
2011-03-14 | New Permit Application |
2011-05-05 | Performed Spud Operation |
2011-05-11 | Drilling Completion |
2014-02-12 | Drilling Completion |
2014-04-08 | NEWLY DRILLED |
2016-06-28 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 420.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 568.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1976559 | Primary Facility | 2011-04-18 | Drilling/Alteration | No Violations Noted | EXCAVATOR DIGGING PIT. |
1979464 | Primary Facility | 2011-05-10 | Drilling/Alteration | No Violations Noted | RIG DOWN. |
1979466 | Primary Facility | 2011-05-09 | Drilling/Alteration | No Violations Noted | USE RIG #7 RAN 9 5/8" CASING IN HOLE. CASING WILL BE CEMENTED LATER IN THE DAY. |
1979496 | Primary Facility | 2011-05-09 | Drilling/Alteration | No Violations Noted | DRILLING IS COMPLETE. THE SITE IS CLEAN AND DOZED. THE PIT LEVEL IS OK. |
1983161 | Primary Facility | 2011-05-12 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. EQUIPTMENT GONE. |
1983732 | Primary Facility | 2011-04-20 | Routine/Complete Inspection | No Violations Noted | On April 20th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road could use some additional rock. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1983807 | Primary Facility | 2011-05-04 | Routine/Complete Inspection | No Violations Noted | On May 4th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was being rocked. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1983812 | Primary Facility | 2011-05-11 | Routine/Complete Inspection | No Violations Noted | On May 11th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
2018481 | Primary Facility | 2011-10-05 | Drilling/Alteration | No Violations Noted | THE PIT IS OPEN. WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011. |
2027979 | Primary Facility | 2011-12-08 | Routine/Complete Inspection | No Violations Noted | E&S plan on site (originally only ofr one well but now includes Lenzer #3 & #4 also). |
2051738 | Primary Facility | 2012-03-20 | Administrative/File Review | No Violations Noted | On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #2. The well reached total depth on 5/11/11 and restoration should have been done by 2/11/12. |
2065239 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | PUMP JACK SET AND LOOKS TO BE IN USE. TANKS ARE SET. SITE RESTORED. |
2086051 | Primary Facility | 2012-07-24 | Routine/Complete Inspection | No Violations Noted | On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site. The new reclamation date is August 5, 2012. |
2100596 | Primary Facility | 2012-09-06 | Routine/Complete Inspection | No Violations Noted | On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #2 site to check the restoration progress. The site is in fair shape. Overall the it is vegetated but the silt fence is still up. We also did not see signs on the well itself. |
2247336 | Primary Facility | 2014-01-22 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | EXTREAM COLD PREVENTED EQUIPTMENT FROM STARTING. PLUGGING IS DELAYED. |
2247425 | Primary Facility | 2014-01-21 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | OIL AND BRINE TANKS ARE STILL ON THE PAD. FRONTIER ENERGY SERVICE RIG IS SET UP TO PLUG THIS WELL. |
2251811 | Primary Facility | 2014-01-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | APPALACHIAN WELL SERVICES HAS SET BOTTOM PLUG FROM TD TO 1,637'. HIGHER PLUGS WILL BE SET LATER. |
2251812 | Primary Facility | 2014-01-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | RIG IS DOWN. PLUGGING IS NOT COMPLETE. TANKS ARE ON THE PAD. |
2251849 | Primary Facility | 2014-02-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WELL IS PLUGGED. 7" BOND LOG WAS POSITIVE. PROPER PLUGS WERE SET. PEA GRAVEL WILL BE ADDED. |
2251853 | Primary Facility | 2014-03-04 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WELL IS PLUGGED. VENTED MARKER WITH API NUMBER IS INSTALLED. STORAGE TANKS ARE GONE. |
For data sources see[7]